RC-0457-2019TOWN OF QUEENSBURY
742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201
Community Development - Building & Codes (518) 761-8256
BUILDING PERMIT
RC-0457-2019PermitNumber:
308.8-2-74TaxMapNo:
Kim CordovaniPermissionisherebygrantedto:
23 LANCESTIRE DRForpropertylocatedat:
In theTown ofQueensbury, to construct orplace atthe above location in accordance with application together
with plot plans and other information hereto filed and approved and incompliance with the NYS Uniform
Building Codes and theQueensbury Zoning Ordinance
Type ofConstruction
Kim Cordovani$60,000.00OwnerName:Single Family - Addition
Owner Address:23 LANCESTIRE DR Total Value 60,000.00
Queensbury, NY 12804
Contractor orBuilder'sName / AddressElectrical Inspection Agency
Plans & Specifications
Residential Interior Alterations 528 s.f.
Garage: 1064 s.f. 1st floor, 532 s.f. 2nd floor storage only
803.80 Friday, July 10, 2020PERMITFEEPAID - THIS PERMIT EXPIRES:
Ifalonger period isrequired, anapplication for an extension must bemade to the code Enforcement Officer
ofthe Town ofQueensbury before the expiration date.)
Thursday, July 11, 2019DatedattheTownofQueensbury
SIGNED BY:for theTown ofQueensbury.
Director of Building & Code Enforcement
Office Use Only
1°11111k)
ADDITION/ALTERATION PERMIT Permit#: Fes. — 61A5') 'ZO1
APPLICATION Permit Fee: $ C2'1--$S.ga
fown of Qucensbury
742 Bay Road,Queensbury, NY 12804 Invoice #: 1¢,4
P: 518-761-8256 www.queensbury.net
Project Location: vZ 3 L yi I- -e -b:
Tax Map ID #: 30I. g- -7(4-- Subdivision Name: (3Od Jk.tcre
zo .-Q 4r -- (0/(t 1 t et 3
CONTACT INFORMATION: v( sg.-...)-4
Applicant:
i I
Name(s): .. )e,.^s tic_c_S . (..iOJ
Mailing Address, C/S/Z: 2.3 Lc,tace,s,Picz._ U, i' i s Lf ivy i Z.Ytt 4
Cell Phone: RS-1" ) ^TyW—L1,3'YL Land Line: (
Email: J \t„. 1 ,-uv a 11y L , R 4 ,
Primary Owner(s):
II
Name(s): Key. e 'cts.ic...,i
Mailing Address, C/S/Z: 2,1 Lc;, h.C,s +;.,z ir- O ue,ens k .- 1 ViOy-1
Cell Phone: (J1'( ) 2_5 - 1--17V Land Line: ( I)
Email: k i i\ C 0 'P 6-rA.,•\1.-Lti A--
Check if all work will be performed by homeowner only
Contractor(s): Workers' Comp documentation must be submitted with this application
Contact Name(s):
Contractor Trade:
Mailing Address, C/S/Z:
Cell Phone: ( Land Line: (
Email:
List all additional contractors on the back of this form
Architect(s)/Engineer(s):
Business Name:
Contact Name(s):
Mailing Address, C/S/Z:
Cell Phone: ( Land Line: (
Email:
Contact Person for Building & Code Compliance:
N)
c,ti-t_1• (Ls., IA Uj
Cell Phone: ( ( ) /-L1 % Land Line: (
Email:'
Y
if r.,, i C,i e V,[ 0 • ,^/`.c, .‘
Addition/Alteration Application Revised February 2019
PROJECT INFORMATION:
TYPE: Commercial k Residential
WORK CLASS:
Single-Family Two-Family Multi-Family (#of units
Townhouse Business Office Retail
Industrial/Warehouse _Garage (#of cars Other (describe
Pet onci Ca 46v
ADDITION SQUARE FOOTAGE: Cle' e ALTERATION SQUARE F A
1st floor: OIGLA 1st floor: 5-2,Y koa"`
2nd floor: S31, c---Skrt-aNly 2nd floor: et tc,
3rd floor: 3rd floor: et/4
Basement (habitable space): kite.Basement (habitable space): 0/4
Total square feet: t`Jal o Total square feet:
ADDITIONAL PROJECT INFORMATION:
r
1. Estimated Cost of Construction: $ 00-0
2. If Commercial project, what is the proposed use:
3. Source of Heat (circle one): a Oil Propane Solar Other
Fireplaces need a separate Fuel Burning Appliances &Chimney Application
4. Are there any structures not shown on the plot plan? YES NO xplain:
5. Are there any easements on the property? YES NO
6. SITE INFORMATION:
a. What is the dimensions or acreage of the parcel? t Z 06 S ri.C`CS
b. Is this a corner lot? YES 0
c. Will the grade be changed as a result of the construction? YES NO
d. What is the water source? UBLIC PRIVATE WE L
e. Is the parcel on SEWER or a PRIVATE SEPTIC system?
Addition/Alteration Application Revised February 2019
Office Use Only
Permit#: G p`!y'k ' P.lS_
FUEL BURNING APPLIANCE &
CHIMNEY APPLICATION Permit Fee:$12 '
E Invoice#:
742 Bay Road,Queensbury,NY 12804
P:518-761-8256 www,queensburY•rt;
Project Location:
Tax Map ID: • v 2-1
Room of Install. (
1 "`''`Planned Install Date:t I.
ONE APPLICATION PER APPLIANt ' CEng"` 1
JUL 0 9 20)9
M 1Te T INFOR
TOWN OF QUEENSBURY
BUILBiNG&CODES
Applicant:
LD1NG
Name(s):1 Zo` ----
Mailing Address, C/S/Z: •Z
Cell Ph.:0) __4 .--'-l'3` Land Line: __( 1
Email:
Primary Owners :
Name(s): s -•
Mailing Address, C/S/Z:
r t
L
Cell Ph.: __( t) -L _ Land Line: (
Email:rKr„ C v.
Check if all work will be performed by homeownermustbe submitted with this applicationInstaller/Builder: Workers' Comp document
EE
F'.a,s i 'Fr Arkk.
ei`A- \(^-
C/S/Z:
r Land Line: _( i_.)
Cell Phone:_( '—rLa ,
Line
Email: et.‘q)
Contact Person for Building & Code Compliance:S Z+ ) `+'
Cell Ph.:
Land Line:
T
Email:ur C c:ram 4i ," •J \Cn • iv.i- \G LLN c0„
Revised February 2019
Principle Structure Packet
FUEL BURNING APPLIANCE INFORMATION:
TYPE OF DEVICE:
Stove
Fireplace Insert Fireplace
Fuel Fired Equipment (Garage Only, 18" clearance per IMC 304.3)w C 1ICOS - R
e factorybuilt**
Vi C 10 r»
l
Fireplac , P
Manufacturer's name: 1 ` '`
eau Model#:
SOURCE OF HEAT:
Coal Pellet Gas - Nek.k . G 5.
Wood
CHIMNEY INFORMATION:
Masonry (require plans to be submitted):
block ____brick _stone
Flue:
G /k
tile steel ___ size, in inchestt
Material*: insulated S$ ''U
double-wall triple-wall_ LL ,,.
T Model #: II': `
Manufacturer's name: S JS u J (Al cc.y.tA'•
ADDITIONAL INFORMATION:
1. Two inspections are required. A rough-in inspection, prior to installation and a final inspection, after
installation.
2. Manufacturer's installation manual must be availableo b atsub the time of inspection.
3. Masonry fireplaces &chimneys require plans
d.
4. Twenty-four (24) hour notification is required for inspections.5. Workers' Comp insurance information is required with this application.
de
Dela_ ration:Construction/installation must conform t NWthrreall applicable
nlawBuodrdiganoes,aeg oatregulations and all conditions
r manufacturer
requirements. The applicant or owner agrees to complythatarepartoftheserequirementsandalsowillallowthe inspector to enter the premises to perform the required
inspections.
I have read and agree to the above:
PRINT NAME:
DATE: `I
SIGNATURE:
Revised February 2019
Principle Structure Packet
REScheck Software Version 4..6.5
cii Compliance Certificate
Project addition
308.8-2-74 RC-0457-2019
Energy Code: 2015 IECC Cordovani, Kim
Location: Glens Falls, New York 23 Lancestire Dr
Construction Type: Single-family Res Alt 528 s.f., Garage 1596 s.f.Project Type: Addition
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
23 Lancestire Drive James Vasiliou
Queensbury, NY 23 Lancestire Drive
Queensbury, NY 12804
518-744-4386
jvasiliou@nycap.rr.com
Compliance: Passes using UA trade-off
Compliance: 4.9%Better Than Code Maximum UA: 82 Your UA: 78
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area
Assembly or
R
Ca Cont.R-Value U-Factor UA
Perimeter
Ceiling 1: Flat Ceiling or Scissor Truss 526 38.0 0.0 0.030 16
Wall 1: Wood Frame, 16" o.c. 560 21.0 0.0 0.057 27
Window 1:Vinyl/Fiberglass Frame:Triple Pane with Low-E 30 0.180 5
Door 1: Solid 21 0.140 3
Door 2:Glass 42 0.300 13
Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 526 38.0 0.0 0.026 14
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.5 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
1.......-SOF NEly03OKEITiye0A0,91
Q./
N
1,
t ill
41 r,
tul
NP
Project Title: addition
1
1 I c Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 1 of 9
ciREScheck
Software
VersionChecklist4.6.5
Energy Code: 2015 IECC
Requirements: 94.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section I
Plans Verified i Field Verifiedi # I Pre-Inspection/Plan Review '
Value i Value Complies? i Comments/Assumptions
i& Req.ID1 1-
103.1, Construction drawings and Complies Requirement will be met.
103.2 documentation demonstrate Does Not
PR1]i energy code compliance for the
building envelope.Thermal Not Observable
envelope represented on Not Applicable
construction documents.
103.1, Construction drawings and Complies Requirement will be met.
103.2, documentation demonstrate Does Not
403.7 energy code compliance for
PR3]1 lighting and mechanical systems. Not Observable
Systems serving multiple Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: Complies Requirement will be met.
1403.7 sized per ACCA Manual S based Btu/hr Btu/hr Does Not
PR2]2 on loads calculated per ACCA Cooling: Cooling:Manual J or other methods Not Observable
Btu/hr Btu/hr
approved by the code official.Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) j 3 1Low Impact(Tier 3) j
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 2 of 9
Section
Foundation Inspection Complies? Comments/Assumptions
RegJD
j303.2.1 A protective covering is installed to Complies 'Exception: Requirement is not applicable.
FO11]2 protect exposed exterior insulation Does Not
and extends a minimum of 6 in. below
grade.
Not Observable
Not Applicable
1403.9 Snow-and ice-melting system controls Complies Exception: Requirement is not applicable.
i(FO12]2 installed. Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 jLow Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 3 of 9
Section
iFramin /Rough-In Inspection Plans Verified 1 Field Verified 1 l
J 9 p Complies? 1 Comments/Assumptions
Req.ID 1
Value ! Value j1
402.1.1, Door U-factor.U- U- Complies See the Envelope Assemblies
402.3.4
Does Not table for values.
FR111
Not Observable
ONot Applicable
402.1.1, Glazing U-factor(area-weighted U- U- Complies See the Envelope Assemblies
402.3.1, average).
Does Not table for values.
402.3.3,
402.5 ONot Observable
FR2]1 ONot Applicable
303.1.3 U-factors of fenestration products Complies Requirement will be met.
FR4]1 are determined in accordance Does Not
with the NFRC test procedure or
taken from the default table. Not Observable
ONot Applicable
402.4.1.1 Air barrier and thermal barrier Complies Requirement will be met.
FR23]1 installed per manufacturer's Does Not
instructions.
Not Observable
ONot Applicable
402.4.3 Fenestration that is not site built Complies Requirement will be met.
FR2O]1 is listed and labeled as meeting Does Not
AAMA/WDMA/CSA 101/1.S.2/A440
ONot ObservableorhasinfiltrationratesperNFRC
400 that do not exceed code ONot Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures Complies Requirement will be met.
j[FR16}2 sealed at housing/interior finish ODoes Not
and labeled to indicate 5.2.0 cfm
leakage at 75 Pa. ONot Observable
Not Applicable
403.3.1 Supply and return ducts in attics Complies Exception: Ducts located
FR12]1 insulated >= R-8 where duct is Does Not completely inside the
3 inches in diameter and >= building envelope.
R-6 where< 3 inches. Supply and Not Observable
return ducts in other portions of ONot Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for<3 inches in diameter.
403.3.5 Building cavities are not used as Complies Requirement will be met.
1[FR15]3 ducts or plenums. EDoes Not
ONot Observable
Not Applicable
403.4 HVAC piping conveying fluids R- R- Complies Exception: Requirement is
FR17]2 above 105 4F or chilled fluids Does Not not applicable.
below 55 4F are insulated to >—R-
3- DNot Observable
Not Applicable
403.4.1 Protection of insulation on HVAC Complies Exception: Requirement is
FR24]1 piping. Does Not not applicable.
ONot Observable
ONot Applicable
403.5.3 Hot water pipes are insulated to R- R- Complies Exception: Requirement isI[FR18]2 >_R-3. Does Not not applicable.
ONot Observable
I — ONot Applicable
403.6 Automatic or gravity dampers are Complies Requirement will be met.
FR1912 installed on all outdoor air Does Not
intakes and exhausts.
Not Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) J
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 4 of 9
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) j 37 Low Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 5 of 9
Section
Plans Verified Field Verified1InsulationInspection
Value Value Complies? I Comments/Assumptions
Req_ID.
303.1 All installed insulation is labeled Complies Requirement will be met.I[IN13)2 or the installed R-values Does Not
provided.
i - Not Observable
Not Applicable
402.1.1, Floor insulation R-value. R- R- Complies See the Envelope Assemblies
402.2.6 0 Wood Wood Does Not table for values.
I[IN1)1
0 Steel Steel Not Observable
f Not Applicable
303.2, Floor insulation installed per Complies Requirement will be met.
402.2.7 manufacturer's instructions and Does Not
IN2)1 in substantial contact with the
underside of the subfloor,or floor Not Observable
framing cavity insulation is in ONot Applicable
contact with the top side of
sheathing,or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
402.1.1, Wall insulation R-value. If this is a R- R- Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/
2 of the Wood Wood Does Not table for values.
402.2.6 wall insulation on the wall
IN311 exterior,the exterior insulation
Mass 1] Mass Not Observable
requirement applies(FR10).LI Steel Steel Not Applicable
303.2 Wall insulation is installed per Complies Requirement will be met.
IN4)1 manufacturer's instructions. Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) ; 3 I Low Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Iim\Documents\REScheck\addition.rck Page 6 of 9
Section Plans Verified I Field Verified1 # I Final Inspection Provisions
Value I Value
Complies? Comments/Assumptions
diReq.ID, j_
402.1.1, Ceiling insulation R-value. R- R- Complies See the Envelope Assemblies
402.2.1, 0 Wood Wood Does Not table for values.
402.2.2,
402.2.E
Steel Steel Not Observable
FIl]1 ONot Applicable
303.1.1.1, Ceiling insulation installed per Complies Requirement will be met.
303.2 manufacturer's instructions. ODoes Not
FI2]1 Blown insulation marked every
300 ft2. ONot Observable
ONot Applicable
402.2.3 Vented attics with air permeable Complies Requirement will be met.
FI22]2 insulation include baffle adjacent ODoes Not
to soffit and eave vents that
extends over insulation. ONot Observable
ONot Applicable
402.2.4 Attic access hatch and door R- R- Complies
FI3]1 insulation zR-value of the Does Not
adjacent assembly.
Not Observable
ONot Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50= ACH 50 = Complies
FI17]1 ach in Climate Zones 1-2,and ODoes Not
3 ach in Climate Zones 3-8.
Not Observable
ONot Applicable
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 Complies Exception:All ducts and air
Fl4]1 cfm/100 ft2 across the system or ft2 ft2 Does Not handlers are located within
3 cfm/100 ft2 without air Not Observable conditioned space.handler @ 25 Pa. For rough-in
tests,verification may need to ONot Applicable
occur during Framing Inspection.
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 Complies Exception:All ducts and air
FI27]1 determine air leakage with ft2 ft2 Does Not handlers are located within
either:Rough-in test:Total ONot Observable conditioned space.leakage measured with a
pressure differential of 0.1 inch ONot Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated Complies Exception: Requirement is
FI24]1 by manufacturer at<=2%of ODoes Not not applicable.
design air flow.
ONot Observable
Not Applicable
403.1.1 Programmable thermostats Complies Requirement will be met.
FI9]2 installed for control of primary ODoes Not
heating and cooling systems and
initially set by manufacturer to Not Observable
code specifications. ONot Applicable
403.1.2 Heat pump thermostat installed Complies Exception: Requirement is
FI10]2
on heat pumps.ODoes Not not applicable.
Not Observable
ONot Applicable
403.5.1 Circulating service hot water Complies Exception: Requirement is
F1ll]2 systems have automatic or Does Not not applicable.
accessible manual controls.
ONot Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) [ 3 1 Low Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 7 of 9
Section
Plans Verified Field Verified I I
Re ID
Final inspection Provisions
Value Value
Complies? Comments/Assumptions
q.lD -- L
I-403.6.1 All mechanical ventilation system Complies Exception: Requirement is
j[FI2512 fans not part of tested and listed Does Not not applicable.
HVAC equipment meet efficacy
and air flow limits. Mot Observable
Not Applicable
403.2 Hot water boilers supplying heat Complies Exception: Requirement is
FI26]2 through one-or two-pipe heating Does Not not applicable.
systems have outdoor setback
control to lower boiler water Not Observable
temperature based on outdoor Not Applicable
temperature.
403.5.1.1 Heated water circulation systems Complies Exception: Requirement is
F12812 have a circulation pump.The Does Not not applicable.
system return pipe is a dedicated
return pipe or a cold water supply
Not Observable
pipe. Gravity and thermos- Not Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 Electric heat trace systems Complies Exception: Requirement is
FI29]2
comply with IEEE 515.1 or UL Does Not not applicable.
515. Controls automatically
adjust the energy input to the Not Observable
heat tracing to maintain the Not Applicable
desired water temperature in the
piping.
403.5.2 Water distribution systems that Complies Exception: Requirement is
1[F130]2 have recirculation pumps that Does Not not applicable.
pump water from a heated water
supply pipe back to the heated Not Observable
water source through a cold Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1049F.
403.5.4 Drain water heat recovery units Complies Exception: Requirement is
FI31]2 tested in accordance with CSA Does Not not applicable.
B55.1. Potable water-side
pressure loss of drain water heat Not Observable
recovery units < 3 psi for Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent Complies Requirement will be met.
FI611 fixtures or 75%of permanent Does Not
fixtures have high efficacy lamps.
Does not apply to low-voltage
Not Observable
lighting. Not Applicable
404.1.1 Fuel gas lighting systems have Complies Requirement will be met.
1[FI23]3 no continuous pilot light. Does Not
DNot ObservableLNotApplicable
1 High Impact(Tier 1) 2 I Medium Impact(Tier 2) j 3 !Low Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\Jim\Documents\REScheck\addition.rck Page 8 of 9
Section i Plans Verified I Field Verified
Final Inspection Provisions
Value_
1 IValue Complies? I Comments/Assumptions
401.3 Compliance certificate posted.Complies Requirement will be met.
FI7)2
Does Not
Not Observable
Not Applicable
303.3 Manufacturer manuals for Complies Requirement will be met.
FI1813 mechanical and water heating Does Not
systems have been provided.ENot Observable
Not Applicable
Additional Comments/Assumptions:
j 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2)7 3 'Low Impact(Tier 3)
Project Title: addition Report date: 06/09/19
Data filename: C:\Users\jim\Documents\REScheck\addition.rck Page 9 of 9
1 20EllEfficiency
15IECC Energy
Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 0.00
Floor 38.00
Ceiling / Roof 38.00
Ductwork(unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.18
Door 0.30
Heating &Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments