Loading...
Wedgewood Apts concrete test report 14 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Fax: (518) 399-1913 CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:6 INSPECTOR & TEST SET: BOB BEHAN #6 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 4562 / 813359 4561 / 813360 4523 / 813361 10.00 / 10.00 2 10.00 / 20.00 3 10.00 / 30.00 3.35 1.40 / 2.00 0 ##2.10 / 2.33 0 2.45 / 3.05 0 2.05 / 2.24 # 2 2.36 / 2.51 ##3.08 / 3.21 3.00 MAX: 1.50 )1 0.73 0 2 0.68 0 2 0.60 0 0.40 5.00 2 0.10 5.00 2 0.45 5.00 3 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.21 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 ) 5.00 0 5.00 0 5.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 4.40 0 0.00 0 0.00 0379700 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 143.82 0 0.00 0 0.00 0 - 90 ) 78 0 79 0 78 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 166438 - 166443 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.166438 06/29/16 7 2420 X COARSE AGGREGATE #2: LBS.166439 06/29/16 7 2240 X COARSE AGGREGATE #3: LBS.166440 07/20/16 28 3310 0 FINE AGGREGATE: LBS.166441 07/20/16 28 3190 0 ADMIXTURE #1: OZS.166442 07/20/16 28 3400 0 ADMIXTURE #2: OZS.166443 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: BUILDING #1: FOOTING: SOUTH WALL, EAST HALF BUILDING #1: FOOTING: SOUTH WALL, WEST HALF PLACEMENT LOCATION OF LOAD # BUILDING #1: FOOTING: WEST WALL 0.00 45 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 3000 0 JOINTA-GALUSHA, LLC 0 ULTIMATE 06/23/16 4.00 0 0.0 0 0 0 0 40,100 0 0 0 0 0 0 8: 1: FILE 2: SUPPLIER 28,100 0 0 41,550 42,700 0 0 DISCREPANCIES & REMARKS: 0.0 4: 0.0 5: 6: 7: 0 0 DESIGN STRENGTH & FORMULA: 3: TIME CONC. BATCHED / ARRIVED: 30,450 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: LAB CYLINDER CONTROL NUMBERS: WATER: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): IF APPLICABLE: PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY. Tom Joslin Tom Joslin Tom Joslin Tom Joslin APPLIED LOAD 1 06/22/16 1162.009 166438 60's: CLEAR 4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Fax: (518) 399-1913 CLIENT: REPORT NUMBER: : PAGE #: 2 INSPECTION DATE: OUR FILE NUMBER:6 INSPECTOR & TEST SET: BOB BEHAN #6 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 4 : 0 0 0 0 0 0 4 0 0 0 4574 / 813362 0 0 0 0 0 0 10.00 / 40.00 4 0.00 0 0.00 0 0.00 0 0.00 0 3.10 / 3.25 0 ## 0.00 0 0.00 0 0.00 0 0.00 0 3.26 / 3.45 # 0 0.00 0 0.00 ## 0.00 0 0.00 0.00 MAX: 1.50 )3 0.58 0 0 0.00 0 0 0.00 0 0.10 5.00 3 0.00 0.00 0 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 ) 5.00 0 0.00 0 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 )0.00 0 0.00 0 0.00 0000 UNIT WEIGHT (PCF) (SPEC:-0.00 )0.00 0 0.00 0 0.00 0 - 90 ) 79 0 0 0 0 0 NUMBER OF TEST SPECIMEN CAST:0 0 0 0 0 0 0 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.0 01/00/00 0 0 X COARSE AGGREGATE #2: LBS.0 01/00/00 0 0 X COARSE AGGREGATE #3: LBS.0 01/00/00 0 0 X FINE AGGREGATE: LBS.0 01/00/00 0 0 X ADMIXTURE #1: OZS.0 01/00/00 0 0 X ADMIXTURE #2: OZS.0 01/00/00 0 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X Tom Joslin Tom Joslin Tom Joslin Tom Joslin APPLIED LOAD 1 06/22/16 1162.009 0 60's: CLEAR PROJECT: CONSTRUCTION TECHNOLOGY MR. DARREN VanDeWARKER SCHEMERHORN CONSTRUCTION, INC. 536 BAY ROAD, SUITE 2 QUEENSBURY, NEW YORK 12804 WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY. IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): LAB CYLINDER CONTROL NUMBERS: WATER: 0 0 DESIGN STRENGTH & FORMULA: 3: TIME CONC. BATCHED / ARRIVED: 0 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 0 JOINTA-GALUSHA, LLC 0 ULTIMATE 06/23/16 4.00 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 3000 BUILDING #1: FOOTING: EAST WALL 0 PLACEMENT LOCATION OF LOAD # 0 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: