Loading...
BINS-000360-2019 01232019 INSPECTION WORKSHEET (BINS-000360-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-000365-2016Permit Case Number:Case Module: Wed Jan 23, 2019Partial Pass Inspection Date:Inspection Status: John O'BrienBuilding Framing Inspector:Inspection Type: 44, 46, 50, 52, 56, 58, 62, 64 Wedgewood302.9-1-28.1 Job Address:Parcel Number: DR Bldg. 4 Queensbury, NY 12804 Contact TypeCompany NameName ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN Primary OwnerSCHERMERHORN WEDGEWOOD LLC Granted PermissionSchermerhorn R.E. HoldingsVANDERWARKER, DARREN ArchitectRucinski-Hall Architecture ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN Checklist ItemPassedComments Building Inspector NotesNO6/29/18 Ice & Water Shield Approved 1/23/19 Framing Partial Approval - Preliminary Framing - Anchor bolts are missing in some garage and rear bump out exterior walls. Some bolts are to close to the edge of the bottom plates and further than 6' oc. - Check stair landings missing toe nails in hangers. - Bridging missing at outside box area and at stair opening. Check after trades have completed their work. - Truss Bracing was better on this building but blocking missing at the following location. I believe the T01 Truss should be tied into the T01SGE need your input. - Garage Truss north of step has cracked bottom chord need repair. - Truss clip missing nails on one side on garage truss. - Spoke with Ethan earlier still waiting for accurate layout of shear anchors. Jan 23, 2019Page (1) INSPECTION WORKSHEET (BINS-000360-2019) Checklist ItemPassedComments FramingNO1/23/19 Framing Partial Approval - Preliminary Framing - Anchor bolts are missing in some garage and rear bump out exterior walls. Some bolts are to close to the edge of the bottom plates and further than 6' oc. - Check stair landings missing toe nails in hangers. - Bridging missing at outside box area and at stair opening. Check after trades have completed their work. - Truss Bracing was better on this building but blocking missing at the following location. I believe the T01 Truss should be tied into the T01SGE need your input. - Garage Truss north of step has cracked bottom chord need repair. - Truss clip missing nails on one side on garage truss. - Spoke with Ethan earlier still waiting for accurate layout of shear anchors. Attic Access 22 x 30 minimumNO Jack Studs HeadersNO Continuous Header for Garage Doors withNO Straping Truss Specification ProvidedNO Bracing BridgingNO Hurricane Clips/Uplift Screws/Nail Holes FilledNO Air Seal all Plates and SillsNO Air Seal All Registers at FloorNO Air Sealing all Joints Before InsulationNO Joist hangersNO Jan 23, 2019Page (2) INSPECTION WORKSHEET (BINS-000360-2019) Checklist ItemPassedComments Jack Posts Main BeamsNO Exterior sheeting nailed properlyNO 12 O.C.NO Headroom 6 ft. 8 in.NO Notches Holes Bearing WallsNO Metal Strapping for Notches Top PlateNO Draft stopping 1,000 sq. ft. floor trussesNO Anchor Bolts 6 ft. or less on centerNO Ice and water shield 24 inches from wallYES6/29/18 Ice & Water Shield Approved Soffits-Insulation BaffelNO Windows Habitable Space BedroomsNO 24 in. (H)NO 20 in. (W)NO 5.7 sf above below gradeNO 5.0 sf gradeNO Design Professional Sign-off, if requiredNO O'Brien, John (Inspector) Jan 23, 2019Page (3)