Loading...
BINS-002938-2019 05232019INSPECTION WORKSHEET (BINS-002938-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000365-2016 Case Module:Permit Inspection Date:Thu May 23, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:44, 46, 50, 52, 56, 58, 62, 64 Wedgewood DR Bldg. 4 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Architect Rucinski-Hall Architecture Granted Permission Schermerhorn R.E. Holdings VANDERWARKER, DARREN Primary Owner SCHERMERHORN WEDGEWOOD LLC Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN Checklist Item Passed Comments Building Inspector Notes NO 5/21/19 Insulation Partial Approval- Building 4(1st Floor) - Sound Insulation 1st floor end units corridor ceilings. 5/23/19 Insulation Partial Approval - Building 4(1st Floor) - Sound Insulation at common walls between middle units at utility soffits 1st Floor. Also insulation behind rear exterior wall soffits. - Insulation at common walls to garage and front entrances of middle units. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO May 23, 2019 Page (1) INSPECTION WORKSHEET (BINS-002938-2019) Checklist Item Passed Comments Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 5/21/19 Insulation Partial Approval- Building 4 - Sound Insulation 1st floor end units corridor ceilings. 5/23/19 Insulation Partial Approval - Building 4(1st Floor) - Sound Insulation at common walls between middle units at utility soffits 1st Floor. Also insulation behind rear exterior wall soffits. - Insulation at common walls to garage and front entrances of middle units. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Air Barrier behind Knee Walls NO Tub Shower R-20 with Vapor Barrier NO All Ductwork Sealed Return and Supply NO Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO May 23, 2019 Page (2) O'Brien, John (Inspector)