Loading...
SEP-002404-2019 05022019INSPECTION WORKSHEET (SEP-002404-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000365-2016 Case Module:Permit Inspection Date:Thu May 2, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Septic Job Address:Parcel Number:44, 46, 50, 52, 56, 58, 62, 64 Wedgewood DR Bldg. 4 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Primary Owner SCHERMERHORN WEDGEWOOD LLC Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN Granted Permission Schermerhorn R.E. Holdings VANDERWARKER, DARREN Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN Architect Rucinski-Hall Architecture Checklist Item Passed Comments Building Inspector Notes YES 4/19/19 Septic System Partial Approval - Building #4 - Engineer's Final Report - Install sanitary line from building #4 to septic tank of field #2 5/2/19 Septic System Approved - Received Certified As-Built Septic Plot Plan for Wedgewood Apartments. Type of Water: Municipal / Well Water YES Municipal Absorbtion Fields: Total Length YES 2 @ 420' Length of Each Trench YES 2 x 7@60' May 02, 2019 Page (1) INSPECTION WORKSHEET (SEP-002404-2019) Checklist Item Passed Comments Depth of Trenches YES 18"-24" Size of Stone YES #2 Building to Tank YES Septic System #1 4" sch40 pvc Septic System #2 Not Installed 5/2/19 Sanitary line from building #4 to septic tank installed with inlet baffle at septic tank. Tank to Distribution Box YES 4" sdr35 pvc Distribution box to Field / Pit YES 4" sdr35 pvc to 4" sdr35 pvc perforated InletOutlet Pipes & Baffles YES Septic System #1 4" sch40 pvc Septic System #2 Not Installed Foundation to Tank YES 18' + Foundation to Absorption YES Leach field #1 30' + off Bldg #4 Leach field #2 25' + off Bldg #6 Conforms as per Plot Plan YES As per as-built Engineer Report and As-Built YES - Engineer's Final Report Location of system on property YES Rear of building #4 & #6 System Use Status YES 4/19/19 Septic System Partial Approval - Building #4 - Engineer's Final Report - Install sanitary line from building #4 to septic tank of field #2 5/2/19 Septic System Approved - Received Certified As-Built Septic Plot Plan for Wedgewood Apartments. May 02, 2019 Page (2) O'Brien, John (Inspector)