SEP-002405-2019 05022019INSPECTION WORKSHEET (SEP-002405-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000366-2016 Case Module:Permit
Inspection Date:Thu May 2, 2019 Inspection Status:Passed
Inspector:John O'Brien Inspection Type:Septic
Job Address:Parcel Number:51, 53, 57, 59, 63, 65, 69, 71 Wedgewood
DR Bldg 5
Queensbury, NY 12804
302.9-1-28.1
Contact Type Company Name Name
Primary Owner SCHERMERHORN WEDGEWOOD
LLC
Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Granted Permission Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Architect Rucinski-Hall Architecture
Checklist Item Passed Comments
Building Inspector Notes YES 4/16/19 Septic System Partial Approval - Building #5
- Provide Engineer's Report and Certified Septic System
As-Built.
- Install sanitary line from building to septic tank at Field #2
at south end of building #5
5/2/19 Septic System Approved
- Received Certified As-Built Septic Plot Plan for Wedgewood
Apartments.
Type of Water: Municipal / Well Water YES Municipal
Absorbtion Fields: Total Length YES 2 @ 420'
Length of Each Trench YES 2 x 7@60'
May 02, 2019 Page (1)
INSPECTION WORKSHEET (SEP-002405-2019)
Checklist Item Passed Comments
Depth of Trenches YES 18"-24"
Size of Stone YES #2
Building to Tank YES Not installed
Foundation to Tank YES 14'+
Foundation to Absorption YES Field #1 38'+
Field #2 31'+
Conforms as per Plot Plan YES As per as-built
Engineer Report and As-Built YES 4/16/19 Septic System Partial Approval - Building #5
- Provide Engineer's Report and Certified Septic System
As-Built.
- Install sanitary line from building to septic tank at Field #2
at south end of building #5
Location of system on property YES Field #1 middle rear
Field #2 south end rear
System Use Status YES 4/16/19 Septic System Partial Approval - Building #5
- Provide Engineer's Report and Certified Septic System
As-Built.
- Install sanitary line from building to septic tank at Field #2
at south end of building #5
5/2/19 Septic System Approved
- Received Certified As-Built Septic Plot Plan for Wedgewood
Apartments.
May 02, 2019 Page (2)
O'Brien, John (Inspector)