Loading...
Signed Inspection Report (02-03-2020) (13).pdfINSPECTION WORKSHEET (BINS-000699-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:AST-0593-2019 Case Module:Permit Inspection Date:Mon Feb 3, 2020 Inspection Status:Failed Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:133 Jenkinsville RD Queensbury, NY, 12804 279.-1-21 Contact Type Company Name Name Primary Owner TOWN OF QUEENSBURY REC DEPT Concrete Contractor A.J. Catalfamo Construction Co., Inc. Granted Permission TOWN OF QUEENSBURY REC DEPT Architect Rucinski-Hall Architecture Checklist Item Status Building Inspector Notes Failed 2/3/20 Framing Not Approved Remaining Items: - Structural steel needs to be inspected by a third party engineer. - Framing needs to be inspected behind fire retardant plywood. Remove one sheet of fire retardant plywood from each wall so we may verify the framing. - Workshop has not been framed in accordance with the approved walls. Please let us know if this has been deleted from project. Framing Failed 2/3/20 Framing Not Approved Remaining Items: - Structural steel needs to be inspected by a third party engineer. - Framing needs to be inspected behind fire retardant plywood. Remove one sheet of fire retardant plywood from each wall so we may verify the framing. - Workshop has not been framed in accordance with the approved walls. Please let us know if this has been deleted from project. Feb 03, 2020 Page (1) INSPECTION WORKSHEET (BINS-000699-2020) Checklist Item Status Jack Studs Headers Failed Bracing Bridging Failed Air Seal all Plates and Sills Failed Air Seal All Registers at Floor Failed Air Sealing all Joints Before Insulation Failed Jack Posts Main Beams Failed Anchor Bolts 6 ft. or less on center Failed Design Professional Sign-off, if required Failed 2/3/20 Framing Not Approved Remaining Items: - Structural steel needs to be inspected by a third party engineer. - Framing needs to be inspected behind fire retardant plywood. Remove one sheet of fire retardant plywood from each wall so we may verify the framing. - Workshop has not been framed in accordance with the approved walls. Please let us know if this has been deleted from project. Feb 03, 2020 Page (2) O'Brien, John