Signed Inspection Report (02-03-2020) (16).pdfINSPECTION WORKSHEET (BINS-000703-2020)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:AST-0593-2019 Case Module:Permit
Inspection Date:Mon Feb 3, 2020 Inspection Status:Failed
Inspector:John O'Brien Inspection Type:Building Insulation
Job Address:Parcel Number:133 Jenkinsville RD
Queensbury, NY, 12804
279.-1-21
Contact Type Company Name Name
Architect Rucinski-Hall Architecture
Concrete Contractor A.J. Catalfamo Construction Co., Inc.
Granted Permission TOWN OF QUEENSBURY REC
DEPT
Primary Owner TOWN OF QUEENSBURY REC
DEPT
Checklist Item Status
Building Inspector Notes Failed
2/3/20 Insulation Not Approved
Remaining Items:
- Remove a sheet of fire retardant plywood from each wall to verify the insulation in wall has been installed
correctly.
- Provide documentation that states that R38 insulation has been installed in ceiling and R21 has been installed in
the exterior walls as per the approved COMcheck Energy Code Compliance Report.
- Provide documentation that the windows and insulated door have the correct U value as per the approved
COMcheck Energy Code Compliance Report.
Window Sealing Failed
U Factors = .3 cfm for windows, .5 cfm for doors Failed
Feb 03, 2020 Page (1)
INSPECTION WORKSHEET (BINS-000703-2020)
Checklist Item Status
Insulation Residential Check Commercial Check Failed
2/3/20 Insulation Not Approved
Remaining Items:
- Remove a sheet of fire retardant plywood from each wall to verify the insulation in wall has been installed
correctly.
- Provide documentation that states that R38 insulation has been installed in ceiling and R21 has been installed in
the exterior walls as per the approved COMcheck Energy Code Compliance Report.
- Provide documentation that the windows and insulated door have the correct U value as per the approved
COMcheck Energy Code Compliance Report.
Blower Door Test Failed
Combustion Air Supply for Furnace Failed
Fresh air supply 3' from grade Failed
Duct Insulation - if required in unheated spaces Failed
Door / Window Sealed (No Insulation)Failed
Tub Shower R-20 with Vapor Barrier Failed
Air Barrier behind Knee Walls Failed
All Ductwork Sealed Return and Supply Failed
Duct Blaster Test for duct work, R-8 Failed
Feb 03, 2020 Page (2)
INSPECTION WORKSHEET (BINS-000703-2020)
Checklist Item Status
All Return Air Hard Duct Work Failed
House Wrap Taped at all Seams Failed
Feb 03, 2020 Page (3)
O'Brien, John