Loading...
FM-007355-2019 11122019INSPECTION WORKSHEET (FM-007355-2019) CC-0077-2018Permit Management Case Number:Case Module: 11/12/2019Failed Inspection Date:Inspection Status: Gary StillmanOCC-Inspections Inspector:Inspection Type: 302.7-1-28 Job Address:Parcel Number: 682 Glen St Queensbury, NY 12804 Contact TypeCompany NameName ApplicantPhase Zero Design ArchitectPhase Zero Design ContractorVisible Construction Corp Granted PermissionO'REILLY AUTO ENTERPRISES, LLC Primary OwnerO'REILLY AUTO ENTERPRISES, LLC Checklist ItemPassedComments Sign: NormalTrue Occupancy CycleTrueM Fire MarshalFalse Vincent 11/12/19 Interior FinishesTrue Electrical Wiring Enclosed/LabeledFalse 10/18/19 CLOSE UP ALL ELECTRICAL/LABEL PANELS 11/4/19 LABEL ALL ELECTRICAL PANELS Sign: BackupTrue Emergency Lighting InteriorTrue CO DetectorsTrue 10/18/19 RETURN TO VERIFY PART OF FIRE ALARM-TEST WITH FIRE ALARM Knox Box: installed/checkedTrue 10/18/19 INSTALL KNOX BOX AS DISCUSSED , PROVIDE KEY FOR FRONT DOOR. ALSO NEED KEYS FOR THE FIRE ALARM SYSTEM 11/4/19 RECEIVED KEY FOR FRONT DOOR & FIRE ALARM KEYS Exit AccessTrue Exit DischargeTrue FIRE ALARM AnnualFalse 10/18/19 PROVIDE PLANS OR AS BUILT FOR SYSTEM INSTALLED SPECS FOR ALL DEVICES INSTALLED FIRE MARSHAL TO WITNESS TEST SYSTEM PRIOR TO CO PROVIDE NFPA 72 COMPLETION AND INSPECTION REPORT ZONE CHART 11/4 STILL NEED TO TEST 3 UNITS OF HVAC Exterior StorageFalse Clearance to ElectricalTrue Inspection of ExtinguisherTrue 10/18/19 RETURN TO VERIFY 11/4/19 OK-PASS F.D. SignageFalse February 13, 2020Page 1 of 2 INSPECTION WORKSHEET (FM-007355-2019) Checklist ItemPassedComments Locks and LatchesTrue11/4/19 OK-PASS Clearance to Sprinkler/CeilingTrue Combustibles in Equipment RoomsTrue Exit EnclosureTrue StorageFalse Main Aisle WidthTrue HVAC ShutdownFalse10/18/19 SEE FIRE ALARM Emergency Lighting ExteriorFalse 10/18/19 INSTALL REMOTE HEADS AT EACH ENTRANCE 11/4/19 RELOCATE REMOTE HEADS SIDE AND REAR DOOR Fire Extinguisher HungTrue 10/18/19 HANG FIRE EXTINGUISHERS PER PLAN AS DISCUSSED, PROVIDE SIGNAGE 11/4/19 OK-PASS Secondary Aisle WidthTrue February 13, 2020Page 2 of 2