Loading...
ResCheckREScheck Software Version 4.6.4 Compliance Certificate g a\2 o fh)@ a .e , “)wo Project Foothills Builders i)@i&NS Eneray Code 2015 IEC enhLocation:Glens Falls,New York 4 3 “Construction Type:Single-family -« Project Type New Construction -zsConditionedFloorArea:1,534 ft2 etGlazingArea12%3sClimateZone:6 (7635 HDD)BekPermitDate:oaiaPermitNumberanosw2E>Construction site Owner/Agent Designer/Contractor:aES?John Clendon Dr Daniel W.Ryan PE 8 B20tori?206 Glens Street o3sonQueensbury,NY 12804 Suite 30 aur w Glens Falls,NY 12801 518-792-9264 dryan@dwrpe.comSieCompliance:1.7%Better Than Code Maximum Ua:236 Your UA:232 “Ta beter or Worse Than Coe Indox reflects.How cose to compllance We house is bases on code rade les.GOES Nor prowge an extmate of eneroy use or cos relssve toa mmm code homeEnvelopeAssembliesCeeieseereeeSCCMEITY Celling 1:Flat Celling or Scissor Truss 1534 38.0 0.0 0.030 46 Wall 1:Wood Frame,16"o.«1424-210 00 ©0057 71 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 107 0.290 31 Door 1:Solid 18 01403 Door 2:Glass 40 0.290 12 Door 3:Solid 20 02005 Basement Wall 1:Solid Concrete or Masonry 1,498 00=19.0 0.03856 Wall height:7.8 Depth below grade:7.0° Insulation depth:7.8 Window 2:Vinyl/Fiberalass Frame:Double Pane 7 04003 Window 3:VinyliFiberglass Frame:Double Pane with Low-E 16 0.290 Floor 1:All Wood Joist/Truss:Over Outside 10 300 00 ©0033 0 Project Title:Foothills Builders Report date:02/05/20 Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Page 1 of10 Clendon\1536 Rescheck.rck Compliance Statement:The proposed bullding design described here is consistent with the building plans,specifications,and other Calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IEC requirements in REScheck Version 4.6.4 and to comply with the mandatory requirements REScheck Inspection Checklist Daniel W Ryan P.E.Ady 215/20 DateName-Titte Signature UD ENGINEERS STAMP: Report date:02/05/20ProjectTitle:Foothills Builders Page 2 of 10Datafilename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Clendon\1536 Rescheck.rck REScheck Software Version 4.6.4 [%Inspection Checklist Energy Code:2015 IECC Requirements:0.0%were addressed directly in the REScheck software Text in the "Comments/Assumptions"column is provided by the user in the REScheck Requirements screen.For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided. Section Plans Verified|Field Verified Comments/Assumptions energy code compliance for the building envelope,Thermal envelope represented on construction documents. Pre-Inspection/Plan Review|Plans Ver ved ‘Complies? Construction drawings and Ccomplies documentation demonstrate Coes Not [Not ObservableNotApplicable 103.1,Construction drawings and complies: 103.2 documentation demonstrate Oboes Not 1403.7 energy code compliance for | [(PR3}’lighting and mechanical systems.CiNot Observable e Systems serving multiple Oct Applicable dwelling units must demonstrate ‘compliance with the IECC Commercial Provisions,| Manual J or other methods Ree BRU JHeating and cooling equipment is Heating:Heating:‘Cicomplies sized per ACCA Manual S based Btu.Btu.Oboes not fon loads calculated per ACCA |Cooting eee rianBNotapplicable Additional Comments/Assumptions: (ili Project Title:Foothills Builders inimpact (ier 1) Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Clendon\1536 Rescheck.rck [Bea pack ier [Stow impact er 3)] Report date:02/05/20 Page 3 of 10 Section Foundation Inspection Plans Verified Fleld Verified|Complies?Comments/Assumptions Dot Applicable Value Value [402.1.1 Conditioned basement wall R-R Cicomplies ‘See the Envelope Assemblies {FOa}*insulation Revalue.Where interior re Epes Net tebe forvaties insulation is used,verification =e may need to occur during Not Observable Insulation inspection.Not EiNot Applicable required in warm-humnid locations inlimate Zone 3 3032 Conditioned basement wall Ccomplies FOS insulation installes per Ciboes Not iQ Manufacturer's instructions he obsatanie Cinot Applicable 1402.2.9 Conditioned basement wall ft ft complies ‘See the Envelope Assemblies: {FOG}inaulation depth of burial or Tloes Not table for values ©jcisance from top of wal CiNot Observable ‘A protective covering is installed to protect exposed exterior insulation and extends @ minimum of 6 in.below grade. CicompliesCoesNot DiNot ObservableOotApplicable ‘Snow-and ice-melting system controls installed, Additional Comments/Assumptions: complies:Oboes Not [Not ObservableNotApplicable (W]Righimpact (Tier)[El] Medium impact (Tier2) [/Bi[Low impact (Tier 3) Project Title:Foothills Builders Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Clendon\1536 Rescheck.rck Report date:02/05/20 Page 4 of 10 Section |Plans Verified|Field verified :#_|Framing /Rough-In inspection !@"s Ver!ved Complies?|Comments/Assumptions &Reg.tD f402.1.1,Door Ufactor.wu [Complies See the Envelope Assemblies 02.3.4 Clboce not table forvatueson{Not Observablee__Bnot Applicable }402.1.1,Glazing U-factor (area-weighted —_U:complies ‘See the Envelope Assemblies. 2023.1,average),Coes Not table for vats. forse Not Observable 4025 |Not Applicable tFRaP @ 303.1,3 U-factors of fenestration products Complies FRAY?are determined in accordance Coes Not@___ththe NFRC test procedure or iNet Observabletakenfromthedefaulttable.ANGE asreseia Ja02.4.1.1 ier mal barrier ‘complies [FR23}!"installed per manufacturer's |Ddoes Notepees|DNot Observable CONot Applicable [402.4.3 Fenestration that is not site built complies IFR20}"is listed and labeled as meeting 'Diboes Not ‘AMA WDMAICSA 101/1.5.2/A440eorhasinfitrationratesperNERC BINot Observable 400 that do not exceed code |INot Applicable limits. Cicomplies sealed at housing/interior finish Oboes Not and labeled to indicate $2.0 cfm leakage at 75 Pa [[Not ObservableOotApplicable }403.2.1 Supply and return ducts in attics -oe complies:[FRI2}'insulated >=R-8 where duct is Oboes Not 3='Sinches in ciameter and >—©Fee where =3inches.Supply and CiNot Observable return ducts in other portions of |=Not Applicable the bulding insulated>=R-6for |SSdiameter>=3inchesandR-4.2 for <3 inches in diameter.57Buildingcavitiesarenotusedas,:‘Cicomplies ducts or plenums,Oboes NotaeeeiNetobservableBinetApplicable HVAC piping conveying fuids Cicompies above 105 "For chilled fluids Cidoes Not below 55 Fare insulated to =R-recenotApplicable [403.4.1 Protection of insulation on HVAC Cicomplies (FR24}"piping, : Cidoes Not ®| :—Not observable later pipes are insulated to Oboes Not [Not ObservableDotApplicable ‘Automatic or gravity dampers are ‘complies installed an all outdoor air Ciboes NotIntakesandexhausts.Got observableNotApplicable (i [Fish impact (Tier 1)[Bl] Mediums impact (ier2) [I]low impact triers)|Project Title:Foothills Builders Report date:02/05/20 Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John.Page 5 of 10 Clendon\1536 Rescheck.rck jonal Comments/Assumptions: [E]Hioh impact (ier 3).Pal[ediumimpacttera)[Bl[Low impact mera) —_] Project Title:Foothills Bullders -Report date:02/05/20 Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Page 6 of 10 Clendon\1536 Rescheck.rck Section 5;Insulation inspection|Plans Verified|Field verified Comments/Assumptions5Reg.tD. Al installed insulation is labeled Cicomplies or the installed R-values Coes Notaes(Not ObservableWotApplicable __1402.1.1,Floor insulation R-value.R complies See the peavelone!‘Assemblies: s02.26 (Wood Coes Not fable forvates. CNL)CDSteet(Not Observable@Dotapplicable 303.2,Floor insulation installed per Oicomplies 4022'7 manufacturers instructions and Coes Not NZ)"in substantial contact with the arakeevabe(Deri ofthe sbtoor or oor [net observa framing cavity insulation is in INot Applicable contact withthe top side of sheathing,or continuous insulation is installed on theUndersideoffloorframingand extends from the bottom to the |top of all perimeter floor framing L ‘members.=[402.1.1,Wall insulation R-value.fthisisa R iComplies See the Envelope Assemblies J102.2'5,mass wall with at least %ofthe |]Wood (Wood Cldoes Not fable for vats. 1402.2.6 wall insulation on the wall 1 mass Ei Mess einer observableNs}exterior,the exterior insulation reel fot e requirement applies (R10).Stee!Ci Steel Oot Applicable [303.2 Wall insulation is installed per |Ocomplies Nai!manufacturer's instructions.Cboes Not =“LNot Observable Biot Applicable Additional Comments/Assumptions: [|Fish impact (Tieri)[|Medium impact (ier 2)[SI |Low impact(Tier3) —_] Project Title:Foothills Builders Report date:02/05/20 Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Page 7 of10 Clendon\1536 Rescheck.rck 300 ft Seetion F°|inal inspection Provisions|Plans Verified|Field Verified|Complies?|comments/Assumptions &Regi)fe [402.1.1,Ceiling insulation R-value.R Cicomplies ‘See the Envelope Assemblies 1402.2.1,J Wood (Wood does Not table for values. nee C1 Steel Oi Steet [Not Observable Fay Oonot Applicable 303.1.1.1,Ceiling insulation installed per complies 032°”manufacturer's Instructions Clboes No {Fz}?Blown insulation marked every [Not ObservableDotApplicable design air flow.‘ Vented attics with air permeable complies insulation include baffle adjacent Oboes Not jxiends ver culation.iNet observable Wot Applicable '402.2.4 Attic access hatch and door Re (complies [F13"insulation =R-value of the Oboes Not adjacent assembly.Se cencenotApplicable [402.4.1.2 Blower door test @ 50 Pa.~~Bcomplies (F172 ach in Climate Zones 1-2,and Oboes Not ‘ach in Climate Zones 3-8 one=Not Applicable _(403.2.3 Duct tightness test result of ‘tmn/100 em/io0 Cicomplies [Fia}*”—cfm/100 ft2 across the system or 7 ©Cdoes Not cfra/100 2 without Ceehandler@25Pa.For rough-n iBtests,verification may need to INot Applicable ‘occur during Framing Inspe :i'403,3.2 Ducts are pressure tested to cimvi0o cfm/io0—Cicemplies [FI271'determine air leakage with ®©Cdoes Not either:Rough-in test:Total er ooeaeeieleakagemeasuredwithaNeeeepressuredifferentialof0.1 inch INot Applicable wg.across the system including the manufacturer's air handler enclosureifinstalledattimeof test,Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air handler enclosure..-=[403,3.2.1 Air handler leakage designated i oomplies [rizay’by manufacturer at =a EO 00es Not Not Observable Programmable thermostats installed for control of primary |Does not eating and cooling systems and |eerilysetbymanufacturertoco‘code specifications.INot Ay iHeatpumpthermostatinstalled||‘Ccomp ‘on heat pumps,Coes ot |ook CINot Observable |:DlNot applicable Circulating service hot water |(‘Ccompties systems have automatic or Coes Not accessible manual controls.[Not Observable _CNot Applicable (i [igh impact (Tier 1)[BB]Medium impact (Tier 2)[Sl]Low impact (Ter3)_] Project Title:Foothills Builders Data filenam Clendon\1536 Rescheck.rck \Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Report date:02/05/20 Page 8 of 10 ?Plans Verified|Field Verified|Compties?|Comments/Assumptionsbes| 1403.6.1 All mechanical ventilation system complies.FI25 fans not part of tested and listed Oboes NoteoDietonsenNotApplicable 403.2 Hot water boilers supplying heat Cicomplies [FI26P through one-or two-pipe heating Cboes Not systems have outdoor setback control to lower boiler water IEINot Observable temperature based on outdoor DNot Applicable temperature. 403,51,Heated water circulation systems ‘complies fFI28)©have a circulation pump.The Oboes Not system return pipe is 2 dedicated Generetumpipeoracoldwatersupply pipe.Gravity and thermos-Not Applicable syphon circulation systems are ‘not present.Controls for circulating hot water system pumps start the pump with signal for hot water demand within the ‘occupancy.Controls ;‘automatically turn off the pump when water is in circulation loop is at set-point temperature and __no demandforhotwaterexists. !403.5.1,2 Electric heat trace systems compliesrao}|comply with EEE 515.2 of UL Does Not 515.Controls automatically ‘adjust the energy input to the telNer Obscene heat tracing to maintain the Oot Applicable desired water temperature in the piping, |4035.2 Water distribution systems that Ticomplies FIB0}?©have recirculation pumps that ©Oboes Not pump water from a heated waterSupplypipebacktotheheated,[Not Observable water source through a cold OWNot Applicable water supply pipe have @ aesdemandrecirculationwater system.Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 108%.[403.54 Drain water heat recovery units :Cicomplies IFIBIF!tested in accordance with CSA Oboes Not 855.1.Potable water-side pressure loss of drain water heat |CINot Observable Fecovery units <3 psi for ot Applicable individual units connected to one or two showers.Potable water.aesidepressurelossofdrainwater heat recovery units <2 psi for individual units connected to three or more showers. 75%of lamps in permanent (CIComplies FIG}fixtures or 75%of permanent Ciboes Not frtures have righ efcacy lamps.het Observableaesnotapplytolowveltageo lighting _not applicable —_)404.1.1 Fuel gas lighting systems have complies |fFI23}®—no-continuous pilot light.Tboes Not [Not ObservableNotApplicable [i]fiah impact (Tier1) [Bl] Medium impact (vier 2)[SI|cow impact(Tier3) _] :Foothills Builders Report date:02/05/20 Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John Page 9 of 10 Clendon\1536 Rescheck.rck rarJ"|Final inspection Provisions|Pngverified|Field Verited|Compiies?|Comments/Assumptionsneq‘Compliance certificate posted.compliesOboesNot (DNot Observable :- Qhiot Applicable _Manufacturer manuals for Cicomplies ‘mechanical and water heating Cidoes Not a .aa Deve cen orcad -CiNot Observable: ional Comments/Assumptions:[i]Righimpact (ier 1) [i] Medumimpactera) Not Applicable as Project Title:Foothills Builders Data filename:E:\Dropbox\DWRPE Engineering\Active Projects\1536 -DES -FHB Lot 12 John. Clendon\1536 Rescheck.rck Report date:02/05/20 Page 10 of 10 N 2015 IECC Energy Efficiency Certificate inca‘Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 30.00 Ceiling /Roof 38.00 Ductwork (unconditioned spaces):Cero erWindow0.29 Door 0.29 Pee oa Eee Heating System: Cooling System: Water Heater Name:Date: Comments.