Loading...
Area Variance Application - Dineen - 17 Feb 2020Area Variance [ZBA approved: September 21 2016] General Information Tax Parcel ID Number: ____________________ Zoning District: ____________________ Detailed Description of Project [include current & proposed use]: Current Use: _________________________________________________________________ Proposed Use: ____________________________________________________________ Location of Project: _______________________________________________________________ Applicant Name: Mailing Address Home Phone City, State, Zip Work Phone Cell Phone E-Mail: FAX No. Agent’s Name: Mailing Address Home Phone City, State, Zip Work Phone Cell Phone E-mail FAX No. Owner’s Name Mailing Address Home Phone City, State, Zip Work Phone Cell Phone E-mail FAX No. Page 1 Area Variance [ZBA approved: September 21 2016] Site Development Data Area / Type Existing sq. ft. Proposed Addition sq. ft. Total sq. ft. A. Building footprint B. Detached Garage C. Accessory Structure(s) D. Paved, gravel or other hard surfaced area E. Porches / Decks F. Other G. Total Non-Permeable [Add A-F] H. Parcel Area [43,560 sq. ft. / acre] I. Percentage of Impermeable Area of Site [I=G/H] Setback Requirements Area Required Existing Proposed Front Yard [1] Front Yard [2] Shoreline Side Yard [1] Side Yard [2] Rear Yard [1] Rear Yard [2] Travel Corridor Height [maximum] Permeability Number of parking spaces Page 2 Area Variance [ZBA approved: September 21 2016] Additional Project Information 1. Will the proposal require a Septic Variance from the Town Board of Health? _______________ 2. If the parcel has previous approvals, list application number(s): _________________________ 3. Does this project require coverage under the New York State Pollutant Discharge Elimination System (SPDES) Permit Program? __ Yes / __ No 4. Estimated project duration: Start Date: __________ End Date: __________ 5. Estimated total cost of project: _______________ 6. Total area of land disturbance for project: _______________ Floor Area Ratio Worksheet FLOOR AREA RATIO (FAR) -- The relationship of building size to lot size, derived by dividing the total building floor area by the lot size in square feet, yielding a percentage. Zoning District Symbol Floor Area Ratio [FAR] Waterfront Residential WR 0.22 Commercial Moderate / Commercial Intensive CM / CI 0.3 A. The combined area of all square footage, as measure from exterior walls of all structures on the property, including all floors of the structures, garages, basements and attics with more than five (5) feet of ceiling height and covered porches. Building square footage does not include: Open deck, docks and that portion of covered docks extending over water and one storage shed of one hundred twenty (120) square feet or less. Any additional sheds will be included. (See “FLOOR AREA RATIO”). B. Commercial or industrial: the total area in square feet as measured from the exterior of the outside walls of a building or structure, and when applicable, the sum total of all floor areas of the principal and accessory buildings or structures on the project site. Parcel Area ___________________________ sq. ft. Existing Floor Area ___________________________ sq. ft. [see above definition] Proposed Additional Floor Area ___________________________ sq. ft. Proposed Total Floor Area ___________________________ sq. ft. Total Allowable Floor Area ___________________________ (Area x _____) [see above table] Page 3 Area Variance [ZBA approved: September 21 2016] Compliance with Zoning Ordinance Requesting relief from SECTION: ________________________________ Need relief from the requirement(s) listed below which can not be met by the project as proposed. [Check all that apply]  Setback  Buffer Zone  Lot Width  Other ______________________ The following questions reflect the criteria for granting this type of variance. Please complete them; use additional sheets if needed. 1. Whether an undesirable change will be produced in the character of the neighborhood or a detriment to nearby property will be created by the granting of this area variance? ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 2. Whether the benefit sought by the applicant can be achieved by some method, feasible for the applicant to pursue, other than an area variance? ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 3. Whether the requested area variance is substantial? ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 4. Whether the proposed variance will have an adverse effect or impact on the physical or environmental conditions in the neighborhood or district? ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ 5. Whether the alleged difficulty was self-created? ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Page 4 Area Variance [ZBA approved: September 21 2016] Section 179-14-030 –Application materials Application materials and site plan drawing is to include sufficient information for the Board to review and provide a decision. The applicant is to provide a site plan drawing(s) – a survey showing existing conditions, a proposed conditions map (see page 00 for specific criteria) and include any other attachments that address A - D as applicable to the proposed project. A. General Shown on Sheet # 1 Title, Name, Address of applicant & person responsible for preparation of drawing 2 Deed 3 North arrow, Tax Map ID, date prepared and scale [minimum: 1 inch = 40 feet ] 4 Boundaries of the property plotted to scale, zoning boundary 5 Principal structures, accessory structures with exterior dimensions 6 Site improvements incl. outdoor storage areas, driveways, parking areas, etc.: existing & proposed 7 Setbacks for all structures and improvements: existing & proposed 8 Elevations and floor plans of all proposed and affected structures B. Water & Sewer Shown on Sheet # 1 Project sewage disposal facilities, design details, construction details, flow rates, and number of bedrooms proposed 2 Water supply [i.e. well] & septic on adjoining lots with separation distances to existing or proposed on-site water supply and septic 3 Separation distances for proposed sewage disposal system to well and water bodies 4 Existing public or private water supply [well, lake, etc.]. Method of securing public or private water, location, design and construction of water supply including daily water usage 5 Percolation test location and results C. Parking / Permeable Areas Shown on Sheet # 1 Number of spaces required for project including calculations and justification: existing & proposed 2 No. of existing parking spaces, number to be removed, number to maintain and type of surfacing material [e.g., gravel, paved] 3 Provision for pedestrian and handicap access and parking: existing & proposed 4 Design details of ingress, egress, loading areas and cutting: existing & proposed 5 Location and character of green areas [existing and proposed], modification to green area, buffer zone to remain undisturbed 6 Lighting, location and design of all existing and proposed outdoor lighting D. Additional Site Development and Miscellaneous Shown on Sheet # 1 On-site & adjacent watercourses, streams, rivers, lake and wetlands 2 Utility / energy distribution system [gas, electric, solar, telephone]: existing & proposed 3 Location, design and construction details of all existing and proposed site improvements including: drains, culverts, retaining walls, fences, fire & emergency zones and hydrants, etc. 4 Square footage of bldg. area proposed for office, manufacturing, retail sales or other commercial activities: existing & proposed 5 Signage: Location, size, type, design and setback: existing & proposed 6 Waiver Request: provide letter with application requesting any waivers: please reference specific items 7 Commercial / Industrial Development requires submission of Landscaping, Stormwater Management, Grading & Lighting Plans 8 Identification of Federal, State or County permits required for the project together with a record of application for all necessary permits Page 5 Area Variance [ZBA approved: September 21 2016] Pre-Submission Conference Form / Section 179-9-040 1. Applicant Name: __________________________________________________ 2. Tax Map ID ________________ Location: _______________________ 3. Zoning Classification __________ 4. Reason for Review: __________________________________________________________ 5. Zoning Section #: ________________________ 6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by Deed ____ _____________ General Information complete ____ _____________ Site Development Data Complete ____ _____________ Setback Requirements Complete ____ _____________ Additional Project Information Complete ____ _____________ FAR addressed ____ _____________ Compliance with Zoning Ordinance ____ _____________ Checklist items addressed ____ _____________ Environmental Form completed ____ _____________ Signature Page completed ____ _____________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ Staff Representative: ________________________________ Applicant / Agent: ________________________________ Date: ___________ Page 6 Page 1 of 3 Short Environmental Assessment Form Part 1 - Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 – Project and Sponsor Information Name of Action or Project: Project Location (describe, and attach a location map): Brief Description of Proposed Action: Name of Applicant or Sponsor: Telephone: E-Mail: Address: City/PO: State: Zip Code: 1.Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2.Does the proposed action require a permit, approval or funding from any other government Agency? If Yes, list agency(s) name and permit or approval:NO YES 3.a. Total acreage of the site of the proposed action? __________ acres b. Total acreage to be physically disturbed? __________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? __________ acres 4.Check all land uses that occur on, are adjoining or near the proposed action: 5.Urban Rural (non-agriculture) Industrial Commercial Residential (suburban) Aquatic Other(Specify):□Forest Agriculture □Parkland Page 2 of 3 5.Is the proposed action, a.A permitted use under the zoning regulations? b.Consistent with the adopted comprehensive plan? NO YES N/A 6.Is the proposed action consistent with the predominant character of the existing built or natural landscape?NO YES 7.Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify: ________________________________________________________________________________ NO YES 8.a. Will the proposed action result in a substantial increase in traffic above present levels? b.Are public transportation services available at or near the site of the proposed action? c.Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? NO YES 9.Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 10.Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable water: _________________________________________ _____________________________________________________________________________________________ NO YES 11.Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ______________________________________ _____________________________________________________________________________________________ NO YES 12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? NO YES 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? b.Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Page 3 of 3 14.Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: □Shoreline □ Forest Agricultural/grasslands Early mid-successional Wetland □ Urban Suburban 15.Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered?NO YES 16.Is the project site located in the 100-year flood plan?NO YES 17.Will the proposed action create storm water discharge, either from point or non-point sources? If Yes, a.Will storm water discharges flow to adjacent properties? b.Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? If Yes, briefly describe: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 18.Does the proposed action include construction or other activities that would result in the impoundment of water or other liquids (e.g., retention pond, waste lagoon, dam)? If Yes, explain the purpose and size of the impoundment:______________________________________________ ____________________________________________________________________________________________ _ NO YES 19.Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste management facility? If Yes, describe: _______________________________________________________________________________ _____________________________________________________________________________________________ NO YES 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or completed) for hazardous waste? If Yes, describe: _______________________________________________________________________________ _____________________________________________________________________________________________ NO YES I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Date: _____________________ Applicant/sponsor/name: ____________________________________________________ __________________________ Signature: _____________________________________________________Title:__________________________________ EAF Mapper Summary Report Friday, February 07, 2020 2:37 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form (EAF). Not all questions asked in the EAF are answered by the EAF Mapper. Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC, you may also need to contact local or other data sources in order to obtain data not provided by the Mapper. Digital data is not a substitute for agency determinations. Part 1 / Question 7 [Critical Environmental Area] Yes Part 1 / Question 7 [Critical Environmental Area - Identify] Name:Round Pond, Name:Glen Lake, Reason:Unique, glacial kettle pond, Reason:Benefit to human health, natural setting, Agency:Queensbury, Town of, Date:12-05-86, Date:11-30-89 Part 1 / Question 12a [National or State Register of Historic Places or State Eligible Sites] No Part 1 / Question 12b [Archeological Sites]Yes Part 1 / Question 13a [Wetlands or Other Regulated Waterbodies] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. Part 1 / Question 15 [Threatened or Endangered Animal] Yes Part 1 / Question 15 [Threatened or Endangered Animal - Name] Frosted Elfin, Karner Blue Part 1 / Question 16 [100 Year Flood Plain]Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Part 1 / Question 20 [Remediation Site]No 1Short Environmental Assessment Form - EAF Mapper Summary Report Page 1 of 2 Agency Use Only [If applicable] Project: Date: Short Environmental Assessment Form Part 2 - Impact Assessment Part 2 is to be completed by the Lead Agency. Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept “Have my responses been reasonable considering the scale and context of the proposed action?” No, or small impact may occur Moderate to large impact may occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2.Will the proposed action result in a change in the use or intensity of use of land? 3.Will the proposed action impair the character or quality of the existing community? 4.Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area (CEA)? 5.Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit, biking or walkway? 6.Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? 7.Will the proposed action impact existing: a. public / private water supplies? b. public / private wastewater treatment utilities? 8.Will the proposed action impair the character or quality of important historic, archaeological, architectural or aesthetic resources? 9.Will the proposed action result in an adverse change to natural resources (e.g., wetlands, waterbodies, groundwater, air quality, flora and fauna)? 10.Will the proposed action result in an increase in the potential for erosion, flooding or drainage problems? 11.Will the proposed action create a hazard to environmental resources or human health? Page 2 of 2 For every question in Part 2 that was answered “moderate to large impact may occur”, or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, long-term and cumulative impacts. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. _________________________________________________ _______________________________________________ Name of Lead Agency Date _________________________________________________ _______________________________________________ Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer _________________________________________________ _______________________________________________ Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer) Short Environmental Assessment Form Part 3 Determination of Significance Agency Use Only [If applicable] Project: Date: