Loading...
ResCheck t 4.6.4 ffl;h'L VJ D Compliance Certificate E C E 0 V E Project Cerrone Builders Inc OCT U 4 �J11 Energy Code: 2015 IECC TOWN OF QUEENSBURY Location: Glens Falls, New York BUILDING&CODES Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 1,755 ft2 296.14-2-22 RC-000626-2017 Glazing Area 13% Cerrone Builders Inc. Climate Zone: 6 (7635 HDD) 42 Devin Court Lot 22 Permit Date: � Permit Number: SFD W/FP 1755 s.f., Garage 458 s.f. Construction Site: Owner/Agent: Designer/Contractor: 42 Devin Court VISION Engineering, LLC Lot 22 206 Glen Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 8 3 i t i Compliance: 0.4%Better Than Code Maximum UA: 281 Your UA: 280 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Perimeter Ceiling 1: Raised or Energy Truss 1,755 38.0 0.0 0.025 44 Floor 1:All-Wood joist/Truss:Over Outside Air 12 30.0 0.0 0.033 0 Wall 1: Wood Frame, 16" o.c. 1,809 21.0 0.0 0.057 89 Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 194 0.290 56 Door 1: Solid 18 0.140 3 Door 2: Solid 20 0.200 4 Door 3: Glass 18 0.240 4 Basement Wall 1: Solid Concrete or Masonry 1,568 0.0 15.0 0.046 71 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2: Vinyl/Fiberglass Frame:Double Pane 9 0.400 4 Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 1 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck i Compliance Statement: The proposed building design described here is consistent with the building pl ,specifications, and other calculations submitted with the pe it application.The proposed bui ' g has been designed to the 2015 IECC requirements in REScheck V rsi 4. .4 and to mply with the mandatory require e s listed in the RES Inspection CheckliW. 7z %W1/12 Name-Title ure Ute Lu I O o 7 ROl`FCC'.�J Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 2 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck cRE c eck Software Version 4.6.4 l�(J Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen, For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. a ' ; Plans Veri ,E➢efd V I ruffled PlansVerified Foundation inspection ieValueComplies? Comments/Assumptions l eq.I 402.1.1 Conditioned basement wall R- R- ❑Complies ;.See the Envelope Assemblies [F04]1 insulation R-value.Where interior R- R ❑Does Not ;table for values. insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [F05]1 Insulation installed per ` `f, ❑Does Not manufacturer's instructions. �, ❑Not Observable ; 2 ,, ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ;❑Complies ;See the Envelope Assemblies [F06]1 Jnsulation depth of burial or ❑Does Not ;table for values. distance from top of wall. ❑Not Observable ❑Not Applicable A protective covering is installedf,, , []Complies to protect exposed exterior -]Does Not i insulation and extends a ''- minimum of 6 in. below grade. -]Not Observable ❑Not Applicable Snow-and ice-melting system °❑Complies controls installed. ❑Does Not m i� j y ❑Not Observable . ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) A Medium Impact(Tier 2) `;Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 4 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck Section pians Verifieield Verified # Framd F ing/Rough»in inspection Value Value Complies? Commen"Assumptions &iteq.ID 402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR111 ❑Not Observable ` ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 ❑Not Applicable [FR2]1 303.1.3 U-factors of fenestration products " ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable taken from the default table. ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier "" ❑Complies [FR23]1 installed per manufacturer's El Does Not instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/l.S.2/A440 or has infiltration rates per NFRC a ❑Not Observable 400 that do not exceed code ❑Not Applicable limits. �. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish " ❑Does Not and labeled to indicate <_2.0 cfm ❑Not Observable leakage at 75 Pa. y ryy &a El Not App licable 403.2.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated >= R-8 where duct is '6�"", ❑Does Not >= 3 inches in diameter and >_Ike ❑Not Observable R-6 where < 3 inches.Supply and return ducts in other portions of []Not Applicable the building insulated >= R-6 for F: diameter>= 3 inches and R-4.2 , for< 3 inches in diameter. `• 403.3.3.5 i Building cavities are not used as [__[Complies [FR15]3 ducts or plenums. ❑Does Not +' ❑Not Observable ❑Not Applicable 403:4 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105°F or chilled fluids ❑Does Not below 55°F are insulated to >_R- ❑Not Observable 3. ❑Not Applicable 403.4.1 Protection of insulation on HVAC A ❑Complies [FR24]1 piping. a ❑Does Not ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR1812 ?R-3. ❑Does Not _; ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR1912 installed on all outdoor air ❑Does Not intakes and exhausts. g ❑Not Observable ❑Not Applicable 1 ,High Impact(Tier 1) ,; Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 5 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck Additional Comments/Assumptions: E 11 High Impact(Tier 1) Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 6 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck F Section # fr►sulatl In inns Verified Field Verified a & Req.lD Value Value Complies? C6mment; s 3113,1 All installed insulation is labeled �s = ❑Complies t[N13]2 or the installed R-values � ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per '"❑Complies 402.2.7 manufacturer's instructions and []Does Not [IN2]1 in substantial contact with the underside of the subfloor, or floor ❑Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side ofy sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/1 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior, the exterior insulation requirement applies(FR10). E] Steel ❑ Steel ❑Not Applicable __..... ___ .................... 303.2 Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1!High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 7 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck €tlen Plans Verifiedi eld Verified# Finai Inspection Provisions Value' Value ccmp�lles rrr ersts/Assu patio s & Re .11} 402.1.1, :Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ❑Not Observable 402.2.6 ❑ [FI1]1 Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. El Does Not [F12]1 Blown insulation marked every fr 300 ftp. ❑Not Observable ?❑Not Applicable 402'2 1= 'Vented attics with air permeable ;fin❑Complies *21 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. a ❑Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R ❑Complies [F1311 insulation >_R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F11711 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable _.._ .................................____.;:__.._..___._.___..____ 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [F1411 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air ❑Not Observable handler @ 25 Pa. For rough-in :tests,verification may need to ❑Not Applicable 4 occur during Framing Inspection. ._......._.._....._..._.___.__._._ 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 '❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not i either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g, across the system including ,the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g, across the entire system :including the manufacturer's air handler enclosure. 403.3.2.1 ;Air handler leakage designated ❑Complies [F12411 by manufacturer at <=2%of ❑Does Not design air flow. ❑Not Observable ❑Not Applicable 403.1.1 Programmable thermostats 'E❑Complies [F1912 installed for control of primary aEl Does Not heating and cooling systems and initially set by manufacturer to :__: ❑Not Observable ; code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed �` a❑Complies t [F]10]2 on heat pumps. Q ti, ❑Does Not } 1;❑Not Observable ❑Not Applicable 403,5.1Circulating service hot water �y �6 ,a❑Complies [FI 1112 systems have automatic or ❑Does Not accessible manual controls. a i a� y' ❑Not Observable -' 31 ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 8 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck T h Plans Verified field Verified i In ,JnsPi 5, i'on Provisions Complies? Ct�m en#s/A i " Value Value Co :All mechanical ventilation system " r d ❑Complies l=i fans not part of tested and listed []Does Not HVAC equipment meet efficacy a,,x and air flow limits. [:]NotObservable []Not Applicable Hot water boilers supplying heat ,S ❑Complies � through one-or two-pipe heating ❑Does Not ,011 systems have outdoor setback ❑Not Observable control to lower boiler water temperature based on outdoor ❑Not Applicable Rtemperature. Heated water circulation systems ❑Complies have a circulation pump.The e y � s „❑Does Not system return pipe is a dedicated t p ; return pipe or a cold water supply [:]Not Observable U1111-_', N" pipe. Gravity and thermos ❑Not Applicable �� syphon circulation systems are2 d, y not present.Controls for =circulating hot water system _ pumps start the pump with signal `" s for hot water demand within the :_occupancy. Controls Fa automatically turnoff the pump d{f when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 :Electric heat trace systems ❑Complies 12912 comply with IEEE 515.1 or UL ❑Does Not 515.Controls automatically adjust the energy input to the ❑Not Observable t heat tracing to maintain the "❑Not Applicable desired water temperature in the , piping. ' 403.5.2 Water distribution systems that ?[]Complies -[f130)z have recirculation pumps that °~ []Does Not pump water from a heated water E.3 .. supply pipe back to the heated []Not Observable _water source through a cold �c����a ❑Not Applicable ; water supply pipe have a demand recirculation water • NNI system. Pumps have controls gid, l that manage operation of the pump and limit the temperature ' l of the water entering the, cold water piping to 1044F. i 4, ,,Drain water heat recovery units ❑Complies j tested in accordance with CSA ❑Does Not 655.1. Potable water-side pressure loss of drain water heat []Not Observable £ recovery units < 3 psi for ❑Not Applicable ; ✓� individual units connected to one 'F fi or two showers. Potable water- side pressure loss of drain water heat recovery units< 2 psi for ; individual units connected to K F Y "three or more showers. f 404.1 75%of lamps in permanent ❑Complies [F16)1 fixtures or 75%of permanent , % ❑Does Not ,fixtures have high efficacy lamps. Does not apply to low-voltage ❑Not Observable li htin �, " ❑Not Applicable 9 g• 404.1.1 Fuel gas lighting systems have ❑Complies ; [17123)3 no continuous pilot light. , ❑Does Not []Not Observable r []Not Applicable 1 High Impact(Tier 1) Medium Impact(Tier 2) Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 9 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck motion Flans Verified Field Verified; Final Inspection F�ravlsions value ValueC+ lies? Comments/Assurnptlons & Req.il 401'3 ;Compliance certificate posted. Elco mplies iF17l ❑Does Not yT ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FU13 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 ;High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/28/17 Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 10 of 10 42 Devin Crt Lot 22\1284 RESCHECK.rck 2015 IECC Energy Efficiency Certificate Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.20 Heating System• Cooling System: Water Heater: I'M NOW M1111011 Name: Date: Comments