Loading...
ResCeck REScheck Software Version 4.6.2 V CNJ Compliance Certificate MAY � 5 � TT RK N,., Iaw � I � , ( � �l Project CerrDne Builders IncWw � Energy Code: 2010. New York Energy Conservation � 9r Location: Warren County, New York a '� Construction Type: Single-family Project Type: New Construction ; Conditioned Floor Area: 1,,245 ft2 <�� �rIV71, Glazing Area 13% ✓y3 w C)rr, Climate Zone: 6 (7635 HDD) Permit Date: ti 7� r Permit Number: Construction Site: Owner/Agent: Designer/Contractor: West Mtn Phase 2 Lot 10 VISION Engineering, LLC Queensbury, NY 12804 206 Glen Street Ste 56 Glens Falls, NY 12801 Compliance: 0.0%Better Than Code Maximum UA: 221 Yamw Uk 221 The%Better or worse Than Code Index refuects how close to compliance the house is based on code trade-oft rules. It DOES NOT provide an estimate or energy use or dost relative to a mora muri horne. Envelope Assemlbhe Ceiling 1: Flat Ceiling or Scissor Truss 1,2.48 38.0 0.0 0,030 37 Wall 1: Wood Frame, 16" o.c. 1,332 21.0 0.0 0,057 64 Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 126 0,320 40 Door 1: Solid 18 0.140 3 Door 2: Solid 20 0.200 4 Door 3: Glass 40 0.320 13 Basement Wall 1: Solid Concrete or Masonry 1,155 0.0 13.0 0,050 57 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 7 0.400 3 Compliance Statement. The proposedbuilding design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed bu'ding has been designed to meet the 2010 New York Energy Conservatio ,Construction Code requirements in REScheck Versio 4 6.2 and to comply with the mandatory requ rer ks Il ted in the RE the spection C ecklist. "11, Name- 0e v signature Date Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:1Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 1 of 7 Project Title: Cerrone Builders Inc Report date: 05103/16 Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 2 of 7 REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2010 New York Energy Conservation Construction Code Requirements: 0.0% were addressed directly in the REScheck software Text in the"Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions &Re .ID 103.2 Construction drawings and ❑Complies [PR1)1 documentation sufficiently ❑Does Not demonstrates energy code compliance for the building ❑Not Observable envelope. ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation sufficiently ❑Does Not [PR311 demonstrates energy code ;4 compliance for lighting and ❑Not Observable mechanical systems.Systems ❑Not Applicable serving multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ElComplies [1311212 sized per ACCA Manual S based Btu/hr Btu/hr []Does Not A on loads per ACCA Manual J or Cooling: Cooling: other approved methods. Btu/hr Btu/hr ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 3 of 7 Section # Foundation Inspection Complies? Comments/Assumptions & Req.ID 303.2.1 Exposed foundation insulation ❑Complies [FOS1]2 protection. []Does Not ❑Not Observable ❑Not Applicable 403.8 Snow melt controls. ❑Complies [F01212 ❑Does Not U' ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 4 of 7 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Re .ID 402.4.4 Fenestration that is not site built DComplies [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/l.S.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code []Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures DComplies [FR16]2 sealed at housing/interior finish ❑Does Not 14 and labeled to indicate&It;=2.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.2.2 All joints and seams of air ducts, DComplies [FR13]1 air handlers,filter boxes,and ❑Does Not .9 building cavities used as return .ducts are sealed. DNot Observable ONot Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not M' ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 QF or chilled fluids ❑Does Not below 55 QF are insulated to R-3. DNot Observable ❑Not Applicable 403.4 Circulating service hot water R- R- ❑Complies [FRl8]2 pipes are insulated to R-2. ❑Does Not J ❑Not Observable _❑Not Applicable 403.5 Automatic or gravity dampers are DComplies [FR19]2 installed on all outdoor air ❑Does Not 4 intakes and exhausts. []Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) j Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 5 of 7 Section # Insulation Inspection Complies? Comments/Assumptions &Re .ID 303.1 All installed insulation labeled or ❑Complies [iN13)2 installed R-values provided. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact{Tier 3) Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 6 of 7 Section Plans Verified Field Verified & Re .ID 402.4.2, Building envelope tightness ACH 50= ACH 50= ❑Complies 402.4.2.1 verified by blower door test result ❑Does Not [FI17]1 of&lt;7 ACH at 50 Pa.This Q) requirement may instead be met ❑Not Observable via visual inspection,in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 403.2.2 Duct tightness via post- cfm cfm ❑Complies [FI4]1 construction with maximum ❑Does Not V, leakage of 8 cfm to outdoors,or 12 cfm across systems.For ❑Not Observable rough-in tests,verification may ❑Not Applicable need to occur during Framing Inspection,with maximum leakage of 6 cfm across systems and 4 cfm without air handler. _ 403.1.1 Programmable thermostats ❑Complies [Fl9]2 installed on forced air furnaces. []Does Not ❑Not Observable ❑Not Applicable _ 403.1.2 Heat pump thermostat installed ❑Complies — [FI10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.4 Circulating service hot water ❑Complies [FIl1]2 systems have automatic or ❑Does Not 4 accessible manual controls. []Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies [F1712 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not J equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 05/03/16 Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 7 of 7 2010 New York Eriergy Conservation Construction Code Ermirgy Efficiency Certificate Above-Grade Wall 21.00 Below-Grade Wall 13.00 Floor 01.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces); Window 0.32 Door 0.32 Heating System: Cooling System: Water Heater: Name: Date: Comments