Loading...
ResCheck REScheck Software Version 4.6.2 FILE COPY Compliance Certificate 315.10-1-39 RC-000369-2016 Project Cerrone Builders Inc Cerrone Builders Inc. 46 Alessia Drive, Lot 7 Energy Code: 2010 New York Energy Conservation W. Mtn. Rd. Sub_ SFD w/gar• 2891 s.f. Location: Warren County, New York Construction Type: Single-family - xC3 r Project Type: New Construction LT10- 1 Conditioned Floor Area: 2,891 ft2 Glazing Area 1,1% N �Q�r1 Climate Zane: 6 (7635 HDD) U Permit Date: BUILC PermitNumber: G1U� }`BURY BUILDING ODES J Construction Site: Owner/Agent: Designer/Contractor:_" West Mtn Phase 2 Lot 7 Vision Engineering, LLC Queensbury, NY 12804 206 Glen Street Suite 56 Glens Falls, NY 12801 Compliance: Passes using UA trade-off Compliance: 1.8%Better Than Code Maximum UA: 447 Your UA: 439 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home- Envelope Assemblies Gross Area Cavity Cont. Per meter Wall 1:Wood Frame, 16" o.c. 1,620 21.0 0.0 0.057 80 Window 1:Vinyl Frame:Double Pane with Low-E 126 0.340 43 Door 1: Solid 34 0.280 10 Door 2: Glass 40 0.340 14 Door 3: Solid 18 0.140 3 Wall 2:Wood Frame, 16" o.c. 1.,635 21,0 0.0 0,057 84 Window 2: Vinyl Frame:Double Pane with Low-E 170 0.340 58 Ceiling 1: Raised or Energy Truss 1,352 38,0 0.0 0.025 34 Ceiling 2: Flat Ceiling or Scissor Truss 167 38.0 0.0 0.030 5 Ceiling 3: Cathedral Ceiling 114 21.0 0.0 0.048 5 Basement Wall 1: Solid Concrete or Masonry 1,426 0.0 11.0 0.059 83 Wall height: 8.8' Depth below grade: 7.0' Insulation depth: 8,8' Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 17 0.340 6 Floor 1: All-Wood JoistfTruss:Over Outside Air 5 30.0 0.0 0.033 0 Floor 2: All-Wood JoistfTruss:Over Unconditioned Space 410 30.0 0.0 0.033 14 Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLCIActive Projects VE11147 - DES - Page 1 of 7 Cerrone WM Lot 7\1147 RESCHECK.rck Compliance Statement: The proposed building design described here i consistent with the building plans, specifications, and other calculations submitted with the permit appl' tion.The proposed b din has been designed to 10 New York Energy Conservation Const uction Code require nts in REScheck Ver si 4.6. and to comply wi a mandatory requir ents listed in theREScheck sp do v(Ctiecklist. Name-Title lgnature Date vV ly f ill W ko. (ll (Y M i OF Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:IUsers\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE11147 - DES - Page 2 of 7 Cerrone WM Lot 7\1147 RESCHECK.rck REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2010 New York Energy Conservation Construction Code Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified Re1D Pre-Inspection/Plan Review Value Value — Complies Comments/Assumptions Req .11D Construction drawings and �� ❑Complies [PR111 documentation sufficiently ❑Does Not demonstrates energy code compliance for the building ❑Nat Observable ❑Not Applicable envelope. 103.2, Construction drawings and 4Y�❑Complies 403.7 documentation sufficiently ❑Does Not [PR31L demonstrates energy code []Not Observable y compliance for lighting and mechanical systems. Systems ❑Not Applicable serving multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR2]2 sized per ACCA Manual 5 based Btu/hr Btu/hr ❑Does Not is on loads per ACCA Manual J or Cooling: Cooling: []Not Observable other approved methods. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 i Medium Impact{Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:\Users\DWR DesktoptDropbox\VISION Engineering, LLC\Active Projects VE11147 - DES- Page 3 of 7 Cerrone WM Lot 711147 RESCHECK.rck Section # Foundation InspectionCorn plies? ! Comments/Assumptions &Req.ID 303.2.1 Exposed foundation insulation ❑Complies [FO11]2 protection. ❑Does Not []Not Observable _ ❑Not Applicable 403.8 `Snow melt controls. ❑Complies [FO1212 ❑Does Not [-]Not Observable ❑Not Applicable Additional Comments/Ass urnptions: 1 High impact(Tier 1) 2_Medium Impact(Tier 2) 3 !Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:IUsers\DWR Des ktop\DropboxWISION Engineering, LLC1Active Projects VE11147 - DES - Page 4 of 7 Cerrone WM Lot 711147 RESCHECK.rck Section plans Verified Field Verified # Framing/Rough-in Inspection Value Value ' Complies? Comments/Assumptions & Re .Ib { _ __ 402.4.4 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC [:]Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate&It;= 2.0 cfm leakage at 75 Pa. ❑Nat Observable ❑Not Applicable 403.2.2 All joints and seams of air ducts, ❑Complies [FR13]1 air handlers,filter boxes, and ❑Does Not building cavities used as return ducts are sealed. ❑Not Observable ❑Nat Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Nat Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 4F or chilled fluids ❑Does Not below 55 9F are insulated to R-3. []Not Observable []Not Applicable 403.4 Circulating service hot water R- R- ❑Complies [FR18]z pipes are insulated to R-2. ❑Does Not ❑Not Observable ❑Nat Applicable 403.5 Automatic or gravity dampers are [ Complies i— [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Nat Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1} 2 Medium Impact(Tier 2} 3 J Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:IUsers\DWR Des ktop\DropboxWISION Engineering, LLC1Active Projects VE11147 - DES- Page 5 of 7 Cerrone WM Lot 711147 RESCHECK.rck Section # Insulation Inspection Complies? Comments/Assumptions &Req.113 303.1 All installed insulation labeled or ❑Complies [IN13)2 installed R-values provided. ❑Does Not ' ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: —1t High Impact(Tier 1) 2 1 Medium Impact(Tier 2) � 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:1UserslDWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE11147 - DES - Page 6 of 7 Cerrone WM Lot 7'1147 RESCHECK.rck a section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies' Comments/Assumptions & Req.11) 402.4.2, Building envelope tightness ACH 50 = ACH 50 = ❑Complies 402.4.2.1 verified by blower door test result ❑Does Not [1=117]' of<7 ACH at 50 Pa.This requirement may instead be met ❑Not Observable via visual inspection, in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 403.2.2 Duct tightness via post- cfm cfm ❑Complies [F14]1 construction with maximum ❑Does Not leakage of 8 cfm to outdoors, or 12 cfm across systems. For ❑Not Observable rough-in tests,verification may ❑Not Applicable need to occur during Framing Inspection, with maximum leakage of 6 cfm across systems and 4 cfm without air handler. 403.1..1 Programmable thermostats T � ❑Complies [FI9]2 installed on forced air furnaces. ❑Does Not ❑Not Observable _ ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Nat Applicable 403.4 Circulating service hot water ❑Complies [FI11]2 systems have automatic or ❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 401,3 Compliance certificate posted. i ❑Complies [FI7]2 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) � Project Title: Cerrone Builders Inc Report date: 06/13/16 Data filename: C:IUsers\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1147 - DES- Page 7 of 7 Cerrone WM Lot 711147 RESCHECK.rck 2010 New York Energy conservation Construction Code Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Walt 11.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.34 Door 0.34 CoolingHeating & Heating System: Cooling System: Water Heater: Name: Date: Comments