Loading...
special inspection CONSTRUCTION TECHNOLOGY INSPECTION &TESTING DIVISION,P.D.&T.S., INC. 4 William Street,Ballston Lake,New York 12019 Phone: (518)399-1848 Fax: (518) 399-1913 CLIENT: AJ CATALFAMO CONSTRUCTION, INC. REPORT NUMBER: 1 :PAGE: 1 5 SIXTH AVENUE INSPECTION DATE: 02/25/20 HUDSON FALLS,NEW YORK 12839 OUR FILE NUMBER: 100.126 FIELD INSPECTOR: DAVE CASAW ATT'N: MR.NEIL KIERNAN PROJECT: JENKINSVILLE PARK MAINTENANCE FACILITY, OUEENSBURY, NEW YORK REINFORCING, STRUCTURAL & LIGHT GAUGE STEEL :: FIELD OBSERVATION REPORT SPECIFICATION FOR BOLTED CONNECTIONS: AISC:AMERICAN INSTITUTE OF STEEL CONSTRUCTION SPECIFICATION FOR COLUMN PLUMBNESS: AISC:AMERICAN INSTITUTE OF STEEL CONSTRUCTION SPECIFICATION FOR FIELD WELDING: AWS:STRUCTURAL WELDING CODE-STEEL(A.W.S.D1.1) SPECIFICATION FOR CONCRETE REINFORCEMENT: CRSI:CONCRETE REINFORCING STEEL INSTITUTE COLUMN ELEVATION SHOP/FIELD COLUMN THREADED LINE OR LOCATION FABRICATION PLUMBNESS FASTENERS REMARKS: ITEM: 1 COL/LINE ROOF ACCEPTABLE COLUMNS PLUMBED TO WITHIN 1:500. A/B @ 1/4 ELEVATION ITEM: 2 COL/LINE ROOF ACCEPTABLE THREADED FASTENERS INSTALLED AND A/B @ 1/4 ELEVATION TENSIONED TO BEYOND HAND-TIGHT. ITEM: 3 COL/LINE ROOF ROD TYPE X-BRACING PROPERLY A/B @ 2/3 ELEVATION ACCEPTABLE INSTALLED AND TENSIONED. ITEM: 4 COL/LINE WALL ACCEPTABLE ROD TYPE X-BRACING WITH TURNBUCKLE A/1 -B/1 PROPERLY INSTALLED AND TENSIONED. ITEM: 5 REPORT DISTRIBUTION: RESPECTFULLY SUBMITTED, I:FILE 5: CONSTRUCTION TECHNOLOGY 2: 6: Rete&tf 3: 7: ROBERT BEHAN(NICET) 4: R: MANAGER TECHNICAL SERVICES