ResCheck REScheck Software Version 4.5.0 cl�(J Compliance Certificate - , 2Ui4 Project The Abele Residence N D RUp O Energy Code: 2010 New York Energy Conservation Location: Warren County, New York Construction Type: Single-family Project Type: New Construction _ c� Orientation: Bldg. faces 270 deg. from North Conditioned Floor Area: 1,975 ft2 Glazing Area 20% o OFES Climate Zane: 6 (7635 HDD) Permit Date: 22 September, 2014 Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 102 Rockhurst Road Abele Builders Queensbury, NY 14 Corporate Drive Clifton Park,NY 12065 �Compliance: Passes using UA trade-off Compliance: 1.1%Better Than Code Maximum UA: 267 Your UA: 264 The%Better or Worse Than Code Index reflects how close to compliance the house is based an code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Glazing Assembly or R-Value R-Value or Door UA Perimeter U-Factor Foundation Walls:Solid Concrete or Masonry 360 0.0 21.0 0.035 13 Orientation: Front Wall height: 8.6' Depth below grade: 7.6' Insulation depth: 8.6' Foundation Wall @ Walk-out:Wood Frame, 16" D.C. 353 21.0 0.0 0.057 14 Orientation: Back 1x Bed#2 (E): Wood Frame:Double Pane with Low-E 31 0.290 9 Orientation: Back Living#5: Glass 53 0.300 16 Orientation: Back 1x Bed#3 (E):Wood Frame:Double Pane with Low-E 31 0.290 9 Orientation: Back Foundation Walls: Solid Concrete or Masonry 361 0.0 21.0 0.035 13 Orientation: Left side Wall height: 8.6' Depth below grade: 7.6' Insulation depth: 8.6' Foundation Walls: Solid Concrete or Masonry 241 0.0 21.0 0.035 8 Orientation: Right side Wall height: 8.6' Depth below grade: 7.6' Insulation depth: 8.6' First Floor Walls:Wood Frame. 16" o.c. 420 21.0 0.0 0.057 18 Orientation: Front Project Title:The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 1 of 8 Check\102 Rockhurst Road.rck Gross Area Glazing Assembly or avity ont. or Door UA 2x Mud(B):Wood Frame:Double Pane with Low-E 12 0.290 3 Orientation: Front 1x Stair(G):Wood Frame:Double Pane with Low-E 39 0.290 11 Orientation: Front 1x Powder(8):Wood Frame:Double Pane with Low-E 6 0.290 2 Orientation: Front #1 Foyer: Solid 21 0.190 4 Orientation: Front 3x Master Bath (B):Wood Frame:Double Pane with Low-E 18 0.290 5 Orientation: Front First Floor Walls:Wood Frame, 16" o.c. 440 21.0 0.0 0.057 18 Orientation: Back 1x Master Bed (F):Wood Frame:Double Pane with Low-E 35 0.290 10 Orientation: Back 1x Dining (F):Wood Frame:Double Pane with Low-E 35 0.290 10 Orientation: Back 1x Living (H): Wood Frame:Double Pane with Low-E 48 0.290 14 Orientation: Back First Floor Walls:Wood Frame, 16"o.c. 422 21.0 0.0 0.057 21 Orientation: Left side Dining #5: Glass 53 0.300 16 Orientation: Left side First Floor Walls:Wood Frame,16"o.c. 280 21.0 0.0 0.057 15 Orientation: Right side 3x Master Bed (B):Wood Frame:Double Pane with Low-E 18 0.290 5 Orientation: Front Ceiling: Raised or Energy Truss 1,209 38.0 0.0 0.025 30 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building as been designed to meet the 2010 New York Energy Conservation Construction Code requirements in REScheck Version 4.5.0 to mply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-TitleY Sign atup Date Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 2 of 8 Check\102 Rockhurst Road.rck REScheck Software Version 4.5.0 Inspection Checklist Energy Code: 2010 New York Energy Conservation Construction Code Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value complies? Comments/Assumptions &Reg.] 103.2 Construction drawings and ❑Complies [PR1]1 documentation sufficiently ❑Does Not 0 demonstrates energy code compliance for the building ❑Not Observable envelope. ❑Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation sufficiently ❑Does Not [PR3]1 demonstrates energy code g compliance for lighting and [:]Not Observable mechanical systems.Systems ❑Not Applicable serving multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR2]' sized per ACOA Manual S based Btu/hr Btu/hr ❑Does Not on loads per ACOA Manual J or Cooling: Cooling: other approved methods. Btu/hr Btu/hr ❑Not Observable — ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 3 of 8 Check\102 Rockhurst Road.rck 2010 New York Foundation Inspection Complies? Comments/Assumptions Ener 303.2.1 Exposed foundation insulation ❑Complies [F011]' protection. ❑Does Not .dJ ❑Not Observable ❑Not Applicable 403.8 Snow melt controls. ❑Complies [F012]' ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Ter 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 4 of 8 Check\102 Rockhurst Road.rck Section Plans Verified Field Verified # Framing/Rough-In Inspection Value &Re .ID Value Complies? Comments/Assumptions 402.4.4 Fenestration that is not site built ❑Complies [FR20]1 is listed and labeled as meeting ❑Does Not Q' AAMA/WDMA/CSA 101/1.5.2/A440 ❑Not Observable or has infiltration rates per NFRC ❑Not 400 that do not exceed code Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate&It;= 2.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.2.1 Supply ducts in attics are R- R-_ ❑Complies [FR12]1 insulated to R-8.All other ducts R- R- []Does Not 10 in unconditioned spaces or — outside the building envelope are ❑Not Observable insulated to R-6.Not applicable if ❑Not Applicable all systems are ductless. 403.2.2 All joints and seams of air ducts, ❑Complies [FR13]1 air handlers,filter boxes, and ❑Does Not building cavities used as return ducts are sealed. []Not Observable ❑Not Applicable 403.2.3 Building cavities are not used as - - ❑Complies [FR15]3 ducts or plenums. ❑Does Not U ',❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R-- R-- ❑Complies [FR17]2 above 105 QF or chilled fluids ❑Does Not 0 below 55 QF are insulated to R-3. []Not Observable ❑Not Applicable 403.4 Circulating service hot water R-- R-_ ❑Complies [FR18]2 pipes are insulated to R-2. ❑Does Not 4 []Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ;❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(tier 3) Project Title:The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 5 of 8 Check\102 Rockhurst Road.rck 2010 New York Insulation Inspection Complies? Comments/Assumptions Ener 303.1 All installed insulation labeled or ❑Complies (IN13]2 installed R-values provided. ❑Does Not 5b ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 6 of B Check\102 Rockhurst Road.rck Section Plans Verified Field Verified # Final Inspection Provisions &R .10 Value Value Complies? Comments/Assumptions 402.4.2, Building envelope tightness ACH 50 =_ ACH 50 =_ ❑Complies 402.4.2.1 verified by blower door test result ❑Does Not [FI17]1 of<7 ACH at 50 Pa.This requirement may instead be met ❑Not Observable via visual inspection,in which ❑Not Applicable case verification may need to occur during Insulation Inspection. 402.4.3 Woad-burning fireplaces have ❑Complies [FI8]' gasketed doors and outdoor ;❑Does Not combustion air. - ?❑Not Observable ❑Not Applicable 403.2.2 Duct tightness via post- _cfm _cfm ❑Complies [F14]1 construction with maximum ❑Does Not leakage of 8 cfm to outdoors,or 12 cfm across systems.For ❑Not Observable rough-in tests,verification may ❑Not Applicable need to occur during Framing Inspection,with maximum leakage of 6 cfm across systems and 4 cfm without air handler. 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed on forced air furnaces. ❑Does Not 10 .❑Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 on heat pumps. ❑Does Not U' ❑Not Observable ❑Not Applicable 403.4 Circulating service hot water ❑Complies [Flll]z systems have automatic or ❑Does Not 0 accessible manual controls. ❑Not Observable ❑Not Applicable 403.9.1 Readily accessible switch on ❑Complies [F11213 heaters for swimming pools. []Does Not ❑Not Observable ❑Not Applicable 403.9.2 Timer switches on pool heaters ❑Complies [FI19]3 and pumps are present. ❑Does Not ❑Not Observable ❑Not Applicable 403.9.3 Heated swimming pools have a ❑Complies [F120]3 cover.Covers on pools heated ❑Does Not Q, over 90 9F are insulated to R-12. ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies IFI712 ❑Does Not �J []Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F11813 mechanical and water heating ❑Does Not equipment have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 1 2 Medium Impact(Tier 2) j 3 I Low Impact(Tier 3) Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 7 of 8 Check\102 Rockhurst Road.rck II High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: The Abele Residence Report date: 09/30/14 Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 8 of 8 Check\102 Rockhurst Road.rck 2010 New York Energy Conservation Construction Code Energy Efficiency Certificate Insulation Rating R-Value Wall 21.00 Floor 21.00 Ceiling / Roof 36.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 0.25 Door 0.30 0.25 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments