Loading...
LGPC modification ffINEW YORK Lake George STATE OF OPPORTUNITY_ Park Commission Do'-\_\ - _')- 20.E g) BRUCE E.YOUNG DAVE WICK Chairman Executive Director August 31, 2016 Christopher Abele 14 Bedford Circle Mechanicville, NY 12118 Permit#: 5234-38-14&5234-39-14 Wharf Modification Parcel#: 227.09-1-12, Town of Queensbury Project: Remove an existing wharf and construct a 40'long, 40'wide, two dock complex with an open-sided sundeck/boatcover and open-sided, rock-filled timber cribs to be used as support for wharfs in accordance with plans attached PERMIT MODIFICATION Dear Mr. &Mrs.Abele, In accordance with your written request of August 26, 2016, the above referenced permit is hereby modified to extend the expiration date to September 07,2017. All other terms and conditions remain as written in the original permit. Please attach this modification to the front of your original permit. If you have any questions please feel free to call me. Sincerely,� er Molly Gallagher Deputy Permit Administrator cc: Town of Queensbury SFP 0 1 2016 75 Fort George Road,P.O.Box 749,Lake George,NY 12845 1518.668.9347 Fax:518.668.5001 i www.lgpc.state.ny.us info@Igpc.state.ny.us NEWYORK Lake George STATE OF OPPORTUNITY. Park Commission ANDREW M. CUOMO BRUCE E. YOUNG DAVE WICK Governor Chairman Executive Director September 01, 2015 • Christopher Abele 14 Bedford Circle Mechanicville, NY 12118 Permit#: 5234-38-14 &5234-39-14 Wharf Modification Parcel#: 227.09-1-12,Town of Queensbury Project: Remove an existing wharf and construct a 40' long,40'wide, two dock complex with an open-sided sundeck/boatcover and open-sided, rock-filled timber cribs to be used as support for wharfs in accordance with plans attached PERMIT MODIFICATION Dear Mr.Abele, In accordance with your written request of August 28, 2015, the above referenced permit is hereby modified to extend the expiration date to September 07, 2016. All other terms and conditions remain as written in the original permit. Please attach this modification to the front of your original permit. If you have any questions please feel free to call me. Sincerely, Molly Gallagher Deputy Permit Administrator cc: Town of Queensbury • 75 Fort George Road,P.O.Box 749,Lake George,NY 128451 518.668.9347 Fax:518.668.5001 1 www.lgpc.state.ny.us info@Igpc.state.ny.us STATE ""NF'W'"'`'' State of New York : ,. Lake George Park Commission r ! 75 Fort George Rd, P.O. Box 749 -fi Lake George New York 12845 ' = TEL(518) 668-9347 FAX (518)668-5001 Bruce Young David Wick www•Igpc.state.ny.us info@Igpc.state.ny.us Chairman Executive Director November 06, 2014 Christopher Abele 14 Bedford Circle Mechanicville, NY 12118 Permit#: 5234-38-14 & 5234-39-14 Wharf Modification Parcel #: 227.09-1-12, Town of Queensbury Project: Remove an existing wharf and construct a 40' long, 40' wide, two dock complex with an open-sided sundeck/boatcover and open-sided, rock-filled timber cribs to be used as support for wharfs in accordance with plans attached PERMIT MODIFICATION In accordance with your written request the above referenced permit is hereby modified to authorize crib construction for the south pier as shown on the attached, revised Schedule A, page 6 of 10. All other terms and conditions remain as written in the original permit. Please attach this modification to the front of your original permit. If you have any questions please contact the undersigned. Sincerely, Molly Gallagher Deputy Permit Admi ltrator cc: Law Enforcement Town of Queensbury PLAN VIEW EXISTING DOCK AREA = 770t SF (crib plan) C PROPOSED DOCK AREA = 770± SF 7' x 12' 6x6 71MBER CRIB 7'x 12' 6x6 TIMBER CRIB 40.0' — 6.0' t:•:::a._r_:.r_ —10.0' s=s"'-s"_s e — J v, I M6x6 nMe�ER�OW M SUNO£CK POSTS 6.0' b 2' x 6' Extension 6'x 12' 6x6 71MBER CRIB N '� in of dock for storage locker. �j� 34.0' I ` "t Locker: 4 D x 6'W / + a— o i.,,i._i. • �.��� ma' .ri. i.,i. a: i. di r. i.,.i i.. O 0 CI p N TRIPLE 15lt 6x6MBERROW7a) Lo CID �.+ SUNOECK POSTS V 5.0' N ..0 a) 1- 6'x 12' 6x6 AMBER CRIB (.) CO W 34.0' �_ .1 C E �1 co a a 6'±_. 1-- 10.0'-- ¢��. ='.._ ++ NOV 05 2014 J 39.0' r7 , LAKE GEORGE PARK COMMISSION 3'x 12' 6x6 TIMBER CRIB 3' x 11' 6x6 AMBER CRIB Sheet 2 of 8 Dock & Sundeck Plans for Revised: 19 August 2014 Chris Abele �lD DRAFTING, LLC 102 Rockhurst Revised: 5 November 2014 Town of Queensbury 265 Aviation Road County of Warren Queensbury, New York 12804 TINP# 227.09-1-12 Date: 4 August 2014 Scale: 1/8" = 1' (Do Not Scale) (518) 339-7451 PL-2 STLATE OF State of New York .. _. Lake George Park Corpmission { tok 75 Fort George Rd, P.O.Box 749 , �. . Lake George New York 12845 tree tw.; TEL(518) 668-9347 FAX(518)668-5001 Bruce Young David Wick www.Igpc.state.ny.us info@lgpc.state.ny.us Chairman Executive Director September 08, 2014 Christopher Abele 14 Bedford Circle Mechanicville, NY 12118 Permit#5234-38-14 Wharf Construction Parcel #227.09-1-12 5234-39-14 Excavation/Fill Activity Town of Queensbury Dear Mr. Abele: Enclosed is your permit which was issued in accordance with the applicable provisions of the Park Commission's rules and regulations (6 NYCRR 645 & 646) and the Environmental Conservation Law. Please review the general and special conditions included in the permit; these are intended to minimize any environmental disturbance associated with the authorized activity. The Article 15 approval was issued under a special delegation agreement with the Department of Environmental Conservation who normally issues these approvals. This eliminates the need for separate application forms and fees which would otherwise apply to this project. Please note that it is the responsibility of the permittee and the permittee's agent to comply with all permit conditions. Further, the permit is valid only for the activity expressly authorized. Work beyond the scope of the permit shall be considered as work without a permit. The notice enclosed with the permit must be displayed in a conspicuous place near the project site during the entire period of construction and must be suitable protected from the elements. Any failure to comply with the terms of the permit may be treated as a violation of the Environmental Conservation Law. Questions regarding this permit should be directed to the undersigned. Should your plans change, you must contact this office to determine whether a modification to the permit is required prior to initiating construction. Please note the expiration date of the permit. If further time is required to complete the project, you must request renewal of the permit prior to this date. Your interest in maintaining the environmental quality of Lake George is greatly appreciated by the Commission. Sincerely '7f ' Molly Gallagher Deputy Permit Administrator cc: Town of Queensbury Warren County Code Enforcement(boathouses only) LGPC Permit Number State of New York Effective Date 5234-38-14 DM LAKE GEORGE PARK COMMISSION 09/08/2014 5234-39-14 EF { Modification or Renewal Date Type of Permit Expiration Date a tYciC3-9Fa' 511 New 09/08/2015 ❑ Renewal PERMIT ❑ Modification Under the Environmental Conservation Law ❑ Variance X Article 43,Title 1, 6NYCRR 646-1.1 Article 15, Title 5, 6NYCRR 608.5 Construction and Modification of Wharfs X Excavation and Placement of Fill in Navigable Waters Article 43,Title 1, 6NYCRR 646-1.1 Article 43, Title 1, 6NYCRR 646-1.2 Placement of Moorings Operation and Modification of Class A Marinas Article 43, Title 1, 6NYCRR 646-1.4 Article 43, Title 1, 6NYCRR 646-1.4 Recreational Use-New Recreational Use- Parasail Article 43,Title 1, 6NYCRR 646-1.4 Article 43, Title 1, 6NYCRR 646-1.4 Recreational Use-Seaplanes Recreational Use-Tour Boat Article 43,Title 1, Section 43-0117 Operation of ferries Article 43,Title 1, 6NYCRR 646-4 and certain other boats, barges and vessels restricted. Stormwater Management X 6 NYCRR Part 608 Water Quality Certification Permit Issued to Telephone Number Christopher Abele 365-4989 Address of Permittee 14 Bedford Circle Mechanicville, NY 12118 Contact Person (if not permittee) Telephone Number Facility Name Facility Address Private Lakefront 102 Rockhurst Rd County Warren Town Queensbury Parcel# 227.09-1-12 AUTHORIZED ACTIVITY Remove an existing wharf&construct a 40' long, 40' wide two dock complex with an open-sided sundeck/boatcover& open-sided, rock-filled timber cribs to be used as support for wharfs in accordance with plans attached as Schedule A and made part of this By the acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the Environmental Conservation Law, the Navigation Law, all applicable regulations, and the General and Special Conditions included as part of this permit. Deputy Permit Administrator: Molly Gallagher Lake George Park Commission, PO Box 749, Lake George NY 12845, 518-668-9347 Authorized,Signature Date �9��4 Page 1 of 10 GENERAL CONDITIONS 1. All activities authorized by this permit must be in strict 10. The permittee has accepted expressly, by the conformance with the plans attached as Schedule A and execution of the application, the full legal responsibility of made part of this permit. Modifications to the project all damages, direct or indirect, or whatever nature, and by require prior approval in writing from the Commission. whomever suffered, arising out of the project described herein and has agreed to indemnify and save harmless 2. The permittee and any contractor, project engineer, or the State from suits, actions, damages and costs of every other person responsible for the overall supervision of this name and description resulting from the said project. project shall read, understand and comply with this permit, including all special conditions to prevent environmental 11. The State of New York shall in no case be liable for degradation. any damage or injury to the structure or work herein authorized which may be caused by or result from future Inspections operations undertaken by the State for the conservation or 3. The Commission and/or the Department of improvement of navigation, or for other purposes, and no Environmental Conservation (the Department) may claim or right to compensation shall accrue from any such conduct such on-site surveys, investigations, damage. examinations, and evaluations from time-to-time as it deems necessary to ensure compliance with the terms 12. Regulatory fees are due April 1 of each year for and conditions of this permit. docks,wharfs and moorings. 4. A copy of this permit must be available at all times at 13. Wharfs and moorings authorized herein are for the project site during performance of the authorized residential use only and shall not be used for commercial, activities. Failure to produce a copy of the permit upon association or marina purposes. request by a Commission or a Department representative is a violation of this permit. Environmental Protection 14. Disturbance to the bed and banks of Lake George Permit Modifications& Renewals shall be kept to the minimum necessary to complete the 5. The permittee is responsible for keeping the permit project. active by submitting a renewal application, including any forms, fees or supplemental information which may be 15. All necessary precautions shall be taken to preclude required by the Commission, no later than 30 days prior to contamination of any wetland or waterway by suspended the expiration of this permit. solids, sediment, fuels, solvents, lubricants, epoxy coatings, paint, concrete, leachate or any other 6. Any change or modification in any of the activities environmentally deleterious materials associated with the authorized by this permit is subject to prior review and project. approval by the Commission. Any modification of this permit granted by the Commission must be in writing and 16. Heavy equipment, including bulldozers, backhoes, attached hereto. payloaders, etc., shall not be driven in the water. 7. The permittee is responsible for obtaining any other 17. Any material dredged in the prosecution of the work permits, approvals, land easements, and rights-of-way herein permitted shall be removed evenly,without leaving which may be required for this activity. large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to Other Legal Obligations of Permittee cause damage to navigable channels or to the banks of a 8. Granting of this permit does not relieve the permittee waterway. of the responsibility of obtaining any other permission, consent, permit, or approval from the US Army Corps of 18. Any debris or excess materials from construction of Engineers, US Coast Guard, NYS Office of General this project shall be immediately and completely removed Services, NYS Department of Environmental from the bed and banks of all water areas to an Conservation, NYS Department of Health,Adirondack appropriate upland area for disposal. Park Agency, or local government which may be required. 19. There shall be no unreasonable interference with 9. This permit shall not be construed as conveying to the navigation by the work herein authorized. permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the 20. Wood treated with Creosote, Pentachlorophenol or permitted work or as authorizing the impairment of any CCA(Chromated Copper Arsenate) is prohibited for rights, title or interest in real or personal property held or in-water and above-water use. vested in a person not a party to the permit. LGPC Permit#: 5234-38-14&5234-39-14 Page 2 of 10 • GENERAL CONDITIONS 21. If upon the expiration or revocation of this permit, the 30. No rocks for use in construction are to come from the project hereby authorized has not been completed, the lake bed. permittee shall,without expense to the State, and to such extent and in such time and manner as the Commission The following specifications apply to the construction or or the Department may require, remove all or any portion replacement of rock-filled cribs. Existing cribs may be of the uncompleted structure or fill and restore the site to repaired. its former condition. No claim shall be made against the State of New York on account of any such removal or 31. The size of any individual crib shall not exceed 8 feet alteration. by 12 feet. 22. If future operations by the State of New York require 32. Spacing between cribs shall not be less than 8 feet. A an alteration in the position or the structure or work herein minimum of 6 feet of open water shall be maintained authorized, or if, in the opinion of the Commission or the between the shoreline and the first crib to allow for free Department, it shall cause unreasonable obstruction to circulation of water. • the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the 33. Completed cribs shall be of the"open-sided"type State, or cause loss or destruction of the natural construction and provide for at least 40%unboarded resources of the State, the owner may be ordered by the water contact area to the rock fill. Commission or the Department to remove or alter the structural work, obstructions, or hazards caused thereby 34. If granted under 6NYCRR Part 608, the Lake George without expense to the State. Park Commission hereby certifies that the subject project will not contravene effluent limitations or other limitations Wharf Construction Specifications or standards under Sections 301, 302, 303, 306 and 307 The following conditions apply to all newly constructed of the Clean Water Act of 1977 (PL 95-217)provided that wharfs which have not received a variance from any of all of the conditions listed herein are met. these limits: Moorings 23. The location of the mean low water mark must be 35. Moorings must meet the following minimum field verified prior to construction. In no case shall any specifications: the buoy shall be all white with a one inch part of the wharf extend further than 40'from the mean blue strip placed horizontally around the circumference low water mark. above the water line and a one inch strip of reflector tape placed around the upper part of the buoy;at least one 24. The maximum surface area of any dock or wharf shall cubic foot of buoy is to be above the waterline. be seven hundred square feet, including any walkway. The following conditions apply to all new moorings which 25. The maximum width of any pier shall be eight feet and have not received a variance from any of these limits: the minimum width of any pier shall be two feet. 36. Moorings shall be placed so that vessels moored to 26. The maximum width of any dock or wharf, including them, at the full swing of their mooring or anchor line,will all lateral projections, shall be forty feet. be no closer than twenty feet to the projection of the property lines extended into the lake along the axis of the 27. No structure shall be constructed on a dock, wharf or property lines as they intersect the lake, or a line extended mooring which exceeds sixteen feet in height above the at a right angle to the mean high-water mark,whichever mean high water mark and which is not in compliance results in the greater setback. with local zoning. 37. Moorings shall not be placed so that the full swing of 28. Every dock or wharf constructed shall have a the vessel extends more than one hundred feet offshore minimum setback of twenty feet from the adjacent from the mean high-water mark. property line extended into the lake on the same axis as the property line runs onshore where it meets the lake, or at a right angle to the mean high-water mark,whichever results in the greater setback. Crib Work 29. Stone used for filling shall be clean (not contain any material than can pass through a No. 8 sieve). The stone shall not be less than six(6) inches in diameter. LGPC Permit#: 5234-38-14& 5234-39-14 Page 3 of 10 0-1.4 I z Tr Proposed Dock & undeck — Cc oh O M 2 i v=i I M ' 7' 6' 3 ' O a --,- - It) Ls I v. Shoreline per Warren ? i ' z MCounty Tax Map \ .(1 a 14.1 I i� CC Lu Q O oct Q Q I O I rr M fl 7 rr \v) , I MHWL - i v co m o rt � Cl) d N ' 1 - LL 32 1 '� 3 -� �� ��-' /� !__ 28 328 \ �L _�—✓ —529 329 \� , •r Base Survey Proposed Stairs Z (32± `SF above MHWL) W z . J x '. )-- a cc rc Sh Revised: 19 Au gust 2014 DTD DRAF 265 A via tion Roa, Queensbury, New (518) 339—7451 Date: 4 August 2014 Scale: 1 /8" = 1' (Do Not Scale) , • w �f ? l'' Proposed/Dock & Sundeck — + w rn 1 CC 0 M et O +C7). \ (1)\IN �' 6' 3' ' 0 in T Q 05 W 05 Z Existing D ck & Sundeck r — el 00 Shoreline per Warren ' o o LI IY 2 County Tax Map Q a � M '` + Oai c 1 % Wto a m * M M \ / d \ � ' 1 r V C� f0 d \ \ b MHWL j . � � ; ; 1 + cn a a N {t 4 • I i i-V 1 LI_ cQJ i 32 I 328 !�_��� �- --! 329 329 j ,r Base Survey Proposed Stairs w (32t t'F above MHWL) W _z 1 Existing Stairs W a. (50± SF above MHWL) c, a a Sh Revised: 19 August 201 4 DTD DRAF 265 Aviation Roa Queensbury, New (518) 339—7451 Date: 4 August 2014 Scale: 1/8" = 1' (Do Not Scale) PLAN VIEW EXISTING DOCK AREA=770t SF (crib Plan) O PROPOSED DOCK AREA= 770±SF 7'x 12' 6x6 T/MBER CRIB 7' x 12' 6x6 TIMBER CRIB \--. 40.0' I } y 6.0' rlAtY=^r=' F- 10.0' --••• iffigO•! ;!-• ge 2 TVI t\ M TRIPLE COURSE i CI 6x6 TIMBER BELOW N SUNDECK POSTS ID 6.0' O W 6' x 12' 6x6 77MBER CRIB c 'Cf 2' x 6' Extension of dock for storage locker. - /// 34.0' i ap Locker: 40 x 6'W ~ / o o ;. i. :. i. �. iS, 10.0' O Cr or-Vie-.err'ogror 0 41, CD TRIPLE COURSE 1 4.1C 6x6 TIMBER BELOW CD CD I= SUNDECK POSTS O V 5.0' CC cl) 6'x 12' 6x6 TIMBER CRIB N (/) d d 34.0' 1 0 39.0' rri NYDRAUUCALL Y POUNDED POST DOCK CONSTRUCTION (METAL OR WOOD POSTS) Sheet 2 of 8 Dock & Sundeck Plans for Revised: 19 August 2014D DRAFTING, LLC Chris Abele 102 Rockhurst Town of Queensbury 265 Aviation Road County of Warren Queensbury, New York 12804 TMP# 227.09-1-12 Date: 4 August 2014 Scale: 1/8" = 1' (Do Not Scale) (51B) 339-7451 PL-2 PLAN VIEW EXISTING DOCK AREA=770±SF (with sundeck) O PROPOSED DOCK AREA=770t SF 40' 0" J.- Post Below O _nllain I________—EC Au G202014 ) Proposed Stairs & Landing c / (or ramp T.B.D.) 1 LpKEGEORG Ch DOCK T T M ii, 2' x 6' Extension 4 • . . . a c., oi'f of dock for storage locker. et Locker: 4'O x 6'W `- 34' 9" Overhang M Sundeck O Q o .jr, y In r DOCK -6 /'- # 1 . m E ina a Sheet 1 of 8 Dock & Sundeck Plans for Revised: 19 August 2014 DTI,DRAFTING, LLC Chris Abele 102 Rockhurst 265 Aviation Road Town of Queensbury Queensbury, New York 12804 County of Warren TAP," 227.09-1-12 Date: 4 August 2014 Scale: 1/8" = 1' (Do Not Scale) (518) 339-7451 PL-1 EAST ELEVATION RaY_In_Llin, Q NOTE: ALL MEASUREMENTS MUST BE VERIFIED BY CONTRACTOR. 1; AUG 14 2014 , W(EGEORGE R COMMISSION OMMISSION • METAL 4 COMPOSITE POST i w/PEENtY CAME RAIL —— — —— — - _ 15'3' ------------i Z I• h I I I I 11 1 I J 5MRT� I I 'v ARct15MINGL (.14a clAtli,16 ,1) 6rAr.6m fikk , 8'6'. 1° 7:2 T. Af-/ -- = FACIA TRIM (see detail) 4x8 ANGLE BRACE _ 4x611 POST 0 _ _ .. 8x8 PT POST r` = ® _ srORAGe9Y wart exTCUOR DooR — TRIM T.D.D.DY 50MIX MER --- - - - -------------�6!_ei} Sheet 3 of 8 Dock & Sundeck Plans forInin Chris Abele DRAFTING, LLC 102 Rockhurst Town of Queensbury 265 Aviation Rood County of Warren Queensbury, New York 12804 TMP# 227.09-1-12 Date: 4 August 2014 Scale: 1/4" = 1' (Do Not Scale) (518) 339-7451 EL-1 Schedule A Page 8 of 10 Permit#5234-38-14 & 5234-39-14 NORTH ELEVATION0 1 NOTE: ALL MEASUREMENTS MUST BE ';U\It F ( E�`� `-VERIFIED BY CONTRACTOR. AU6t----------1 LtJCEGEORGE Pia C06+MISSION 1 4'x 3'6'LANDING • METAL 4 COMPOSITE POST STAIR REQ. r w/PEENEY CABLE RAIL MAX.RIBS v 8' / fMIN.RUN�9' RAIL t�36' 12 ir m r T Ellf-rriTVITST1100141WIVAII?ilfiNVINNWrIVIN-4 8E1 WILY cro 'in - ' ,-7 ' ,,-., rn,--— ii . ,-111 ‘-- rX,44 Mat BRAt: -77 - r-8x8 PT POST -- .-Evenly Spaced - - - _ - J POSSIBLE PLATFORM - (PT Wood,Stone or Paver) NSTORAGE LOCKER — (2)6x6 PT POST M/7P BRACE WRAP vd I x TRIM,IP DESIRED Sheet 4 of 8 Dock & Sundeck Plans forDID Chris Abele DRAFTING, LLC 102 Rockhurst Town of Queensbury 265 Aviation Rood County of Warren 0ueensbury, New York 12804 TMP# 227.09_1-12 Date: 4 August 2014 Scale: 1/4" = 1' (Do Not Scale) (518) 339-7451 I EL—2 Schedule A Page 9 of 10 Permit#5234-38-14 & 5234-39-14 SOUTH ELEVATION i \ 1 14.1°4 NOTE: ALL MEASUREMENTS MUST BE �� Ut CO �gS10� VERIFIED BY CONTRACTOR. ki.GE00,Ti • us, 4'x 3'6'LANDING METAL 4 COMPOSITE POST STAIR-6' - _ 44 FEENEY CABLE RAIL _ - - ------------1 �3�� MAX.RISE RUN-9' —\ RAIL a 36' SKIRT ROOP 4/ T r t � � r 7 lr s t `C 7 T T l T Y � �r ARcn snING� m m f J�(� j�( JJf f�( fff ," f c 8� 1 ll LL Ll Il h Ll 111 IJ JWl I it l u u � FACIA TRIM '` --________11, < 4_ f \ \ \ \ \� r 4�C MGM DRPQ J� POSSIBLE PLATFORM STORAGE LOCKER 8rB PT POST - - (PT Wood,Stone or Paver) i (2)6x6 PT POST wl''BRACE Q Q' WRAP w4 I x TRIM,IP DESIw� Sheet 5 of 8 Dock & Sundeck Plans forDin Chris Abele DRAFTING, LLC 102 Rockhurst Town of Queensbury 265 Aviation Road County of Warren Queensbury, New York 12804 TMPI 227.09-1-12 Date: 4 August 2014 Scale: 1/4" = 1' (Do Not Scale) (518) 339-7451 EL-3 Schedule A Page 10 of 10 Permit#5234-38-14 & 5234-39-14 ts STATE OF NEW YORK LAKE GEORGE PARK GMMISSI NOTICE: A permit has been issued for wharf repair, modification or construction at this site. For further information, contact the Lake George Park Commission at PO Box 749, Lake George NY, 12845, 518-668-9347 Permit ID: 5234-38-14 -14 & 5234-39-14 Permittee: Christopher Abele Expiration Date of Authorization: September 08, 2015 This notice must be posted in a conspicuous place & protected from the elements during the period of construction. To the permittee: Please sign, fold, tape shut and return upon completion of the project. FOLD #2 Place Christopher Abele Stamp 14 Bedford Circle Here Mechanicville, NY 12118 Molly Gallagher Lake George Park Commission PO Box 749 Lake George NY 12845 FOLD #1 Certification of Completion of Work Authorized By Permit # 5234-38-14 issued on September 08, 2014 Parcel # 227.09-1-12, Town of Queensbury Project: Remove an existing wharf & construct a 40' long, 40' wide two dock complex with an open-sided sundeck/boatcover & open-sided, rock-filled timber cribs to be used as support for wharfs in accordance with plans attached as Schedule A and made part of this I hereby certify that the project authorized by the above referenced permit was completed on / / in full compliance with all conditions and in accordance with all drawings made a part of the above mentioned permit. Notice: in a written statement, any person who knowingly makes a false statement which such person does not believe to be true has committed a crime under the laws of the State of New York punishable as a Class A misdemeanor (PL Sec. 210.45). X Owner's Signature Date K''A''E OF NEW '"'1K State of New York Lake George Park Commission L E fi l 75 Fort George Rd, P.O. Box 749 Lake George New York 12845 it '=rh.e�A - TEL(518)668-9347 FAX(518)668-5001 Bruce Young David Wick www•Igpc.state.ny.us info@Igpc.state.ny.us Chairman Executive Director NOTICE Date: September 08, 2014 Owner: Christopher Abele Facility: Private Lakefront Parcel #: 227.09-1-12, Town of Queensbury Lakefront: 122.00 Account#: 912 Address: 102 Rockhurst Rd The enclosed permit }Q authorizes new mooring(s), new wharf(s), new boat/PWC lift or dock modification, mooring modification and supercedes Existing Wharf or Mooring # and/or Permit# Once the permitted project is complete your annual registration fee will be: For residential properties: mooring(s) 0 X $37.50 = $0.00 ❑ New Account wharf(s) 2 X $37.50 = $75.00 493 No Change For Commercial or Association properties, fees may need to be redetermined.