Loading...
as builtEngineering America Company i 8 Fielding Street | Glens Falls,NY 12801 518-615-0201 Georgeyas3@yahoo.com WN OF QUE! May 19,2020 Re:Record Drawing &Certification ‘Thompson Residence 789 Bay Road Town of Queensbury,NY Mr.Mark Smith Building Inspector Dear Sir: This letter is to certify that the septic system was installed in substantial compliance with the drawings provided for this system with a couple of changes as follows: ~Lam the designer of this septic system. -1am personally fai the site conditions and in consideration of those conditions the system was designed in compliance with the Town of Queensbury standards requiring two (2)feetof separation between the bottom of the trench and the annual high-water table in the area. r -_lobserved the system being installed on May 19,2020 =Tothe best of my knowledge the system was installed in substantial compliance with the design documents,and due to one (1)field condition the following change(s)were made: ©the existing line from the house was 3’-6"below grade requiring that the field be installed deeper than anticipated ©therefore,we switched from Infiltrators to a pipe/stone system and changed the field to (4) runs of 50-ft each ©avent pipe was installed on the end of the further most pipe -Attached is a stamped Record Drawing of the system,and photographs of the system during installation. If you have any questions regarding these items please contact me. Pipe from Tank to Dist.Box Dist Box w/Levelers Page 1 Record Pictures 789 Bay Road May 19,2020 Typical Trench Install Vent at End of Furthermost Pips Page 2 Record Pictures 789 Bay Road May 19,2020 =ted Bay Road (2 Record Drawing Record DrawingGore789BayRoad 5-19-2020 By Engineering America Co. 5-19-2020 519-2020