Loading...
CC-0109-2020PRINCIPLE STRUCTURE Office UseOnlyPERMITAPPLICATION Permit #:(-009G~-2aLo PpermitFee:$_| S 59:3S tec.Fee:s___v/A MAR 11 2020 invoice #:___2 WU Town of Queensbury 742 Bay Road,Queensbury,NY 12804 P:818-761-8256 www queensbury net Project Location:/20 Aviation hex Bcecoes | Tax Map #:425,/&-/—73 subdivision Name: TOWN BD.RESOLUTION 86-2013:$850 recreation fee for new dwelling units:single family,duplexes/two-family, multiplefamily,apartments,condominiums,townhouses,and/or manufactured &modular homes,but not mobile homes.This is in addition to the permit fee(s). CONTACT INFORMATION: AnpheanName(s):popConstructionwaiee.57 (Rowley Road Ffudson Falls NY /2837 Cell Phone:_(J/6 )RAP-F704 landline:_(45/%_)779-033 © Email:Cindya _@ hill Fep Construction Co Com Primary Owner(s): Name(s):/yted Cerebral falsy Association of the Tri-Counties Ine Mailing Address,C/S/Z:28 Corporate lOoeds Blvd.35 Foor Albarn Cell Phone:_()Land Line:_() Email: O Check if all work will be performed by homeowner only Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s):Hi lltoe Construct on Contractor Trade:Genecal Contackor Mailing Address,C/s/Z:5!Ceowley Road ttudson Falls NY 12837 Cell Phone:(5/§_)2 A9-§70Y landline:_(.5/5_)7298-03357 Email Cindya_@ hllhypConstvuehiencos Com List all additional contractors on the back of this form Architect(s)/Engineer(s): Business Name:__O+udio Seven Dyehteat 5 Contact Name(s):Jetin Mailing Address,C/S/Z:PO (ox Ju 3 bef Albany,N Qe Cell Phone:)landline:(5/8)£29 -Tis Email:, Contact Person for Building &Code Compliance:__10m Albrecht Sie. Cell Phone:(5/5_)A29-§707 tandline:(5/5)796 0335 Email:Cindy _@ hh.We pcenstruchiongo,com Princiole Structure Packet Revised February 2019 TYPE:commercial ___Residential WORK CLASS: Single-Family __Two-Family __Multi-Family (#of units __) Townhouse __Business Office _Retail __Hotel/Motel Industria/Warehouse __Garage(#ofcars__)4 Other(describe Bes e ite GaveneoyFacilt+y75¥59-5 STRUCTURE SQUARE FOOTAGE:GARAGE SQUARE FOOTAG! floor,446A 5 O 1 floor: 2"floor:2°floor: 3"floor: Basement (habitable space):37 YQ =F. Total square feet:_/)ON < Total square feet:5 294.50 ADDITIONAL PROJECT INFORMATION: 1. 2. 3. Princo Structure Packet Estimated Cost of Construction:$7.220,00 Proposed use of the building:Care faci /,ty 1 If Commercial or Industrial,indicate the name of the business:Respit e Care Source of HenGos)Oil Propane Solar Other: Fireplaces needa separate Fuel Burning Appliances &Chimney Application,one per appliance) Are there any structures not shown on the plot plan?YES fo)Explain: Are there any easements on the property?YES SITE INFORMATION: a.What is the dimensions or acreage of the parcel?G.7G ACE S b.Is this a corner lot?YES C.NO Will the grade be changed as aresultot the construction?YS.KO.) d.What is the water source?PUBLIC PRIVATE.WELL e.Is the parcel on SEWER or a PRIVATE SEPTIC system?Ct vet ec Revised February 2018 DECLARATION: 1.lacknowledge that no construction shall commence prior to issuance of a valid building permit and work will be completed within a 12 month period, 2.Ifthe work is not completed by the tyear expiration date the permit may be renewed, subject to fees and department approval. 3.I certify that the application,plans and supporting materials are a true and complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,focal building laws and ordinances,and in conformance with local zoning regulations. 4.|acknowledge that prior to occupying the facilities proposed |,or my agents,will obtain a certificate of occupancy. 5.|understand that lWve are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance ofa certificate of occupancy. have read and agree to the above: Cindy $:Alloceeht siowarure:_(_ad A QMbieLA pate:7-70-20 2o PRINT NAMI Princiole Structure Packet Revised February 2019 Permit # Permit Fee:$f $2.00;inv Septic Variance’Yes ao SEPTIC DISPOSAL PERMIT APPLICATION rmmomannom far Tax Map ID #:60 Aviation Roa Project Location:«75 ./8 ~/-73 Applicant:. Name(s):14s Constructi con Mailing Address,C/S/z:5/7 CRow/ey Roa Ason Falls NY 72827 Cell Phone:_(5/¥)J29-P70 land line:(A7E )270 FFE Email Cindy @_©@ fi/itepLonstructionlo.Com Primary Owner(s):NaserGoveCeeitedCerebralfalsyAssociationofthsTr:-Counties Tic, Mailing Address,C/S/Z:0°2 Corporate.Locods Blvd 5%FJoor-Than Cell Phone:_()Land Line:_() Email:, O Check if all work will be performed by homeowner only Contractor:Wo nei,Comp documentation must be submitted with this application Contact Name(:Hid Yop Consteaed co Contractor Trade:_General Lontractor. Mailing Address,C/S/Z:.5/(Rowley Kozd idson Falls NY 7283 Cell Phone:_(5/f_)II2I-F7OF landline:(5/7)775-033Emai_Cindya@ ©[Hop Construction Ze “Com Engineer(s):.> Name(s):__&+,Engineering &(Consulting PLLC Mailing Address,c/s/z:PO Box din”Burnt Hills?NY 1a0a7-4d33 Cell Phone:_{)landline:(47 £)269-¥ Email: Albrecht Sie. ASVE)ZIPS OF 3 FE oN LO «COM Contact Person for Building &Code Compliance: Cell Phone:(5/%)QQ?F70¥Land Email:Cyndy @_C Ai //fopconstruc Principle Structure Packet Revised February 2019 RESIDENCE INFORMATION: Year Built [Gallons|#of bedrooms:|X gallons per |=total daily flow per day bedroom Garbage Grinder Yes [(No 1980 or older]150 Installed?(circle one) aeeiesi|30 Spa or Hot Tub Yes([No Installed?(circle one) 1992-Present|110 &°8 BO PARCEL INFORMATION: Topography Flat Rolling Steep Slope %Slope Soil Nature sand loam ___Clay Other (explain:1Groundwater‘At what depth?Non Bedrock/Impervious material|At what depth?)Domestic Water Supply ‘Municipal __Well {if well,water supply from any septic system absorption is___ft.) Percolation Test Rate:_»3Sperminuteperinch(test to be completed by licensed engineer/architect) 723 PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size()|J,500galions (min.size 1,000 gallons,add 250 gallons for each garbage cylinder or spa/hot tub System _(_Absorption field with #2 stone_|Total length _4/¢/§ft.;Each Trench Sift. Seepage Pit with #3 stone How many:Size: Alternative System Bed or other type: Holding Tank System Total required capacity?;tank size 3 # of tanks NOTES:1.Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved.The installed system must match the septic layout on file—no exceptions.3.As-built drawings must be submitted prior to the inspection,if there has been a change to the submitted plans. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void.|have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. rill idly S A Ib reeht pare:27-2020 SIGNATURE:&Loc sd Ob Lb DATE: Principle Structure Packet Revised February 2019, ACCESSORY STRUCTURE PERMIT APPLICATION oCTownofCeeeree:§12 742 Bay Road,Queensbury,NY 12804 Permit Fee:$_IZ> OC" P:518-761-8256 www.queensbury.net Invoice #:__ZUG projec tocation:/60 Aviation Roe of Tax MapiD#:_°95 +/8 -/-73 ‘Subdivision Name: CONTACT INFORMATION:YOUR yyy Applicant: Name(s):‘Wop Construction Mailing Address,C/S/2:S/(2ow/sey Road Hudson Falls NV J2839 Cell Phone:(5/7)2Q9-870Y land Line:(4576 _)7?F-023 Email Cindya ©by Fey Construction do.0m Primary Owner(s):> xName(s):_//p7ed D srofral Laloy Dssceiadion of the Te-Countes,Fie. Mailing Address,C/S/2:_22 (érporete lLeocds Blvd 5%Floor [bany, Cell Phone:_(),Land Line:_() Email: O Check if all work will be performed by homeowner only Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s):A//fop Construction Contractor Trade:__General (on fractore Mailing Address,C/S/Z:CRowJoy Road Hudson Falls NV IFFT Cell Phone:(5/8 )AQG-S70¥landline:(45/5)77-033 > Email.C I1fdyo @ Wy [ltep Construct onco.Conn List all additional contractors on the back of this form Architect{s}/Engineer(s): Business Name:Studio Seve n Areh ‘tect 5. Contact Name(s): Mailing Address,C/s/z:LD [ov J036 7 bany,NY Taka. Cell Phone:_()landline:(577)329 -756 © Email: Contact Person for Building &Code Compliance:__10m Albrecht Sie Cell Phone:_(5/9 )AAI-F704 landline:(4/5)779-033 ¥ Email:(yndyq ©hb TitepGonstructionCo «com Accessor Structure Apbeation Revised February 2019, Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_() Email: Land Line:( Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()Land Line:_( Email: Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/2: Cell Phone:_()Land Line:_( Email: Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()Land Line:_( Email: e Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_() Email: Land Line:{ Contractor(s):Workers’Comp documentation mustbe submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()Land Line:_( Email; oe Aecesory Structure Appieaton evsed February 2019, s PROJECT INFORMATION: TYPE:Me Commercial ____Residential WORK CLASS: Xboeck,Open Porch ___Solar Panels (w/o rafter upgrades)Carport Cell Tower Shed Pavilion,Pole Barn,Canopy ___Dock __.Gazebo Detached Garage __Boathouse (with or w/o sundeck)__3-Season Porch Other (description: SQUARE FOOTAGE OF STRUCTURE: Ast floor:HY!x32! 2"floor: Total square feet;__4/4/ ADDITIONAL PROJECT INFORMATION:4 y f 5 229 00 1,Estimated Cost of Construction:§JNC/uded in Bld Pes #2000 1 1 2.If Commercial project,what is the proposed use:Kespi te Care fee ihe ty 3.Are there any structures not shown on the plot plan?YES 0)Explain: kovee’4.Are there any easements on the property?Yes DECLARATION: 1.L acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2.Ifthework is not completed by the 1 year expiration date the permit may be renewed,subject to fees and department approval. 3.I certify that the application,plans and supporting materials are atrue and complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations. 4.|acknowledge that prior to occupying the facilities proposed |,or my agents,will obtain a certificate of occupancy. 5.lalso understand that |Ave are required to provide an as-built surveybyalicensedlandsurveyorofallnewlyconstructedfacilitiespriortoissuanceofacertificateofoccupancy. have read and agree to the above: pate:_3-0-7020 Revised February 2018,Accessory Structure Applation Center for 7DisabilityServices Where people get better at life March 19,2020 VIA FIRST CLASS MAIL & E-MAIL Mr.Dave Hatin Director Building and Codes Enforcement Town of Queensbury 742 Bay Road Queensbury,NY 12804 Re:160 Aviation Road Dear Mr.Hatin: 1am General Counsel for Center for Disability Services (“CFDS”)and its affiliates,including United Cerebral Palsy Association of the Tri-Counties,Inc.,also known as Prospect Center. 1 am in receipt of your March 13,2020,e-mail to John Van Oort (Studio Seven Architects)and Sue Finan (Director of Residential Operations at CFDS)regarding Prospect Center’s proposed residentialrespite at the above-referenced property.In the e-mail you opine that the planned residential structure should be classified as an Institutional Group I-1 because “there is no restriction of the mental or physical disability on the clients that can occupy this structure.”For the reasons stated below,we respecttillly believe that this opinion is inaccurate. Pursuant to New York State Building Code,an Institutional Group I-1 occupancy “shall include buildings,structures or portions thereof for more than 16 persons,excluding staff,who reside on a 24-hour basis in a supervised environment and receive custodial care.”See Section 308.3 emphasis added).Custodial care is defined as “[alssistance with day-to-day living tasks;such as assistance with cooking,taking medication,bathing,using toilet facilities and other tasks of daily living,Custodial care includes persons receiving care who have the ability to respond to emergency situations and evacuate at a slower rate and/or who have mental and psychiatric complications.”See Section 202.Significantly,Section 308.3.3 provides that a]facility housing not fewer than six and not more than 16 persons receiving custodial care shall be classified as Group R-4.”(emphasis added). To enable and empower people,primarily those with disabilities,to lead healthy and enriched lives. Gregory Sorrentino,President &Chief Executive Officer Brian T.Cregin,CPA,Chief Operating Officer »Mate A.Antonucci,Esq.,General Counsel 22 Corporate Woods Boulevard +Allbany,New York 12211 «Telephone 518.437.5700 «Fax $18:437.0837 + www cfdsnv.org A‘ Mr.Dave Hatin March 19,2020 Page 2 As you know,Prospect Center’s proposed residential respite has eight bedrooms (and will have a certified overnight capacity of eight)that will serve adults and children with developmental, intellectual and/or physical disabilities under the auspices of the New York State Office for People With Developmental Disabilities (*OPWDD”).Based upon the plain language of Section 308.3,the proposed residential respite does not meet a threshold requirement for an Institutional Group I-1 occupancy because it is not a building or structure for more than 16 persons (staff excluded)to reside on a 24-hour basis.Accordingly,applying the express and mandatory language of Section 308.3.3,Prospect Center’s proposed residential respite must be classified as, a Group R-4. With respect to your invocation of an alleged lack of any restriction of the mental or physical disability on the clients that can occupy this structure,first,this is not a pertinent consideration for determining the applicable classification under Group I-1 or Group R-4.Neither Section 308.3 nor Section 310.6 speak to any such restriction or consideration. Second,as noted above,the individuals to be served in proposed residential respite will be restricted to adults and children with developmental,intellectual and/or physical disabilities under the auspices of OPWDD.In other words,only those individuals with qualifying diagnoses or conditions as defined in Section 1.03(22)of New York Mental Hygiene Law who receive services from OPWDD will be served in Prospect Center’s proposed residential respite. We trust that the foregoing provides clarification regarding the proposed residential respite.If necessary,we are willing to schedule a call to discuss this matter further.In the meantime,if you have any questions,or require additional information,please do not hesitate to contact me at 18)944-2103, We sincerely hope to amicably resolve this matter,but we must reserve all rights in law,equity or otherwise if we are unable to do. We look forward to hearing from you. Sincersly~LAoPCVea eneral Counsel c:John Van Oort (via e-mail only) Sue Finan (via e-mail only) Product Information Sheet DUPONT 1 cc. -0 \01- 12020 DuPontTM ThermaxTM Sheathing Nonstructural, Glass-Fiber-Infused Rigid Polyiso Insulation FEATURES/BENEFITS Description Ease of Installation DuPont-Thermax'"Sheathing*is a non-structural,rigid board Thermax'"Sheathing: insulation consisting of a glass-fiber-infused polyisocyanurate Eliminates the extra step of installing a membrane or foam core laminated between 1.0 mil smooth, reflective building wrap aluminum facers on both sides.The glass-fiber reinforcement Can be installed on walls and ceilings while exposed to the contributes to improved fire performance and dimensional interior without any thermal barrier stability. Contains UV-stable technology-can remain uncovered Thermax"'Sheathing also offers high,long-term thermal up to six months resistance,with facers that help prevent water and water vapor • Reduces the potential for condensation within the wall intrusion into the insulation foam allowing it to stabilize at a assembly higher R-value*.In ifs- ermax - eat ing C ii15p.. . • Is lightweight-easy to cut, handle and install installed exposed 23i clipLii1 iiB os ri bout a thermal ba riero U ed- in-.injunction wit-t-e appropria e join closure y tern-for the Available Sizes application,Thermax'"Sheathing-with its low perm rating-can Sizes,R-values and edge treatment options for ThermaxC' help to reduce moisture condensation within and behind Sheathing can be found in Table 1.Contact your local sales the insulation. representative for additional sizes. TABLE 1:Sizest11,R-Values And Edge Treatments For Thermax"Sheathing Nominal Board Thickness(in.) Thermal Properties Board Size Availability Edge Treatment US Canada in) mm) R-Value° Rsi US(ft) Canada(mm) 0.50 3.3 0.58 4 x 8 1220 x 2440 Square Edge 0.75 5.0 0.88 4 x 8 1220 x 2440 Square Edge 1 6.8 1.14 4 x 8 1220 x 2440 Square Edge 1.5 9.8 1.73 4 x 8 1223 x 2440 Square Edge,Shiplap 1.55 39 10 1.78 4 x 8 1224 x 2440 Square Edge,Shiplap 2 51 13.0 2.29 4 x 8 1225 x 2440 Square Edge,Shiplap 2.5 64 15.8 2.78 4 x 8 1226 x 2440 Square Edge,Shiplap 3 76 18.6 3.28 4 x 8 1227 x 2440 Square Edge,Shiplap 3.5 89 21.3 3.75 4 x 8 1228 x 2440 Square Edge,Shiplap 4 102 24.0 4.22 4 x 8 1229 x 2440 Square Edge,Shiplap 4.25 108 26 4.49 4 x 8 1230 x 2440 Square Edge,Shiplap l'i Contact your DuPont seller for information at different R-values and other sizes and lead time requirements.Not all product sizes are available in all regions. laThermax Brand insulation has a higher R-Value at lower temperatures.At 40°F mean temperature and P'board thickness,R-Value is 6.6,and for 2"board thickness,R-Value is 13.2. 5iAdditional2.8 reflective R-Value can be claimed when the air space is at least 0.75"and in conformance with requirements in ASHRAE Fundamentals Handbook. Pi Conditioned thermal values were determined by ASTM C518 at 75°F mean temperature.Test specimens were conditioned in accordance with procedures outlined in ASTM C1289,Section 11.1.2.1. Sustainable Solutions Thermax'"Sheathing is manufactured from 100%renewable power and has a zero ozone depleting potential and negligible global warming potential.The use of Thermax"'Sheathing helps reduce the carbon footprint of commercial buildings and can contribute to LEED Credits. Thermax"Sheathing is a former product of The Dow Chemical Company. PROPERTIES DuPont"Thermax"Sheathing exhibits physical properties as indicated in Table 2 when tested as represented. Review all instructions and(Material)Safety Data Sheet((M)SDS) before use. Please contact DuPont at 1-866-583-2583 when additional guidance is required for writing specifications that include this product. TABLE 2:Physical Properties of Thermax"Sheathing Properties US(per ASTM C1289) Canadian(per CAN/ULC S704) Test Method Values Test Method Values Compressive Strength ASTM D1621 25 psi min ASTM D1621 170 kPa Flexural Strength ASTM C203 40 psi min ASTM C203 275 kPa min Thermal Resistance ASTM C518 see table) ASTM C518 see table) Tensile Strength ASTM D1623 24 psi min. ASTM D1623 170 kPa min Dimensional Stability ASTM D2126 0.2%max ASTM D2126 0.2%max Water Absorption ASTM C209 0.1 max ASTM D2842 3.5 max Water Vapor Transmission ASTM E96 a 0.04 perm ASTM E96 15 ng/Pa-s-m2 Bu ai a onagNitogel•5 tear boo °ram ` m0 " ' Q CAN/ULC 5102 30 ape pr ead Jcola - Pop. 450 Vertical compressive strength is measured at 10 percent deformation or at yield,whichever occurs first. Calculated flammability values for this or any other material are not intended to represent hazards that may be present under actual fire conditions. TESTING Applicable Standards Notice Thermax"Sheathing meets ASTM C1289-Standard Thermax"Sheathing complies with the following codes: Specification for Faced Rigid Cellular Polyisocyanurate ASTM E2178 Standard Test Method for Air Permeance of Thermal Insulation Board,Type I,Class 2 and CAN/ULC S704-11. Building Materials-leakage rates less than 0.001 L/s/m2 at Applicable standards include:a test pressure of 75 Pa. C203-Standard Test.Methods for Breaking Load and Flexural • ASTM E283 Standard Test Method for Determining Rate of Air Properties of Block Type Thermal Insulation Leakage through Exterior Windows,Curtain Walls,and Doors C209-Standard Test Methods for Cellulosic Fiber Insulating under specified Pressure differences across the specimen. Board Results were<0.02 L/s/m2 C518-Standard Test Method for Steady-State Thermal ASTM E2357 Standard Test Method for Determining Air Transmission Properties by Means of the Heat Flow Meter Leakage of Air Barrier Assemblies-no leakage Apparatus ASTM E331 Standard Test Method for Water Penetration of D1621-Standard Test Method for Compressive Properties of Exterior Windows,Skylights, Doors,and Curtain Walls by Rigid Cellular Plastics Uniform Static Air Pressure Difference-no leakage D2126-Standard Test Method for Response of Rigid Cellular • 2018,2015,2012,2009 and 2006 International Residential Code Plastics to Thermal and Humid Aging IRC)Section 316 I2 '_inter tto L im ild"n a CodeD2842-Standard Test Method for Water Absorption 018, o b0 009 W of Rigid Cellular Plastics Section 26OC._ E96-Standard Test Method for Water Vapor Transmission NBCC 9.25.2.2 of Materials ICC-ES ESR-1659 D1623-Standard Test Method for Tensile and Tensile CAN/ULC S704-03/11 Adhesion Properties of Rigid Cellular Plastics CCMC listing 08433-L FM 4880-Wall-Ceiling Construction Metal-Faced-Class 1 Fire Rated to Max.30'Exposure High,4.25"Thick,4'Wide, When Installed as Described in the Current Edition of FMRC Approval Guide.Contact Dupont Technical Support for most current FM 4880 attachment requirements. FM 4450 Approval Standard for Class 1 Insulated-Steel judgement reports Deck Roofs FMVSS No.302-Flammability of Interior Materials- Thermax'"products are covered under Underwriters Passenger Cars,Multipurpose Passenger Vehicles,Trucks and Laboratories Inc.(UL)File R5622 Buses(Docket No.3-3; Notice 4) UL 1256-Fire Test of Roof Deck Constructions, Roof Deck Miami-Dade NOA 02-0703.02 Interior Insulation on CMU Block Construction No.120 and No.123 Miami-Dade NOA 02-0703.03 Insulated Wall Class A UL 723(ASTM E84)Surface Burning Characteristics Miami Dade NOA 02-0703.05 Insulated Roof Assembly ASTM of Building Materials E283 Standard Test Method for Determining Rate of Air Leakage The following designs are 1,2,3 or 4•hour wall rated through Exterior Windows,Curtain Walls,and Doors under assemblies as listed in the UL Fire Resistance Directory:specified Pressure differences across the specimen.Results U026,U326,U330,U354,U355, U424,U425,U460,U902, were<0.02 L/s/m2 U904,U905,U906,U907,V454,V482,V499 Contact your DuPont sales representative or local authorities Fire Performance Evaluation of an Exterior Masonry Wall for state and local building code requirements and related System Incorporating Thermax"'Insulation Tested in acceptances. Accordance With NFPA 285,2019,2018,2015,2012,2009 and 2006 Editions(UBC 26.9,intermediate scale-multistory Warranty testing) In the USA a 15 year thermal warranty is available. NFPA 285 compliant when installed as part of exterior Visit building.dupont.com/warranties or contact your DuPont wall assemblies in ICC-ES ESR-1659 or valid engineering HANDLING WARNING:For Professional Use Only-Read and follow the entire Handling section and the Safety Data Sheets(SDSs,formerly MSDSs or Material Safety Data Sheets)carefully before use.The information below is designed to protect the user and allow for safe use and handling of Thermax'"Brand products.Follow all applicable federal,state,local and employer regulations. Precautionary Statements Disposal In Canadian construction,Thermax"Sheathing exposed Dispose of any residual Thermax"Brand product,coated debris, to the interior must be covered with a thermal barrier. or solvent in accordance with applicable federal,state,and Thermax"Brand products should be used only in strict local government regulations. accordance with product application instructions. Thermax"Brand products,when used in a building containing combustible materials,may contribute to the spread of fire. For more information,consult MSDS and/or call DuPont at 1-866-583-2583. SOU NT For more information visit thermaxwallsystem.com or call 1-866-583-2583 NOTICE:No freedom from any patent owned by DuPont or others is to be inferred.Because use conditions and applicable laws may differ from one location to another and may change with time, Customer is responsible for determining whether products and the information in this document are appropriate for Customer's use and for ensuring that Customer's workplace and disposal practices are in compliance with applicable laws and other government enactments.The product shown in this literature may not be available for sale and/or available in all geographies where DuPont is represented. The claims made may not have been approved for use in all countries or regions.DuPont assumes no obligation or liability for the information in this document References to"DuPont"or the"Company" mean the DuPont legal entity selling the products to Customer unless otherwise expressly noted.NO EXPRESS WARRANTIES ARE GIVEN EXCEPT FOR ANY APPLICABLE WRITTEN WARRANTIES SPECIFICALLY PROVIDED BY DUPONT.ALL IMPLIED WARRANTIES INCLUDING THOSE OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY EXCLUDED.The buyer assumes all risks as to the use of the material.Buyer's exclusive remedy or any claim(including without limitations,negligence,strict liability,or tort)shall be limited to the refund of the purchase price of the material.Failure to strictly adhere to any recommended procedures shall release DuPont Specialty Products USA,LLC or its affiliates,of all liability with respect to the materials or the use thereof.The information herein is not intended for use by non-professional designers,applicators or other persons who do not purchase or utilize this product in the normal course of their business. CAUTION:This product is combustible.Protect from high heat sources.A protective barrier or thermal barrier may be required as specified in the appropriate building code.For more information,consult Material)Safety Data Sheet((M)SDS),call DuPont at 1-866-583-2583 or contact your local building inspector.In an emergency,call 1-989-636-4400 in the U.S.or 1-519-339-3711 in Canada. WARNING:Rigid foam insulation does not constitute a working walkable surface or qualify as a fall protection product. Building and/or construction practices unrelated to building materials could greatly affect moisture and the potential for mold formation.No material supplier including DuPont can give assurance that mold will not develop in any specific system. DuPont",the DuPont Oval Logo,and all trademarks and service marks denoted with TM,5"or o are owned by affiliates of DuPont de Nemours,Inc unless otherwise noted.©2019 DuPont 43-D100094-enNA-0619 CDP Fi r e M a r s h a l ’ s O f f i c e P h o n e: 518-761-8206 F a x: 518-745-4437 firemarshal@queensbury.net www.queensbury.net FIRE MARSHAL’S OFFICE Town of Queensbury 742 Bay Road, Queensbury, NY 12804 PLAN REVIEW UCP Respite Care Facility Aviation Road CC-0109-2020 3/17/2020 The following list is based on a drawing review, with an I-1 classification. Verify operation of and location exit / Emergency lighting. Lock / latches shall comply with Chapter 10 of 2015 IBC Verify all electrical and panels closed up and properly labelled Verify fire extinguisher locations and current inspection. Add Knox Box at main entrance Carbon Monoxide detection is required throughout Truss ID signage required Verify aisles and paths of egress Provide required egress signage in each sleeping unit Provide kitchen appliance schedule FIRE ALARM – Provide complete system layout drawings Provide copy of NYS license for contractor Provide spec. sheets for all Provide external H/S over FDC, to activate on all fire alarms Central station monitoring required NFPA 72 completion report will be required FM witness test required H o m e o f N a t u r a l B e a u t y … A G o o d P l a c e t o L i v e ” Fi r e M a r s h a l ’ s O f f i c e P h o n e: 518-761-8206 F a x: 518-745-4437 firemarshal@queensbury.net www.queensbury.net Sprinkler System FDC connection shall be 5” Storz NFPA 13R acceptable Provide complete system layout drawings with hydraulic calcs. NFPA 13 letter of compliance required Generator Provide specifications for generator and details of its intended function Acceptance report required from contractor Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net 3 REScheck Software Version 4.6.5 Compliance Certificate ___,T=11 W Wy -———|||FILE COPY Project New Respite Care Facility | MAR 11 2020 Energy Code:2015 1ECC | Location:Glens Falls,New York ———— Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:4,123 ft2 295.18-.1-73 €C-0109-2020 Glazing Area 10%United Cerebral Palsy Association Climate Zone:6 (7635 HDD)Respite Care Facility Permit Date:160 Aviation Rd Permit Number:New Commercial Bldg 5295 sf Construction Site: 1160 Aviation Road Queensbury,NY 12804 Owner/Agent: Tim Bartiett Tri Counties,inc. 22 Corporate Woods,5th Floor Albany,NY 12211 518)680-1869 United Cerebral Palsy Assoc of the Designer/Contractor: John Van Oort Studio Seven Architects PO Box 16364 Albany,NY 12212 518-869-7800 john.vanoort@studiosevenarchitect s. comEeeComplisnce:1.4%Better Than Code Maximum UA:348 Your UA:343 The %Belter or Worse Than Code index reflects how close to compllance the house ls based on code trade-of rules IRGOES NOT provise an estimate of energy use of cos relative toa minmum-code home vel Assembly Sore Craw!1:Solid Concrete or Masonry Wall height:4.7" Depth below grade:4.0" Insulation depth:4.7° Wall 1:Wood Frame,16*0.c. Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E Window 3:VinyliFiberglass Frame:Double Pane with Low-E Window 4:Vinyl/Fiberglass Frame:Double Pane with Low-E Wall 2:Wood Frame,16"0.¢ Window 5:Vinyl/Fiberglass Frame:Double Pane with Low-E Wall 3:Wood Frame,16"0.c. Wall 4:Wood Frame,16°0.c Window 6:Vinyl/Fiberglass Frame:Double Pane with Low-E Window 7:VinylFiberglass Frame:Double Pane with Low-E Window 8:Vinyl/Fibergiass Frame:Double Pane with Low-E Project Title:New Respite Care Facility Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Admin\Energy Report.rck Sa eo eS Report date:02/27/20 Page 1 of10 Cerpe NimasvetaaeadWindow9:VinylFiberglass Frame:Double Pane with Low-E Door 1:Glass Wall 5:Wood Frame,16"0. Wall 6:Wood Frame,16"0. Window 10:Vinyi/Fiberglass Frame:Double Pane with Low-E Wall 7:Wood Frame,16"0. Window 11:Vinyi/Fiberglass Frame:Double Pane with Low-E Window 12:VinylFibergiass Frame:Double Pane with Low-E Window 13:Vinyl/Fiberglass Frame:Double Pane with Low-E Window 14:Vinyiibergiass Frame:Double PanewithLow- E Wall 8:Wood Frame,16"o.c Window 15:VinyliFibergtass Frame:Double Pane with Low-E Wall 9:Wood Frame,16"o.c Wall 10:Wood Frame,16"o.c. Window 16:Vinyiibergiass Frame:Double Pane with Low-E Window 17:Vinyl/Fiberglass Frame:Double Pane with Low-E Window 18:Vinyl/Fiberglass Frame:Double Pane with Low-E Side Lite:Glass Door 3:Solid Wall 11:Wood Frame,16"0. Wall 12:Wood Frame,16"o.<. Window 19:Vinyl/Fiberglass Frame:Double Pane with Low-E Celling 1:Raised or Energy Truss uw 03003 2B 0250 «6 a 210 0.0005721232100000576 3 0300 4 675 21.0 0.0©0057-36 1B 0300 4 B 0300 4 a 0300 3 1B 0300 4 123-210 00 00576 B 03004e2100000573 288 21.0 0.0 0.05712 B 0300 4 B 0300 4 3 0300 4 7 02502 2B 01704 61 210 00 00573 123-210 00 ©0057 6 B 0300 4 4123 19.0 30.00.0202 Compliance Statement:The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in aeScheck version 45:5 ante comply wen the mandatory requirements sted inf Bgsphect Inspection Checklt Ton)T,Afe eeurrcet GaWe-T.2[27/2020asignatureDat New Respite CareFacilityProjectTitl Data filename: Admin\Energy Report.rck Report date:02/27/20 Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Page 2 of 10 REScheck Software Version 4.6.5 Inspection Checklist Energy Code:2015 IECC Requirements:41.0%were addressed directly in the REScheck software Text in the "Comments/Assumptions"column is provided by the user in the REScheck Requirements screen.For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table Is provided. Section |T T GP"|Prenapeconmannevew Mong rtind Fe Yonied compe?_commentsAesumptionksaie|eneqo,sash vate[103.1,Construction drawings and Cicompties Requirement will be met. 103.2.documentation demonstrate Oboes Not[PRI energy code compliance for the Not observebllildingenvelThermalsservable8eongngorvelape.GotApplicableenveloperepresentedon construction documents.---/ 103.Construction drawings and complies 103.2,documentation demonstrate OpoesNot403.7’energy code compliance for IPR3P lighting and mechanical systems.ChNot Observable le Systems serving multiple Oot Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions._ 1,Heating and cooling equipment is Heating:Heating:complies sized per ACCA Manual S based —_Btu/hr.Btu/hr.Ooes Not gn loads calculated per ACCA Cooling Cooling NotobservableManual|or other methods Btu/hr Bturhr Cnetapotcanieapprovedbythecodeofficial. Additional Comments/Assumptions: 1 |High Impact (Tier 1)|2 [Medium Impact (Tier 2)3 |Low Impact (Tier 3) Project Title:New Respite Care Facility Report date:02/27/20 Data filename:C:\Users\Customer\Dropbox\CFOS Project\Aviation Road Facility\Construction Page 3 of10 Admin\Energy Report.rck Section |T Plans Verified Comments/AssumptionsPeiancoraneo|aeoo402.2.11 Unvented crawl space wall Re Cicomplies FO7}insulation R-value.Ro Ro OboesNot8(NotObservabletoooiGinotAppticable303.2 Unvented crawl space wall complies Fos}*insulation installed per Oboes Not Unvented crawl space c See the Envelope Assemblies able for values Requirement will be met. OiNot Applicable at inuous complies fFO8K "vapor reterderinstaled over Oboes Not exposed earth,joints overlap= by6in. and sealed,extending at Eset cnsarvabte least6in. up and attached to the INot Applicable all 402.211 Unvented crawi space wall in in Tcomplies FO10}!insulation depth of burial or CdoesNotdistancefromtopofwalCotObservable 303.2.1 Aprotective covering is installed es[FO11?to protect exposed exterior insulation and extends@aminimumof6in.below grade.Not Observable id BiNot Applicable 403.9 Snow.and icemelting system[ FOI2P controls instalies 8 (Not Observable ONot Applicable Requirement will be met. See the Envelope Assemblies table for values. Requirement will be met. Additional Comments/Assumptions: 1 [High impact (Tier 1)2[Medium impact (Tier 2)[3 [Low impact (Ti ier 3) 02/27/20ProjectTitle:New Respite Care Facility Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Admin\Energy Report.rck Report dat Page 4 of 10 I Section |# Framing /Rough-In Inspection Req.ID |a' 402.1.1,Door U-factor. 402.34( FRI @ 1402.1.1,Glazing U-factor (area-weighted 4023.1,average). 402.33, 4025 TRIP 303.13 U-factors FRA!are determined in accordance with the NERC test procedure or¥ taken from the default table. 402.4.1.1 Air barrier and thermal ba FR23}"”installed per manufacturer's instructions.e 402.4.3 Fenestration that is not site built FR20}'is listed and labeled as meeting AAMA WWDMAICSA 101/15.2/A440 or has infitration rates per NFRC 400 that do not exceed code limits. 402.45 IC-rated recessed lighting fixtures FRI6}?sealed at housingjinterior finish and labeled to indicate 2.0 cfm leakage at 75 Pa. 403.3.1 Supply and return ducts in attics TFRI2}!insulated >=R-8 where duct is° hes in diameter and >= R-6 where <3 inches.Supply and return ducts in otherportthebuildinginsulated>= diameter >: for <3inchesindi13.5 Building cavities are not used as TFRISP ducts or plenums. 403.4 HVAC piping conveying fluids FRL7?above 105 #F or chilled fluids below 55 $F are insulated to 2R-- 3 403.4.1 Protection of insulation on HVAC FR24?piping. 4035.3 Hot water pipes areinsulated to FRIBP =R-3, 2| Automatic or gravity dampers are Installed on all outdoorairintakesandexhausts. 403.6 FRISP. Plans Verified Value Field Verified Value Complie: Cicompiies Cdees not Not Observable Ovot Applicable compliesOdeesNot NotObservableOotApplicable compliesoesNot NotObservablenotApplicable ClcompliesdoesNot NotObservablenotApplicable Cicomplies Oboes Not Not Observable Onot Applicable CicompliesCoesNot CiNot Observable Giniot Applicable O complies‘ does Not Not Observable Cinot Applicable complies Oboes Not Not Observable compliesCdoesNot Not Observable GNot applicableTTGcompliesCdoesNot notObservableNotapplicable Cicomplies Cboes Not Not Observable Gcompt Cdoes Not Not Observable Cinot Applicable _ Oot Applicable not Applicable Comments/Assumptions See the Envelope Assemblies table for values See the Envelope Assemblies table for values. Requirement will be met. Requirement will be met. Requirement will be met. Requirement will be met. 2 [High impactier)[2 [Medium impact (Tier 2) Project Title:New Respite Care Facility Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Admin\Energy Report.rck 3 [Low impact (Tier 3)| Report date:02/27/20 Page 5 of10 Additional Comments/Assumptions: 1 [High impact(ier 1)[2.[Medium impact (Tier2)|3 [Low Impact(Tier3)| Project Title:New Respite Care Facility Report date:02/27/20 Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Page 6 of 10 Admin\Energy Report.rck Plans Verified |Field Verified+Insulation Inspection ValueValuephat303.1 All installed insulation is labeled INI3P°or the installed R-values o provided, Wall insulation R-value.Ifthis is a R-Re 2'5,mass wall with at least %of the)Wood ClWoos4022.6 wall insulation on the wall E]Mass [MassTINS]exterior,the exterior insulation Steer Oo steel @ requirement applies (FR10), 303.2 Wall insulation is installed per‘ Na manufacturer's instructions. Additional Comments/Assumptions: T[Migh impact (Tier 1)[2 [Medium impact (Tier 2) Project Title:New Respite Care Facility Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Admin\Energy Report.rck 2) 3[Low impact (Tier 3) Complies?|Comments/Assumptions Cicomplies Requirement will be met. Dpoes Not NotObservableNotapplicable Cicomplies See the Envelope Assembles Cbece net «table forvatues NotObservableNotapplicable Ocomplies:Requirement will be met. Oboes Not Not Observable GiNot Applicable Report date:02/27/20 Page 7 of10 Section |Plans Verified FieldVerifiedbabes|vee [ae402.1.1,Ceiling insulation R-value.R R. og (1 Wood (Wood aoeae Ol steel Ol steel Fay 303.1.1.1,Ceiling insulation installed per 303.2"manufacturer's instructions. iF2)"Blown insulation markedevery300% 402.23 Vented attics with air permeable FI22P insulation include baffle adjacent to soffit and eave ventsthatextendsoverinsulation. 402.2.4 Attic access hatch and door F3}*insulation 2R-value of the adjacent assembly. 402.4.1.2 Blower door test @ 50 Pa.<:ACH 50 = FIL7yP ach in Climate Zones 1-2,and Sa3'ach in Climate Zones 3-8. 4033.4 Duct tightness test result of <=4 ___cfm/100 efmvi00 Flay cfm/100 ft2 across the system or ft?fe 3 cim/100 fe2 withoutairhandler@25Pa,For rough tests,verification may need to occur during Framing inspection.403.3.3 Ducts are pressure tested to cfm/i00 efmi00 Fi27}!determine air leakage with ew ® either:Rough in test:Total leakage measured with 2 pressure differential of 0.1 inch fg,across the systemincludingthemanufacturer's air handler enclosure if installed at time of test,Postconstruction test:Total leakage measured with > pressure differential of 0.1 inch tg,across the entire system including the manufacturer's alr handler enclosure. 403,3.2.1 Air handler leakage designated[ i2é}?by manufacturer at <=2%of design airflow 403.4.1 Programmable thermostats Ae fk FIOP installed for control ofprimaryheatingandcoolingsystemsand intially set by manufacturer to code specifica “aie403.1.2 Heat pump thermostat installed FILO ‘on heat pumps. 4035.1 Ci FILIP systems have automaticoraccessiblemanualcontrols, Complies? Not Observable CONot Applicable complies Odoes Not NotObservablenotApplicable compliesdoesNot Not Observable ONot Applicable compliesOboesNot NotObservableBotapplicable compliesCboesNot NotObservablenotApplicable compliesCoesNot Not Observable ONot Applicable compliesOboesNot NotObservablenotapplicable compliesdoesNot NotObservableOctapplicable ClcompliesdoesNot NotObservableOctapplicable compliesOboesNot Not Observable Not Applicable compliesOboesNot CiNotObservableCntApplicable Requirement will be met. Comments/Assumptions See the Envelope Assemblies able for values. be met. Requirement will be met. Requirement will be met. High impact (ier 1)|[B [low impact(Tier 3) Project Title:New Respite Care Facility Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Constru Admin\Energy Report.rck Report date:02/27/20 Page 8 of 0 Section |Fura verted |Fel voraa |T|Final inspection Provisions cempiens|teotmanieisaliniaesiesNaeotvamos|camels?|Contre} 403.6.1 All mechanical ventilation system Ocomplies FI25F fans not part of tested and listed Opoes Notvsequoeremeetcacyhetorsevabe ne e Gai arches re beau se ates Not Applicable 403.2 Hot water boilers supplying heat Cicomplies FI26?through one-or two-pipe heating Oboes Not systems have eutdoorsetbock contro!to lower boiler water Not Observable temperature based on outdoor Oot Applicable 4035.1.Heated water drculation systems ~Clcomples F287?have a circulation pump.The OboesNotsystemreturnpipeisadedicated; return pipe or a cold water supply {CINot Observable Pipe.Gravity and thermos-Ont Applicable Syohon circulation systemsarenotpresent.Contras for Circulating hot water system pumps start the pump with signal for hot water demand within the ecupancy.Controls sutomatically turn off thepumpnenwaterIsincirculationloop is at setpoint temperature and no demand for hot water exists 403.5.1.2 Electric heat trace systems iComplies FI29P comply with IEEE 515.1 or UL OboesNotia'eamvelsanataaajteergyptthe ne Observable heat tracing to maintain the CNet Applicable Seared ater tempeaturteonsmnt:ee .a|403,5.2 Water distribution systems that complies } FI30F have reclrculat tion bumps that oes Not Paty eater for shed eter Bapuy ipe Sock tothe ested not obsevati water source through a cold INot Applicable water supply pipe have aScondeeswaterSystePapsRavecontSfatinanageparatepuneandiretemperateBREaterenringtecele wove angsea4035.4 Drain water heat recovery units,~Ocomplies FI31?tested in accordance with CSA Oboes Not 855.1,Potable water-side pressure loss of drain water heat EINor Observable recovery units <3 psi for INot Applicable individual units connected to one fr two showers.Potable water- side pressure loss of drain water heat recovery units <2 psi for individual units connected to ~ Ccompiies fixtures oF 7596 of permanent Clboes Not fixtures have high efficacy lamps °. Does not apply to low-voltage CNet Observabl lighting,Cnot Applicable Fuel gas lighting systems have co Cicomplies F123 —_no continuous pilot light.Oboes Not e [NotObservableotApplicable pact (Tier)[2 [Medium impact(Tier 2)|3 [Low impact (Tier 3) Project Title:New Respite Care Facility Report date:02/27/20 Data filename:C:\Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Page 9 of 10 Admin\Energy Report.rck Section J"|Final inspection Provisions|Plans Verified|Field Verified |Comp|& Req.ID|i ci Ora tate |401.3 Compliance certificate posted.Ocomplies cFI7P Oboes Not NotObservableiisaoeONotApplicable303.3 ‘Manufacturer manuals for Ccomplies F118 mechanical and water heating OboesNotSelenahovebeenprovidedAOUNeOiNotApplicable Comments/Assumptions Requirement will be met. Additional Comments/Assumptions: a [HighimpactTier 1) ityProjectTitle:New Respite Care Fa Data filename: Admin\Energy Report.rck 2i]Medium impact (Tier2)[3[Low impact (Tier Users\Customer\Dropbox\CFDS Project\Aviation Road Facility\Construction Report date:02/27/20 Page 10 of10 N 2015 IECC Energy Efficiency Certificate Insulation Rating Card Above-Grade 21.00 Below-Grade Wall 14,00 Floor 0.00 Ceiling /Roof 49.00 Ductwork (unconditioned spaces): Ce eraser)eared sHGc Window 0.30 Door 0.17 Becueeecraecat Sree Heating System:. Cooling System: Water Heater: Name:Date: Comments FILE COPY THERMAX™Heavy Duty Insulation 4.PRODUCT NAME THERMAX"Heavy Duty Insulation 2.MANUFACTURER The Dow Chemical Company Dow Building Solutions 200 Larkin Midland,MI 48674 11866-583-BLUE (2583) Fax 1-989-8324465 www:thermaxwallsystem.com 3.PRODUCT DESCRIPTION THERMAX"Heavy Duty Insulation consists of a glassfiberreinforced polyisocyanurate foam core faced with nominal 4 mil embossed white thermoset coated aluminum on one side and 1.25 mil embossed aluminum on the other.It can be installed exposed to the interior without a thermal barter. THERMAX"Heavy Duty offers high,long- term R-value’.The facers help prevent water and water vapor intrusion into the insulation foam,and allow the foam to stabilize at a higher Revalue.Used in conjunction with the appropriate joint closure system for the application, THERMAX™Heavy Duty Insulation with its low perm rating helps to reduce moisture condensation within and behind the insulation, Basic Use THERMAX"Heavy Duty is designed as an insulation and interior finish system for walls and ceilings in metal,wood post frame,and concrete or masonry buildings, 4s governed by building codes.The tough 4 mil white embossed aluminum surface of THERMAX"Heavy Duty makes ita durable insulationjfinish choice for use in moderate-impact areas,and it can be pressure-washed up to 2,000 psi with a IS-degree or greater spray tip (at 3° minimum distance).Maximum length is 30 fe.(9:1 m)and a maximum thickness of 3 inches (762 mm). 4.TECHNICAL DATA Applicable Standards THERMAX™Heavy Duty meets ASTM 1289 ~Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board,Type f,Class 2. Applicable standards include: C203 ~Standard Test Methods for Breaking Load and Flexural Properties, of Block-Type Thermal insulation 209 ~Standard Test Methods for Cellulosic Fiber Insulating Board C518 —Standard Test Method for Steady- State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus 1621 Standard Test Method for Compressive Properties of Rigid Cellular Plastics 2126 -Standard Test Method for Response of Rigid Cellular Plastics to Thermal and Humid Aging 96 Standard Test Method for Water Vapor Transmission of Materials D1623 —Standard Test Method for Tensile and Tensile Adhesion Properties, of Rigid Cellular Plastics TABLE 1:Sizes,R-Values And Edge Treatments For THERMAX™Heavy Duty Insulation Nominal Board Thickness (in)Eo 130 Board Size)Se4x8/4 x12 axg/ax ta 4xg/4x12 AxB/AX12 AXB/4%12 Contact you ow sil forivornation at ferent ales ender ses an ead time rquiremanis.Ntal product izes ao mio alrgions." eae means eit to hat flow:The higher the ah the geste the insulating power Stables Rvalee @7S'F aan tempertire determined in accordance with ASTM C516,Reuss expressed in e2sh F/B,STi n cee menses Physical Properties THERMAX™Heavy Duty exhibits the typical properties and characteristics indicated in Table 2 when tested as represented. Environmental Data THERMAX"Heavy Duty is manufactured with a zero ozone depleting potential. The use of THERMAX™Heavy Duty helps reduce the carbon footprint of commercial buildings. Fire Protection THERMAX™products should be used only in strict accordance with product application instructions.THERMAX™products,when used in a building containing combustible materials,may contribute to the spread of fire.For more information,consult MSDS andjor call Dow at 1-866-583-BLUE (2583).In an emergency,call 1989-636-4400, Code Compliances THERMAX™Heavy Duty complies with the following codes: 2009 International Residential Code ORC)Section 316 30°Exposure High,425°Thick,4’Wide, When Installed as Described in the Current Edition of FMRC Approval Guide THERMAX"products are covered under Underwriters Laboratories Inc. UL file R5622 UL 1256 —Fire Test of Roof Deck Constructions,Roof Deck Construction No.120 and No.123 UL723 (ASTM E84)Surface Burning Characteristics of Building Materials The following designs are 1,2,3 or 4 hour wall rated assemblies as listed in the UL Fire Resistance Directory:U026, 1U326,U330,U354,U355,0424,0425, 1U460,U902,U904,L905,U906,U997, vasa,V482,V499 Fire Performance Evaluation of TABLE 2:Physical Properties of pie aetna ysical PropertiesofTHERMAX™ Heavy Duty Insulation Incorporating THERMAX™Insulation Taved in ‘Accordance With NFPA 285,Compressive Strength(t),ASTM D1621,psi,min,|25 2006 Edition (UBC 26.9,intermediate \ ae a tory ane Flexural Strength,ASTM C203,8oUSSNeaoeHeamanshiltyof|Wate:Absorption,ASTM C200,%by volume,max.|on | Interior Materials Passenger Cars,_—|_Weter Vapor Permeance,ASTM E96,pam,max.<0.09 Multipurpose Passenger Vehicles,saximum Use Temperature,“|| Trucks and Buses (Docket No.3-3;| Use Femperatire,F 280 Notice 4)Light Refiectenoe, Vioual Ught Spectrophotometse %|5ContactyourDowsalesrepresentativeorlocalauthoritiesforstateandlocalbuilding code requirements and related acceptances. 5,INSTALLATION 6.AVAILABILITY 9.TECHNICAL SERVICES Boards of THERMAX™Heavy Duty are ‘THERMAX"Heavy Duty insulation is Dow can provide technical information lightweight and can be sawed or cut with manufactured in several locations and isto help address questions when using a knife.They install quickly to walls and distributed through an extensive network.THERMAX™Heavy Duty.Technical personnel Ceilings inside and outside of purlins,For more information,call 180-232-2436.are available to assist with any insulation russes or bar joints.Butt joints must be project.Call $866583-BLUE (2583}. installed over structural members.The 7.WARRANTY surface ofthe insulation at all joints must Fifteen-year limited thermal warranty _—_10,FILING SYSTEMS be continuously sealed with tape or with is available.Contact your Dow ‘www:DowMetalBuilding.com one of Dow's join closure systems.representative for detail.www.dowbuildingsolutions.com ContactalocalDowrepresentativeor‘8 MAINTENANCE. access the literature brary at www.Not applicable owbuildingsolutions.com for more specific instructions. f ines.nGanada or Technical information:‘dowbuildingsolutions.com The Dow Chemical Company Dow Chemical Canada ULC 41-886-583-BLUE (2583)(English) Dow Building Solutions Dow BaiingSabon 4-800-383-6210 (French) 200 Larkin Center ,For Sales Information: Midland,Ml 42674 Clip abTaPsut 1-800-232-2436 (English) 1-800-565-1255 (French) nen reprint nnn geng git nsreyrnaeona,venue eaaneneweaierionaentteane icp Som mn gan»a ina semen tence Doote Sony menentSpeynaarceeponONESSONALMEDOSDOLCRESTORCUNONCSPREEUTEeaoutedalettyenothtnreceitnsteFeeennaSetPUSctowitoanpahavocseshranenpcstegmaetemintamnNeepgerneeehae etme the Dow Oem Canary (Ow)en ied campy tow Fame 04018-0715 COP REVIEWED FOR ENERGY CODE COMPLIANCE COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Of NEW �P RKCM Project Information r Energy Code: 2015 IECC _ Project Title: New Respite Care Facility 160 Aviation Road C9 Project Type: New Construction p° 0829�' �FESSIO�`P� Construction Site: Owner/Agent: Designer/Contractor: 160 Aviation Road Tim Bartlett Fusion Systems Engineering, DPC Queensbury, New York 12804 United Cerebral Palsy Association of 634 Plank Road,Suite 203B the Tri-Counties, Inc. Clifton Park, New York 12065 22 Corporate Woods Blvd 5th Floor 5186210533 Albany, New York 12211 518-703-0549 t_bartlett@cfdsny.org Additional Efficiency Package(s) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts/ft2 Watts 1-First Floor(Multifamily) 4123 0.46 1892 2-Basement(Multifamily) 4123 0.46 1892 Total Allowed Watts= 3785 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp/Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1-First Floor(Multifamily) LED: Fixture A:Other: 1 53 17 922 LED: Fixture D:Other: 1 25 10 250 2-Basement(Multifamily. LED: Fixture C: Other: 1 20 9 172 Total Proposed Watts= 1344 Interior Lighting PASSES: Design 64% better than . .- Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: New Respite Care Facility 160 Aviation Road Report date:_05/05/20 Data filename: Page 1 of 5 FILE COPY � r S COMcheck Software Version COMcheckWeb Exterior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: New Respite Care Facility 160 Aviation Road Project Type: New Construction Exterior Lighting Zone 2 (Residentially zoned area) Construction Site: Owner/Agent: Designer/Contractor: 160 Aviation Road Tim Bartlett Fusion Systems Engineering, DPC Queensbury, New York 12804 United Cerebral Palsy Association of 634 Plank Road,Suite 263B the Tri-Counties, Inc. Clifton Park, New York 12065 22 Corporate Woods Blvd 5th Floor 5186210533 Albany, New York 12211 518-703-0549 t_bartlett@cfdsny.org Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/ Wattage (B X C) Front Entrance(Entry canopy) 208 ft2 0.25 Yes 52 Rear Entrance(Illuminated area of facade wall or surface) 288 ft2 0.1 No 29 Total Tradable Watts(a) = 52 Total Allowed Watts= 81 Total Allowed Supplemental Watts(b) = 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description/ Lamp/Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Front Entrance (Entry canopy. 208 ft2):Tradable Wattage LED: Fixture A: Other: 1 4 18 70 Rear Entrance (Illuminated area of facade wall or surface. 288 ft2): Non-tradable Wattage LED: Fixture B: Other: 1 6 8 48 Total Tradable Proposed Watts= 70 Exterior Lighting PASSES: Design 89%better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 2 of 5 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Re .ID C103.2 ;Plans,specifications,and/or ;❑Complies [PR4]1 calculations provide all information ;❑Does Not with which compliance can be ;determined for the interior lighting ❑Not Observable :and electrical systems and equipment :❑Not Applicable ;and document where exceptions to the standard are claimed.Information !provided should include interior ;lighting power calculations,wattage of; bulbs and ballasts,transformers and ; control devices. C103.2 ;Plans,specifications, and/or I❑Complies ; [PR8]1 :calculations provide all information UDoes Not with which compliance can be ;determined for the exterior lighting ;❑Not Observable :and electrical systems and equipment t]Not Applicable ;and document where exceptions to ; ; ;the standard are claimed. Information ; !provided should include exterior ;lighting power calculations,wattage of ;bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 3 of 5 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions &Req.ID C405.2.1 ;Lighting controls installed to uniformly;❑Complies ; [EL15]1 reduce the lighting load by at least :❑Does Not 50%. ;❑Not Observable ;❑Not Applicable C405.2.1 ;Occupancy sensors installed in ;❑Complies ; [EL18]1 :required spaces. ;❑Does Not ; ;❑Not Observable, ❑Not Applicable C405.2.1, ;Independent lighting controls installed ;❑Complies C405.2.2, per approved lighting plans and all :❑Does Not 3 ;manual controls readily accessible and [EL23]2 ;visible to occupants. UNot Observable ;❑Not Applicable , C405.2.2. ;Automatic controls to shut off all ;❑Complies 1 .building lighting installed in all ;❑Does Not [EL22]2 ;buildings. ,❑Not Observable ;❑Not Applicable C405.2.3 ;Daylight zones provided with ;❑Complies [EL16]2 :individual controls that control the ;❑Does Not ;lights independent of general area lighting. ;❑Not Observable ;❑Not Applicable C405.2.3, ;Primary sidelighted areas are ;❑Complies C405.2.3. :equipped with required lighting ;❑Does Not 1, ;controls.C405.2.3. UNot Observable 2 ; ;❑Not Applicable [EL20]1 C405.2.3, ;Enclosed spaces with daylight area ;❑Complies C405.2.3. under skylights and rooftop monitors :❑Does Not 1, ;are equipped with required lighting C405.2.3. ;controls. ,❑Not Observable 3 :❑Not Applicable ; [EL21]1 ; ; C405.2.4 ;Separate lighting control devices for ;❑Complies [EL4]1 specific uses installed per approved ;❑Does Not ;lighting plans. ;❑ ; , Not Observable;, ;❑Not Applicable C405.2.4 ;Additional interior lighting power ;❑Complies [EL8]1 allowed for special functions per the :❑Does Not ;approved lighting plans and is ; ;automatically controlled and UNot Observable ;separated from general lighting. ;❑Not Applicable ; C405.2.5 ;Automatic lighting controls for exterior;❑Complies [EL25]no0 :lighting installed.Controls will be :❑Does Not ;daylight controlled,set based on ;business operation time-of-day, or ;❑Not Observable reduce connected lighting >30% :[]Not Applicable ; C405.3 ;Exit signs do not exceed 5 watts per ;❑Complies [EL6]1 face. ;❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 12 IMedium Impact(Tier 2) 3 Low impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 4 of 5 Section # Final Inspection Complies? Comments/Assumptions & Re .ID C303.3, Z Furnished O&M instructions for ;❑Complies C408.2.5. "systems and equipment to the :❑Does Not 2 building owner or designated [FI17]3 representative. UNot Observable ;❑Not Applicable , I I I C405.4.1 ;Interior installed lamp and fixture ;❑Complies .;See the Interior Lighting fixture schedule for values. [FI18]1 :lighting power is consistent with what :❑Does Not :is shown on the approved lighting ;plans,demonstrating proposed watts ;❑Not Observable are less than or equal to allowed ;❑Not Applicable ; watts. C405.5.1 :,Exterior lighting power is consistent ;❑Complies ;See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved :❑Does Not ;lighting plans,demonstrating ; ,proposed watts are less than or equal ;❑Not Observable to allowed watts. ;❑Not Applicable ; C408.2.5. Furnished as-built drawings for ;❑Complies ; 1 electric power systems within 90 days []Does Not [FI16]3 �of system acceptance. ;❑Not Observable ❑Not Applicable C408.3 ;Lighting systems have been tested to ;❑Complies [17133]1 ensure proper calibration, adjustment, :❑Does Not ;programming, and operation. ; ❑Not Observable: []Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 5 of 5 ._.. _.. o= .. .. r.... ...w .�.a.�. r .e�:�«_. c. tiw REVIEWED FOR COMcheck Ifit, A. CO CE kWeb Mechanical Compliance .Certificate �Af NEw Project Information C�PQ�lCAM 0� Energy Code: 2015 IECC 7t Project Title: New Respite Care Facility 160 Aviation Road r_ W Location: Glens Falls, New York Climate Zone: 6a 3 °•08290 �C9 Project Type: New Construction Ate. SIO�`P� Construction Site: Owner/Agent: Designer/Contractor: 160 Aviation Road Tim Bartlett Fusion Systems Engineering, DPC Queensbury, New York 12804 United Cerebral Palsy Association of 634 Plank Road,Suite 203B the Tri-Counties, Inc. Clifton Park, New York 12065 22 Corporate Woods Blvd 5th Floor 5186210533 Albany, New York 12211 518-703-0549 t_bartlett@cfdsny.org Additional Efficiency Package(s) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List QuantitySystem Type & Description 1 HVAC System (Single Zone): Heating: 1 each-Central Furnace, Gas, Capacity=40 kBtu/h Proposed Efficiency=96.00%Et, Required Efficiency: 80.00%Et or 78%AFUE Cooling: 1 each-Split System,Capacity= 24 kBtu/h,Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency= 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-1 SUPPLY FAN--Compliance(Motor nameplate HP method) : Passes Fans: FAN 1 Supply,Single-Zone VAV, 805 CFM,0.5 motor nameplate hp, 0.0 fan efficiency grade 1 HVAC System (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity= 60 kBtu/h Proposed Efficiency= 96.30%Et, Required Efficiency: 80.00%Et or 78%AFUE Cooling: 1 each-Split System, Capacity=42 kBtu/h,Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency= 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-2 SUPPLY FAN--Compliance(Motor nameplate HP method) : Passes Fans: F-2 SUPPLY FAN Supply,Single-Zone VAV, 1415 CFM, 0.8 motor nameplate hp,0.0 fan efficiency grade 1 HVAC-System (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=40 kBtu/h Proposed Efficiency=96.50%Et, Required Efficiency: 80.00%Et or 78%AFUE Cooling: 1 each-Split System,Capacity=30 kBtu/h,Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency= 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-3 SUPPLY FAN--Compliance(Motor nameplate HP method) : Passes Fans: F-3 SUPPLY FAN Supply,Single-Zone VAV, 1015 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 1 of 10 FILE COP Mechanical Compliance Statement Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 2 of 10 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Re .ID C103.2 ;Plans,specifications, and/or ;❑Complies [PR2)1 calculations provide all information QDoes Not with which compliance can be ;determined for the mechanical ❑Not Observable systems and equipment and ❑Not Applicable !document where exceptions to the ;standard are claimed. Load calculations per acceptable ;engineering standards and handbooks. Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact.(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 3 of 10 Section # Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. ISnow/ice melting system sensors for ;[]Complies 5, Sfuture connection to controls.Freeze :E]Does Not C403.2.4. t�protection systems have automatic 6 Icontrols installed. ;ONot Observable [FO9]3 ;E]Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 4 of 10 Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Re .ID C404.5, Heated water supply piping conforms ;❑Complies C404.5.1, to pipe length and volume :❑Does Not C404.5.2 t requirements. Refer to section details. ;❑Not Observable [PL6]3 fffff ;❑Not Applicable C404.5, Heated water supply piping conforms ;❑Complies ; C404.5.1, Ito pipe length and volume ;❑Does Not C404.5.2 requirements. Refer to section details. ;❑Not Observable [P.,L6]3, ' ❑Not Applicable C404.5, Heated water supply piping conforms ;❑Complies C404.5.1, to pipe length and,volume ;❑Does Not C404.5.2 requirements. Refer to section details.[PL6]3 ;ONot Observable ; ❑Not Applicable ; C404.6.3 S Pumps that circulate water between a :❑Complies ; [PL7]3 'heater and storage tank have controls T❑Does Not that limit operation from startup to ; <=5 minutes after end of heating :❑Not Observable cycle. ;❑Not Applicable C404.6.3 Pumps that circulate water between a ;❑Complies ; [PL7]3 heater and storage tank have controls :❑Does Not that limit operation from startup to ; <=5 minutes after end of heating ;❑Not Observable cycle. :❑Not Applicable C404.6.3 Pumps that circulate water between a ;❑Complies [PL7]3 heater and storage tank have controls ;❑Does Not that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable Icycle. ;❑Not Applicable C404.7 ')water Water distribution system that pumps :❑Complies [PL8]3 ,water from a heated-water supply :❑Does Not pipe back to the heated-water source through a cold-water supply pipe is a ;❑Not Observable demand recirculation water system. ;❑Not Applicable ; jPumps within this system have ;controls-that start the pump upon receiving a signal from the action of a user of a fixture or appliance and ; 3limits the temperature of the water ,entering the cold-water piping to 104°F. ; C404.7 ;Water distribution system that pumps ;❑Complies [PL8]3 water from a heated-water supply :[]Does Not pipe back to the heated-water source ; through a cold-water supply pipe is a ;❑Not Observable demand recirculation water system. ❑Not Applicable Pumps within this system have controls that start the pump upon ; receiving a signal from the action of a 1 user of a fixture or appliance and ; limits the temperature of the water entering the cold-water piping to ;104°F. ; 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 5 of 10 Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Re .ID C404.7 j Water distribution system that pumps ;OComplies [PL8]3 water from a heated-water supply :ODoes Not pipe back to the heated-water source through a cold-water supply pipe is a ;❑Not Observable demand recirculation water system. Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water 1 entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 6 of 10 section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Re .ID C402.2.6 ;Thermally ineffective panel surfaces of;❑Complies [ME41]3 ;sensible heating panels have ;❑Does Not #insulation >= R-3.5. :❑Not Observable', ❑Not Applicable C403.2.13;Unenclosed spaces that are heated ;❑Complies ; [ME71]2 use only radiant heat. ;❑Does Not ❑Not Observable ❑Not Applicable C403.2.3 ;HVAC equipment efficiency verified. ;❑Complies ;See the Mechanical Systems list for values. [ME55]2 i !❑Does Not ❑Not Observable ❑Not Applicable C403.2.6. ;Demand control ventilation provided ',❑Complies ; 1 :for spaces>500 ft2 and >25 ❑Does Not [ME59]1 ;people/1000 ft2 occupant density and ;served by systems with air side I❑Not Observable economizer, auto modulating outside :❑Not Applicable ; ;air damper control,or design airflow >3,000 cfm. C403.2.6. ;Enclosed parking garage ventilation ;❑Complies 2, has automatic contaminant detection- :❑Does Not [ME115]3 and capacity to stage or modulate fans to 50%or less of design capacity. ;E]Not Observable ❑Not Applicable ; C403.2.7 ;Exhaust air energy recovery on ;❑Complies [ME57]1 ;systems meeting Table C403.2.7(1) ;❑Does Not and C403.2.7(2). ;❑Not Observable ❑Not Applicable C403.2.8 Kitchen exhaust systems comply with ;❑Complies [ME116]3 replacement air and conditioned ;❑Does Not supply air limitations,and satisfy hood! ;rating requirements and maximum ;❑Not Observable *haust rate criteria. ;❑Not Applicable ; C403.2.9 ;HVAC ducts and plenums insulated. ;❑Complies [ME60]2 Where ducts or plenums are installed �❑Does Not in or under a slab,verification may ; ; ;need to occur during Foundation ❑Not Observable !Inspection. ;❑Not Applicable ; C403.2.9 ?Ducts and plenums sealed based on ;❑Complies [ME10]z !static pressure and location. :❑Does Not ;❑Not Observable: ❑Not Applicable C403.2.9. #Ductwork operating >3 in.water ;❑Complies 1.3 ;column requires air leakage testing. U❑Does Not [ME11]3 ;❑Not Observable s ;❑Not Applicable C403.2.9. ;Ductwork operating >3 in.water ;❑Complies 1.3 ;column requires air leakage testing. :❑Does Not [MEll]3 ;❑Not Observable 1 :❑Not Applicable C403.2.9. }Ductwork operating>3 in,water ;❑Complies ; 1.3 column requires air leakage testing. UDoes Not I [ME11]3 ; UNot Observable ❑Not Applicable 11 High Impact(Tier 1) 12 IMedium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 7 of 10 , e Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.4.4. Multiple zone VAV systems with DDC ;❑Complies ;See the Mechanical Systems list for values. 6 of individual zone boxes have static :[:]Does Not [ME110]3 'pressure setpoint reset controls. ❑Not Observable 2 ;❑Not Applicable C403.4.4. Multiple zone VAV systems with DDC ;❑Complies ;See the Mechanical Systems list for values. 6 �of individual zone boxes have static :❑Does Not [ME110]3 pressuresetpoint reset controls. ❑Not Observable ❑Not Applicable C403.4.4. #Multiple zone VAV systems with DDC ;❑Complies :See the Mechanical Systems list for values. 6 of individual zone boxes have static :❑Does Not [ME110]3 }pressure setpoint reset controls. ❑Not Observable ❑Not Applicable C408.2.2. 'Air outlets and zone terminal devices ;❑Complies 1 !have means for air balancing. ;❑Does Not [ME53]3 ;❑Not Observable: ❑Not Applicable C403.5, 'Refrigerated display cases,walk-in ;❑Complies C403.5.1, )coolers or walk-in freezers served by UDoes Not C403.5.2 remote compressors and remote i [ME123]3 #condensers not located in a 1❑Not Observable I condensing unit, have fan-powered :❑Not Applicable ; ;condensers that comply with Sections ; C403.5.1 and refrigeration compressor; ; Isystems that comply with C403.5.2.. 1 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 8 of 10 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M manuals for HVAC ;❑Complies C408.2.5. systems within 90 days of system UDoes Not 3 acceptance. [F18]3 + UNot Observable t❑Not Applicable C403.2.2 ;HVAC systems and equipment ;❑Complies ; [FI27]3 ;capacity does not exceed calculated !❑Does Not j loads. ❑Not Observable ❑Not Applicable C403.2.4. Heating and cooling to each zone is ;❑Complies ; 1 a controlled by a thermostat control. ;❑Does Not [F[47]3 Minimum one humidity control device Not Observable per installed humidification/dehumidification ;❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ;❑Complies, ; 1 controlled by a thermostat control. ;❑Does Not [FI47]3 'Minimum one humidity control device per installed ;❑Not Observable; humidification/dehumidification ;❑Not Applicable ; system. C403.2.4. IHeating and cooling to each zone is ;❑Complies ; 1 controlled by a thermostat control. :❑Does Not [FI47]3 Minimum one humidity control device UNot Observable )per installed humidification/dehumidification Z❑Not Applicable ; system. C403.2.4. #Thermostatic controls have a 5 °F ;❑Complies 1.2 deadband. ;❑Does Not [FI38]3 i :,[:]Not Observable; ❑Not Applicable C403.2.4. ;Temperature controls have setpoint ;❑Complies 1.3 joverlap-restrictions. - :❑Does Not [F[20]3 UNot Observable; ❑Not Applicable C403.2.4. ,,Each zone equipped with setback ;[]Complies2 )controls using automatic time clock or 1❑Does Not [F139]3 {programmable control system. ❑Not Observable 1❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ;❑Complies 2.1, y(heat)and 85°F (cool); 7-day clock, 2- UDoes Not C403.2.4. ;hour occupant override, 10-hour 2.2 ;backup UNot Observable: [F140] :❑Not Applicable 3 ) , 1 C403.2.4. ;Systems include optimum start ;❑Complies 2.3 !controls. ;❑Does Not [F141]3 ; ;❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ;❑Complies 2.3 controls. UDoes Not [FI4,1]3 1❑Not Observable ❑Not Applicable C403.2.4. ;Systems include optimum start ;❑Complies ; 2.3 Icontrols. ;❑Does Not [F141]3 UNot Observable ❑Not Applicable 1 High lmpactffier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 9 of 10 1 , e Section # Final Inspection Complies? Comments/Assumptions &Re .ID C408.2.1 ;Commissioning plan developed by ;❑Complies [FI28]1 registered design professional or :❑Does Not ;approved agency. ❑Not Observable ❑Not Applicable C408.2.3. ;HVAC equipment has been tested to ;❑Complies ; 1 lensure proper operation. :❑Does Not [FI31]1 ;❑Not Observable ❑Not Applicable C408.2.3. ;HVAC control systems have been ;❑Complies 2 jLebLed to ensure proper operation, 1❑Does Not [F110]1 ;calibration and adjustment of controls.1❑Not Observable ❑Not Applicable C408.2.4 ;Preliminary commissioning report ;❑Complies (F129]1 completed and certified by registered !❑Does Not ;design professional or approved ;agency. :❑Not Observable ❑Not Applicable ,C408.2.5. Furnished HVAC as-built drawings ;❑Complies asubmitted within 90 days of system ElDoes Not 1[FI7]3 ?acceptance. ff ;❑Not Observable []Not Applicable C408.2.5. ;An air and/or hydronic system ;❑Complies 3 balancing report is provided for HVAC :❑Does Not [FI43]1 systems. ;ONot Observable ❑Not Applicable C408.2.5. ;Final-commissioning report due to ;❑Complies 4 .building owner within 90 days of :❑Does Not [F130]1 ;receipt of certificate of occupancy. ; ,❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)' Project Title: New Respite Care Facility 160 Aviation Road Report date: 05/05/20 Data filename: Page 10 of 10 KB ENGINEERING&CONSULTING PLLC-DBA KB CONSULTING CIVIL&ENVIRONMENTAL ENGINEERING AND MANAGEMENT Mr.John O'Brien Code Enforcement Officer,Town-of Queensbury 742 Bay Road Queensbury,NY 12804 A Via email to JohnO@queensbM.net October 7,2020 Engineer's Certification of New Septic System Installation— 160 Aviation Road,PN 19025. Dear Mr. O'Brien- This letter is to certify that the construction of the onsite individual underground wastewater treatment and disposal(gravity fed conventional septic) system has been constructed in general conformance with the provisions of the approved design plans.An as-built sketch of the installed system with field measurements is attached for future reference. If you have any questions or require anything further information, do not hesitate to contact me. Best regards, P, t a Kurt Bedore,PE O�OFEgg10NP� KB Engineering& Consulting,PLLC Cc: T. Bartlett,Owner rep,via email J,VanOort,AIA,Architect,via email T,Albrecht, Sr.,Hilltop Construction(GC),via email File PO Box 210, 105 Lakehill Road, Suite 2 Burnt Hills,NY 12027-9432 Cellphone: 518-669-4091 email: kbedore@nycap.rr.ccom