Loading...
RC-0171-2020PRINCIPLE STRUCTURE Office Use Only PERMIT APPLICATION Permit #:_2S ~Ol4\-202,> Town of 7 Permit F 742 Bay Road,Queensbury,NY 12804 *rec.Fee:$_N|fe P:618-761-8256 wwwqueensburynel Invoice #: Project Location:rth Lawe Tax Map #:_QQ6,/9-I-5 3 subdivision ame:Shore Colowy Assoc. TOWN BD.RESOLUTION 86-2013:$850 recreation fee for new dwelling units;-single Tamily-duplex family. multiplefamily,apartments,condominiums,townhouses,and/or manufactured |rail Minds.Wk ake i|{! homes.This is in addition to the permit fee(s)| CONTACT INFORMATION APR 27 2000 Applicant:|7 Name(s):Timotky +Kathleen Bechard _ Mailing Address,C/S/2:_7 Srequors Dy.,Queensbury,WY lepo4 Cell Phone:_(S/$_)260-55 76 land Line:_(578)£22 -71/2. Email:_tpdechard@gmarl com Primary Owner(s): Name(s):Timothy +Keth/eow Sechard Céame as above ) Mailing Address,C/S/Z: Cell Phone:_()Land Line:_(), Email: on -E Check if all work will be performed by homeowner only Contractor(s):Workers’Comp documentation mustbesubmittedwiththisapplicationContractorName(s):_earth Valley Cewstractrow Contractor Trade:___Ex ceyectwug ”Cowciede +Bewere/Cop ructi ow Mailing Address,C/S/Z:_Maple B&F forters orwos,VY 12959 Cell Phone:_(5(@ )Jof-575°Land Line:(5 ) Email:__Adam Crosse Bg macl.com List all additional contractors on the back of this form Architect(s)/Engineer Business Name:_fleicwsKi Hall Arch;tecture Contact Name(s):E¥haw Hal/, Mailing Address,C/s/z:__/34 Dix Ave Cell Phone:_(#8 _)land Line:_(5/8)77/0 268 Email:, Contact Person for Building &Code Compliance:Timethy Bechara! Cell Phone:_(5/8)260-5576 landline:_(.5/¢)£39-7/22 Email:__+p dechay d @ gmail.com Principle Structure Packet Revised February 2019 Contractors):Workers’Comp documentation must be submitted withthisapplication Contractor Name(s):_SY¥ewiert Cowstruction Tae Contractor Trade:Swart Homes +Lewd Mailing Address,C/s/z:_@-0.Box 42 darwt hills WY [2027 Cell Phone:_(57%)857-337 land Line:_(.5/8 )8&5-4570.2 Email:_hjm .Skwert@¢mail.com Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s):__Otfews Concve fe Contractor Trade:Mason ry[cowcrete Mailing Address,C/S/Z:__354 Mei Sf Cell Phone:_(S/?)S 57-8470 landline:(5/8 )“746-0595 Email: Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s):Viele Cow tractiwg Contractor Trade:_Frami wg Mailing Address,C/S/Z: Cell Phone:_(5/8 _)_955-0827 Land Line:_(), Email:__(icle cowtyacting @ Aol.om Contractor(s):Workers’Comp documentation must be submitted with this application Contractor Name(s):again ~Cow struction) Contractor Trade:___oo Fig Mailing Address,C/S/2: Cell Seeae=1660 aenen )Email:_dave gawim &hotmail com Contractor(s):Workers’Comp di emer ist be te with this application Contractor Name(s):Shewevr<awa lev Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()land Line:_() Email:, Contractor{s):Workers’Comp documentation must be submitted with this application Contractor Name(s): Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()Land Line:_() Email: Principle Structure Packet Revised February 2019 PROJECT INFORMATION TYPE:_—Commercial residential WORK CLASS. Arogle Family Two-Family Multi-Family (#of units ___) Townhouse Business Office Retail __Hotel/Motel Industrial Warehouse __Garage(#ofcars _)Other (describe __) STRUCTURE SQUARE FOOTAGE:GARAGE SQUARE FOOTAGE: I floor:727 +22H Porch)i floor,—DIF 2 floor:__196 2 floor 3"floor:<— Total square feet:_SS“ Basement (habitable space): Total square feet:2/7 ADDITIONAL PROJECT INFORMATION: 1.Estimated Cost of Construction:$_3.50,o> 2.Proposed use of the building:__Les /dewee 3.If Commercial or Industrial,indicate the name of the business: 4,Source of Heat:Gas Oil CPropane>Solar Other: Fireplaces need a separate Fuel Burning Appliances &Chimney Application,one per appliance) 5,Are there any structures not shown on the plot plan?YES (0)Explain: 6.Are there any easements on the property?YES 7.SITE INFORMATION: a.What is the dimensions or acreage of the parcel?_©-2Q AC b.Is this a corner lot?CES No _ c.Will the grade be changed as a result of the construction?—-YES_«(NO? d.What is the water source?=PUBLIC)PRIVATE WELL e.Is the parcel on SEWER or a PRIVATE SEPTIC system?Pri vate Principle Structure Packet Revised February 2013, DECLARATION: lacknowledge that no construction shall commence priorto issuanceof a valid building permit and work will be completed within a 12 month period. 2.Ifthe work is not completed by the jyear expiration date the permit may be renewed, subject to fees and department approval. 3.I certify that the application,plans and supporting materials are a true and complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations. 4.|acknowledge that prior to occupy certificate of occupancy ig the facilities proposed |,or my agents,willobtain a 5.|understand that live are required to provide an as-built survey bya licensed land surveyor of ail newly constructed facilities prior to issuance ofa certificate of occupancy. have read and agree to the above: vd SIGNATURE:“Loe bball DATE:Adal Go,2O70 Principle Structure Packet Revised February 2019 Office Use Only Permit 0S OVA)+2029 Permit Fee:§. 5Invoice# Septic Variance?Yes No 7 7 SEPTIC DISPOSAL PERMIT APPLICATION 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 wwrw.queensbury.net TaxMapio#:RAC (Y=[-S 3 Project Location:3 Werth Lawe Applican Name(s):Timothy +Kath leew echavd Mailing Address,C/S/Z:__7 Trogwojs We Guwwsbur wv 1250F Cell Phone:_(5/2 _)260-55 76 (and line:(5/8)524 -7/22 Email:__tabcchard 5 mail cow Primary Owner(s): Name(s):Some as ahove Mailing Address,C/S/2: Cell Phone:_()Land Line:_() Email: Ci check if all work will be performed by homeowner only Contractor:Workers’Comp documentation must be submitted with this application Contact Name(s):Vert)Valley Coystraction Serviees ~Adam Crosse Contractor Trade:__Cowstruction Seru/ces Mailing Address,C/S/Z:__3 Mayle Dr.Porters Corners,VY (25. Cell Phone:_(.5/$)_76/-5 7.land Line:_() Email:__Adem Cvesse @ g mail.com Engineer(s): Name(s):__Ewvirenmantal Bevin Prtwership LLP —Venais Mack lroy Mailing Address,C/S/2:700 Route /H6 Ch Etow Park,Ww 2065 Cell Phone:_(_S/¢_)276 449s"Land Line:_(), Email:__dmacelvey 6 edp tip com Contact Person for Building &Code Compliance:Zim _Sechavd Cell Phone:(5/9 )260 =55 76 Land Line:(578)§32-7/2z Email:_tedechayd@ gmail.Com Principle Structure Packet Revised February 2019 RESIDENCE INFORMATION: Year Built [Gallons|#of bedrooms:|X gallons per|=total daily flow per day bedroom Garbage Grinder Yes |(No) 7980 orelder|150 Installed?(circle one) 7981-1991 0 ‘Spa or Hot Tub Yes|flo) Installed?(circle one) 1992-Present|110 lic 3 330 PARCEL INFORMATION: Topography Flat Rolling Steep Slope %Slope Soil Nature __Sand “loam ___Clay Other (explain:) Groundwater ‘At what depth? Bedrock/impervious material|At what depth? Domestic Water Supply 7 Municipal __Well (if well,water supply from any septic system absorption is__ft.) Percolation Test Rate:per minute per inch (test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size 1250.gallons (min.size 1,000 gallons,add 250 gallons for each garbage cylinder or spa/hot tub System ‘Absorption field with #2stone|Totallength_7-2 ft;Each Trench ge ft.3a Caste Ahubu Seepage Pit with #3 stone How many:35 Vailas Aden Alternative System Bed or other type:_SAg(/ous EATEN 65,Few cl), Holding Tank System Total required capacity?3 tank size.3 #of tanks NOTES:1.Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved.The installed system must match the septic layout on file—no exceptions.3.As-built drawings must be submitted prior to the inspection,if there has been a change to the submitted plans. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void.|have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. print name:Tameh Y Be che rd SIGNATURE:Amid haha Principle Structure Packet Revised February 2019 Office Use Only FUEL BURNING APPLIANCE &Permit #:_LC-OVF1+2022 CHIMNEY APPLICATION Permit Fee:$ Invoice #: 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 wwwaqueensburynet Project Location:3 NMerth Lawe tax Map ID:226 +/9-(-5 3 Room of Install:Living feo un Planned Install Date:_@020 —702/ ONE APPLICATION PER APPLIANCE** CONTACT INFORMATION: Applicant: Name(s):Tiwtly ¢kathleew Gechard Mailing Address,C/S/Z:_Z.Trogwoi Dd,Qutensbuyy,WY 1280 Cell Ph:_(.5/8 260-5576 Land Line:_(5/#)82@ -7/22 Email:_fobechavd @ g mail tom Pris mer(s): Name(s):Timothy +Kathleen Bechard Mailing Address,C/S/Z:Same as ahove. Cell Ph.;_(__).Land Line:__(___). Email C Check if all work will be performed by homeowner only Installer/Builder:Workers’Comp documentation must be submitted with this application Contact Name(s):TBD Contractor Trade: Mailing Address,C/S/Z: Cell Phone:_()Land Line:_() Email: Contact Person for Building &Code Compliance:Timothy Bechard Cell Ph:(518 260- 5576 Land Line:_(“4/8)£.20-7/300Email:_+p.rd @ saci /-Cou Principe Structure Packet Revised February 2015 FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: Stove ___Fireplace Insert AFireplace Fuel Fired Equipment (Garage Only,18”clearance per IMC 304.3) Fireplace,factory built** Manufacturer’s name:__73 D Model #:__VBD ) SOURCE OF HEAT: Wood __Coal __Pellet Gas CHIMNEY INFORMATION: Masonry (require plans to be submitted): block __brick —__stone Flue: tile __steel___size,in inches Material*: double-wall ___triple-wall_-__insulated Manufacturer’s name:Model #: ADDITIONAL INFORMATIO! 1.Two inspections are required.A rough-in inspection,prior to installation and a final inspection,after installation. Manufacturer's installation manual must be available at the time of inspection. Masonry fireplaces &chimneys require plans to be submitted. Twenty-four (24)hour notification is required for inspections. Workers’Comp insurance information is required with this application. yawn Declaration:Construction/installation must conform to NYS Fire Prevention &Building Code and/or manufacturer requirements.The applicant or owner agrees to comply with all applicable laws,ordinances,regulations and all conditions that are part of these requirements and also will allow the inspector to enter the premises to perform the required inspections. Ihave read and agree to the above: PRINT NAME:Limsthy,Bechard signature:Shed Beckagd pare:Anil 20.2020 Principle Structure Packet Revised February 2019 si4/z0z0 \WhisperGreen®Select™Fan/Light,50-80-110 CFM,Muli-Speed |Panasonic North America -United States, WhisperGreen®Select™Fan/Light,50-80-110 CFM,Multi-Speed FV-0511VKSL2 FIND A DEALER WhisperGreensSelect™‘ venTiuarion! FILE COPY hitpsina.panasonic.con/usihome-and-building-solutions/ventilaion indoor ai-qualiy/ventlationfansWwhispergreenr.2 5/14/2020 \WhisperGreen®Select™Fan/Lght,50-80-110 CFM,Multi-Speed |Panasonic North America -United States Please select the type of information you are looking for: lated Product A ——Bair PRODUCT DETAILS Reintroducing WhisperGreen®Select™,our whole house IAQ solution with enhancements. First,our redesigned elegant grille incorporates a 10W dimmable LED chip panel with <1W LED night light for energy efficient illumination,Another new feature is our single-hinged Flex-Z Fast™bracket for more flexible and easy installation.Other enhancements include an environmentally friendly 26 gauge Zinc-Aluminum-Magnesium (ZAM)housing design and dual access junction box that helps simplify wiring in tight spaces. KEY FEATURES. Customizable,all-in-one whole house precision ventilation solution ideal for use in the bathroom,laundry room,sun room,basement or garage Pick-A-Flow Airflow Selector;features a built-in speed select combined with SmartFlow™technology simplifies the selection process ant encures ngps:ina.panasonic.com/ushome-and-buiking-soltions/ventlation indoor-i-quality\ventlation-fansiwhispergreenr-2 siarzoz0 ‘WhisperGreen®Select™Far/Light,S0-80-110 CFM,Muli-Speed |Panasonic North America -United States JA-8 compliant for CA Tittle 24 Please select the type of information you are looking New!Environmentally friendly 26 gauge Z © Bisiness Related Prods,Sen design New!Improved Flex-Z Fast™;single-hing installation @®View Product Support PRODUCT SPECIFICATIONS Energy Efficiency (CFM/Watt] Current (Amps) Power Rating (V/Hz} Motor Type (AC/DC) ENERGY STAR®Certified Other Approved Codes and Standards Duct Diameter Mounting Options Ventilation Design Approach Warranty RESOURCES sy 110=10.5 30 CFM=12.0,40=14.8,50=15.7,60=16.2, 70=15.8,80=15.3,90=13.5,100=12.2, 110=10.5 30 CFM=0.04,40=0.04,50=0.04,60=0.05, 70=0.06,80=0.06,90=0.08,100=0.09, 110=0.11 120/60 DC (ECM) Yes AHSRAE 62.2,LEED,CA T-24,CALGreen 4inch Horizontal Bathroom Exhaust Fan 6 years ECM Motor,3 years all other ntpssna.panasonic.comusfhome-and:-bulting-soluions/ventlation -indoor-a-qualityivenation-fansiwhispergreen-2 sisareaz0 \WhisperGreen®Select™Fan/Light,50-80-110 CFM,Multi-Speed |Panasonic North America -United States ease select the type of information you are WhisperGreen Select™ Ventilation Fan/Light wi Next Speed WhisperGreen@®Select™is a ground-breaking IAQ solution that has revolutionized the ventilation fan industry with a set of features that enable customization and easier installation. To the builder and professional installer,Panasonic continues to be the innovation leader with high performance ventilation solutions that are built to last.WhisperGreen Select’s unique design and superior energy efficiency are achieved through engineering expertise,provided by a company who sets the standard for quality and value. WhisperGreen Select™meets stringent green building codes and standards,including ASHRAE 62.2,LEED,ENERGY STAR®for Homes 3.0,IAP,JA8 Title 24,CA Title 24 and WA Ventilation Code. Ceiling Radiation Damper:WhisperGreen Select™is UL listed for use with the Panasonic Ceiling Radiation Damper (Model #:PC-RDOSCS,sold separately). Installed Performance guarantees up to .375”w.g. static pressure and certified quiet operation at 0.25"w.g.static pressure Although ASHRAE,ENERGY STAR®,LEED for Homes,and HVI have set the industry standard for performance measurement at 0.1”and 0.25"w.g.,WhisperGreen®Select™fans not only provide the powerful CFM output at 0.375"w.g.that is more representative of most installations.Sones have also been certified at 0.25”w.g.to provide a more realistic installed value.So they are quiet under pressure and after installation. Pick-A-Flow™Airflow Technology -You Choose » The CFM hitpstina.panasonic.con/us/home-and-building-solutons/venilaton-indoor-air-qualtyventiationfanswhispergreenr-2 sia/z020 \WhisperGreen®Select™Fan/Light,50-80-110 CFM,Muli-Speed |Panasonic North America United States Please select the type of information you are looking for sores gis yew we amma wi waveianes |)buco requirements and perform as promised,eve Bi dt Plug ‘N Play Modules Ti O§. nt Fan Next WhisperGreen Select's customization features really kick in with a set of patented Plug ‘N Play™modules that give you the flexibility to design the perfect fan in advance,or on the fly,for a variety of ventilation applications.The first snap-in slot is dedicated to the pre-installed Multi- Speed (0,30 to 110 CFM)module with high/low delay timer.The two remaining slots can accommodate the SmartAction®Motion Sensor and/or Condensation Sensor.Refer to the Accessories Tab for more information on our remarkable Plug 'N Play modules. ECM Motor-Best Performing,Most Energy Efficient Motor Available WhisperGreen®Select™features the same revolutionary ECM motor that comes with our WhisperGreen line of products.With built-in SmartFlow™technology,WhisperGreen®Select™ is designed to perform as rated,providing precision ventilation.When the fan senses static pressure,its speed is automatically increased to ensure optimal CFM output.This feature provides peace of mind,as the installer doesn’t have to worry about compromising the fan’s performance. WhisperGreen Select™is designed to perform as rated.When the fan senses static pressure,its speed is automatically increased to ensure optimal CFM output.This feature provides peace of mind,as the installer doesn’t have to worry about compromising the fan's performance,even with a complicated duct run. New Elegant Grille with integrated LED Lighting Our new redesign elegant grille has one integrated 10 Watt dimmable LED chip pane/3000 Kelvin Warm White/90CRI/700 lumens/70 LPW.The LED chip panel is ENERGY STAR 2.0 certified/JA-8 compliant for CA Title 24/50,000 hours rated average life/<1W LED night light. rNFast,Flexible and Easy Installation ntps:ina.panasonie.com/usfnome-and-bulling-solutions/ventlation-indoor-ir-qualiylventlation-fansiwhispergreent-2 14/2020 ‘WhisperGreen®Select™Far/Light,50-80-110 CFM,Multi-Speed |Panasonic North America -United States Please select the type of information you are ooking for vanes vane nanan senapersnesl Co ,duct adapter to give you flexibility in duct lay “witha smaller duct size,but long runs are OK too:,2x8 construction. or Panasonic fans are UL listed for tub/shower tected circuit).With these great features,your insti ENERGY STAR®-Certified for Energy Savings Panasonic ventilation fans are ENERGY STAR certified,where guidelines exist.They've been engineered to comply with the ENERGY STAR®4.0 requirement for increased efficiency CFMMatt),ensuring low cost,energy efficient operation.ENERGY STAR®vent fans meet strict parameters set by the US Environmental Protection Agency (EPA).They provide better efficiency and comfort with less noise,and feature high performance motors and improved blade design, providing better performance and longer life. Additional Benefits Unique Plug 'N Play modules provide up to three value-added features Integrated 6”dual duct adapter enhances installation options /Fits in 2 x 8 construction Built-in metal flange provides blocking for penetrations through drywall as an air barrier, and assists with the decrease in leakage in the building envelope during blower door testing Suitable for installation in ceilings insulated up to R60 Dual access junction box simplifies wiring in tight spaces UL listed for tub/shower enclosure when GFCI protected UL listed for use with the Panasonic Ceiling Radiation Damper (model #PC-RDOSC5) 6 year warranty on ECM motor,5 years on LED,3 years on parts Dual access junction box simplifies wiring in tight spaces Contact Panasonic hntps:sna.panasonic.convusshome-and-bulking-soluionsiventlation indoor-ai-qualityventlaion fanstwhispergreenr.2 1472020 \WhisperGreen®Select™FarVLight,§0-80-110 CFM,Multi-Speed |Panasonic Nonth America -United States Please select the type of information you are looking for: ted Product Business Related Product,Service,or* Indicates a required field Solution COUNTR'Next United States EMAIL ADDRESS: FIRST NAME: LAST NAME: COMPANY: ADDRESS: city: hhtpsina.panasonic.convus/home-and-bulding-solutionsiventlationindoor-ai-qualiy/ventlation fanstwhispergreent.2 719 synarz020 \WhisperGreen®Select™Fan/Light,50-80-110 CFM,Muli-Speed |Panasonic North America -United States Please select the type of information you are looking for: ese ©consumer Related Product s Related Product,Service,orZIPCODE: New “ PHONE NUMBER: OCCUPATION: Select..." COMMENTS: By submitting this form,you confirm you've read and agree to our Privacy Policy and Terms of Service. Ifyou prefer not to receive marketing emails from us,you can opt-out of all marketing communications or customize your preferences here. SUBMIT About Us News ntpssna panasonic.conVus/hiome-and-bulding-soluions!ventlation-indoor-ai-qualtyiventiation-fansiwhispergreenr-2 14/2020 |WhisperGreen®Select™Fan/Light,§0-80-110 CFM,Muli-Speed |Panasonic North America -United States Please select the type of information you are | Investor Relations looking for: Corporate Social Responsibility ©consumer Related Product Business Related Product,Service,or Solution Do Not Sell My Data Get the Latest on Panasonic Trends Contact Us EMAIL ADDRESS: COUNTRY: Select your country Indicates a required field SUBSCRIBE Connect with us 2020 Panasonic Corporation of North America.All Rights Reserved. Privacy Policy Cookie Policy Terms Panasonic Global Consumer —_Industrial | ke bitpstina,panasonie.comusthome-and-bulding-solutionsiventiation -ndoor-ai-quality/ventlation-fansiwhispergreen-2 Manual S Compliance Report Date:May 19,2020 Entire House By: Plan:bechard eteecunencn For:tim bechard eerinrnaetienDesignConditions Qutdoor design DB:85.0°F ‘Sensible gain:22417 Btuh Entering coil DB:75.2°F Outdoor design WB:71.0°F Latent gain:5402 Btuh Entering coil WB:62.6°F Indoor design DB:75.0°F Total gain:27818 Btuh Indoor RH:50%Estimated airflow:1073 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type:Split AC YorkManufacturer:Model:YCJD42S43S4+CX4208(6,9)35+T"(8,L)V°C16 Actual airflow:1260 cfm Sensible capacity:0 Btuh 0%of load Latent capacity:0 Btuh 0%of load Total capacity:©Btuh 0%of load SHR:0% EER eect eas Design Conditions Outdoor design DB:-4.0°F Heat loss:103208 Btuh Entering coil DB:65.6°F Indoor design DB:|68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment Gasfurtype:nace turer:York Model:TM9X120020MP11 Actual airflow:1260 cfm Output capacity:114000 Btuh 110%of load Temp.rise:50 °F FILE COPY Meets are all requirements of ACCA Manual S. AE wrightsoft”m-sutee unveau 20177016 Rovastt6 — rica ngewcy.OocuretsNeaBECHARD.np Cle =M7 Fr Dow acs:N dential Plans Examiner R Form——ential Plans Examiner Review Form weanACCK.cue esean ec om=c sua ene +5 Mmaro9 endings ueensburynyRaderinformation Contractor REQUIRED ATTACHMENTS ATTACHED Manual J1 Form (and supporting worksheets):Yes CJ No] Mechanical license:‘OF MJTAE Form”(and supporting worksheets):Yes No E] OEM performance data (heating,cooling,blower):Yes E}No C] Building plan —_bechard ‘Manual D Friction Rate Worksheet:Yes Q NG Duct distribution sketch:YeAHomeaddress(Street or Lott,Block,Subdivision):,Entire House Design Conditions Building Construction Inform: Winter Design Conditionsullyoda47neater,Front Door faces North femreene at RECT wes nat ction Romanek Snes bstest oa eat loss 103208 Bun 2soa‘Summer Design Conditions 0 Ourdoo:emperture a5 F Indoor erat 75 WindowsresGrainciference27.gre @50%RH ave overhang detonSensibeeatgain:24907 Buh inigrnal hace nonegyLatenteatga002tunen56 [iow Teta heat gain 30809 Buh Number of skyighs:° PMENT SELE CHOU Heating Equipment Data Cooling Equipment Data Blower Data epuent Gas turnace Enigma SotAC—Heaingcim:1260TNsotoSRPEREELNESrmfesinacin:1380 Mod York Mode York Spice ae 0‘Tw9x120020MP11 Youpa2sasss=famvngetoma ure for esting ouput capacy,114900.Bit,Teta cooing capaci 0BunRSPSSETSNel'AG0 Bin,Tal coutng cman =‘ Awceaingcuputcopecty,0 Buh Latent coving capac,0 bun Design irfow:1260 cfm Longest supply duct:of Duct Materials Used Equipment design ESP.(0 inH#20 Longest return duct:of Trunk duct: Tolal device pressure losses:0 inH20 Total efective length (TEL:Of‘ Available static pressure(ASP}:0 in H20 Friction rate:a.)Iv1008 Branch duct ‘Sheet metal Contractor's printed name: Contractor's signature:Date: Home qualifies for MJAE Form based on Abridged Edition Checklist HE wrightsoft”g-sutee vovesa!2017 17.016 RSUZs16 ProjectSummaryEntireHouse Plan:bechard Project Information For:tim bechard Notes: Design Information Weather:Glens Falls AP,NY,US Winter Design Conditions Summer Design Conditions Outside db 4 °F Outside db 85 °F Inside db 68 °F Inside db 75 °F Design TD 72 °F Design TD 10 °F Relive Rarity 2 % Moisture difference 27 grlib Heating Summary Sensible Cooling Equipment Load Sizing Structure:97366 Btuh Structure 24349 Btuh Ducts 5842 Btuh ucts 1067 Btuh Central vent (0 cfm)‘0 Btuh Central vent (0 cfm)0 Btuh none)(none) Humidification 0 Btuh Blower 0 Btuh Eguent loed 103208 Buh Use manufacturer'sdatsulpment"Retefswing multiplier 0.90 Infiltration Equipr ‘sensit 20175 Btuh Method ‘SimplifiedMetsnqualitypied Latent Cooling Equipment Load Sizing Fireplaces 1 (Average)‘Structure 5402 Btuh Ducts QBtuhCentralvent(0 cfm)0 Btuh Area (fe ag CO Equipment latent load ‘8402 BtuhPeete=“Eat oggbuaur: Equiv.AVF (cfm)662 294 Req total capacity at 0.70 SHR 24 fon Heating Equipment Summary Cooling Equipment Summary Make YorkMakeTradeYORKTrade: TM9X120D020MP11 Cond AARI ret 2008696 Soll AHRI ref re 95.5 AFUE Effcieney He i 120000 Btuh Sensible cooli Heating obtput 4000 tun Tatent Temperature rise 82 °F Total coolir Actual air flow 1260 cfm Actual air Air flow factor 0.012 cfm/Btuh Air flowfactorStaticpressure0inH20‘Static pressure 0 inH20 Space thermostat Load sensible heat ratio 0.81 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. HE wrightsoft”pigi-suteo Unverat 2017 17.0.1 RSUZST6 erteeImacargewethyDoemeraOsBECHARDipC=MAT Fret Dow aces:M ENNwoe) 200 mis LFm =980 dev GuYnoaeaA\EMURSoC KaoNeueHOHLeteseiisensuO11LGMEMOUERONasomguygaan ely SS”Ssiss'0cr-tereazaz ci Or WOoW ‘SUOHEIMOED f=Jor im aa lm beerayenn|san|or [Bae [Pam|cos [Bos a nalovou\aine oumejc||Se fer|tS oe =ineora5mm]i =)PF = exnaneparfae4=|=f =|==‘mreserA=|=f =]=p =so RonesotfomSm|S feo|S|Jeon x sven opgnic HSU brs || Io lb“Je =f [s =lowesivaxpopxpopxeeSmt su), we mm Pm me|me ati mm or|ae weroistcrfis[we™|St feet|a”|mt fee fae”|foe |fa alot=| e Se|ie 2.|mm fe w=|i=cexrsisp Son=x]mp mfp mn]"Sraxe=|=f =|=f =]mp x ‘gp0y menesorSrfoeos|xt]xt fee[|ct]ct few|ct]ot few|om isu sence ear |bIo[a lv |e b1fefoefoe|e rie foe fh 8 ces fies four (ew fon|©‘Som. ls Jo Jum—JoJo Jim —Jo Jo fr lb Jum Jo —Jo 7]ojo fins fo fo fit fo fof fim feo 3]omeojofim«fo fo fits fo Jo b im fe jo b|‘seFnbmisfeB]suse lo fo fo fo fo fo fo fo fon fe (es|owe]wom3forfm»fo we fom fo femme ft fas ewe fo [et|Getle|“sme la Jo Jum JoJo Tim —Jo Jo fr ls Tim JoJo 7 lo fo fit fo fois fo fof bam fe fo . lo fo fim «fo fo fits fo faa b fim fe foefefiatfeffif8fhotffefefofinsfofitsfofoelimfefois lio for fom [oor four faut’oc foes fre’fcr [nce fear [tx [oz Joomr|e} seameofor le Jo fam Je Jo fam Jo Jo fiw a ;nn fini fs feesjefuJofofmfofoibanfofo|somes2fefitfofofJ48finifsfoB]sacleojofinsfo.fo fits fo foi bins fo fo a]“poatefofuefourfomoomforsefxrfrrwfomtzvorfoxfosfesse‘meeee~~ep lb fo le fo q b p f pb pb f&pb &Bp b of 8 iesbfjofpfpfpfpfplisefeefemeofreefoomfe|smpeaole lo =e Je =e fe =p =fe foaH4=P =p fb Te flow|So ft foo|ures5xpopmpofxf=f fpmassfico|Tm Jom ftom|foe fo =fico|T=:fem laze wa|bagixefe=f of mp fee|dR BB|mle|snlm|cm fe |mp op mp fee|mf fer wen|ue smenana|2 e Ie =e Io =fe =p fe]=fo 7=p =f fs =p =p oP |p .=PB =p of =x op x b|=i °=f =f mf pb =sp|=o B)sam woe 10.lo eooe 10.lo eve [0 lo ae lo =0 a sx00p sei| cx fou fe|cf fe|mp fp i ftw fice|2 [Bee|ooe|é)pur smenam|o me |e mm ame it ame Yt mm oJ Jo 7 So pomofii Yop fit fo filth fs fa it fs feloSi}fin Sp fit fp fit PY ith fe fe b|seescofomfiJomfocPAfoofomfafofocthf8-J8 B]eenSpofimSptfimftpfinft]fim fe fe la}wsm|omfet|moo mi]mife|co]mc Bh fos [ps feané]“ead |e1a|a]85|on|ca]So|on|tai]89|tm}tal]Gol tl on]|sunsoac( yng)pany|way (umg)peo}|say (ung)peo)|cay (ung)peo)|cay aH 489)40 BdAL Penna oe weormeal_oe woonmealy oe |B ioe|wo weno|—stmwo > ubor 3 ov won ost ule zor somoup usoy |eWoeVoleFaasuousyeponeBue!|Pomeo"og ‘ronan ‘ion aoa |au vnnve preyooq cus ozor'ts few 090 esnoy asguz uiuuous aor yooyssoM OF-IUBIY Right-J®Worksheet hae Entire House a me MANUAL:TE 2}ane wrnes 0 8 toaif egsed wa “—00 5]eam arereions tox aon eox “aonornt]esings|Coen.optin|a0 hens 80'R Peaveon esol tweeor|Jost]wim|aa|omseuy|ama|tons eur eed BtonEXPOSURENO.[Hig jig|(rt)Hig Cig_|ttt)oo cy sfooes——afraesl sal sof ol mm|om ==l==Some (8 ofS)owt)SS]SS]ot |Se =|= fwatsar fe of)tm)sme fe |i)see|ee =|== poctom ||9 =][imps |S os |S =|| 9 =[==int]see]|mf see|sei|oe ||im suf =f |imnf soe|oe wnsove ara_|a}a00|ano d=woof mm|as]amo)oe 200)= goss cor ||=a]o}5)3)= fear |||oo ol o}ol =of =| 4|q ol of of ol = A ‘|3 =o]=sf of 3]= i 4|=ol of of | 7|wiesone ans|Nom wd ==|moo Em =a|es|ih|Bo Heed 3}al @|=o|ow 29]J |gl 4]=|asersw|=3 =|4|=| Soun”|saa =3 =|@|=4) hoe A =4 ES ||=4 sJome ccs [af sc0o]23]aa]Fi of of elcomeJol3]3}9 9 Fr a er)J ol 9 4 oe |Sofneafrzea]sal sol ol ol 73]sur]0]orl velaepee8}*o)mnt of“)aml a]ofaman|e 3}3)i of o}mm ot |olporto|G 3}Si of of 5 |g*|3}}i im)o}|tim)oll ofolfiimo}SS ||welcomes [alrecol a4]x a]lS me]ool3]"9 apo}it)3 SSeS||mu}=of oft?ota]a]4 |3 mf=of oft oS)tm}a]|of}tim)mmf of oft?of o}am|a]'||mm!‘uf off}my)n]pexs alia|sz]of aol al a a]cx]of colsmallfaemem|3]ia0|17]3]|a}ofTgpermet”||fo}mn]TrBao||3}tim)impo]|frase fa of of im}im}3}craeen)|of of iy tim]9]o||tim!=}‘ a]inimaicn |wo]a7]of ols)to)_—_—vaos|_—er|_——|r]weal nol vans7Venton443|||13]Suscttengnore.tte12 cz]ome fee|oom es Poe|camel veer]tase estore heating =ed qjcm pt JE a)=So =q=|=qo pm qieatgretaen==|=j=|i=gh4}Dat cas om]|ew]alm|ow]an]om 13]15|Tetons =19604 |al zonal ||sonar]m0]i Peon sol ol =Fi =a}of =ol =7oeteeta]8 oe 3 yo o}8)3]af =| 17}sue RSH ge.12+10 me|tee Poe|ce Pl TS|oa{es ener ing =|==|=of |of ="|ee rower =)=go |qhoz|om gx fotaCooteedsrton=lS gm|=i=)=ga l=a16|Su gan om|=Fela|we |=|lel|gl18}Yas ROH gms 19-P LE too]|x}too]=|sa]st]|asta]soo|=]2|Arend im)E|x *|veo]a|"| Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. He wrightsofe”pin.sutse Unvera 2017 170.18 aSUZSN8 Mar ee?Er "vac ergonnfDoiee NCA EONORD 8 COL CMT”Fk Dow aces:M — Right-J®Worksheet Job:3northin Date: May 13,2020EntireHouseae bechard MANUAL JME 4]Name rem Reon foamReams2Lngexposedwamat‘ee ft373]aun arene 10x Sa0"n 10 x Heo"10 x Bio'n‘ s]aings Conch Opton|80h hats 0h hates ryeeor|fest]mm|ame|toes un,|Aree|LonaounBwrosune||no:|e "oo |e|ite“|Co @o_[en|Hey Go Joos falraal sal sof al om|om =|o@-l= Sees 8 3}‘oo atn]SS]SS =]oii |=worse fe s}of tim]sme |=}ims |orto of)tim)se |=]om)ss]ss b of)tin)|se}im)se|Se f of of tim]|cm|tim]oe || wcowe aw [alao0|aaol =|sta)aoe)=dol =|fmpossoe|of |)Me gs =9]3]Feng”fe j=}of gm of =3]af sm F)j=}oy S|=of a}= A f=}3]==a]a]= f jm]of Qo =of of 7]Widow wa|nom wo al =o|oeee|ier|go si =3 o]|omHiowa)saa]=Q|s]Hsersw|=3 o]lo 9) San"|aa]a 103 =3]§]a]A| 9 =H a]a b @|oer cone waa]ea]ea]axer]ond |Jt of of i‘ o]ol}a cr er |3}6}|og a |ale afsaal sa]sol oss]sora]oma)ra)ese]cae vo]7a]an]atSomesfoof“)a in)ola 3}oni “o]feats el |of im)=}tm Sa]|ifgfactorsfa}tim)iim)8]i|s}3}tm tm og rT or?o|om)st]3]im |“ 9 afrecol a]sa]axl al ar]ve aa]aul cael 2 3}of im)|Scor4i|gl 3}fim 8}A o}oo}om)|3}im)a]f |om i a Cea1]rom——[alvao|sz]of 720]son qo prerRewcom|8]ta0|13]3]3]Cr |36tgpecee|}sf om)wm}a]3}om)a}‘op |oo}om)my]2orfea3}o}tim)im)a]o}im}=o]fort |}tm)tim}a}|tim)a]‘alimatin «|vo]a7]70]aerrs]cao |ol zl wo]auladVecason3|"|| 13|ssc oxemore.eior2 ce|ml Pe Poel =l=lea=see cera retg =|=|==|]|Las taet =qo |of ==[= 4 =Si =mix ol =|==|Doce |sso]=|“ew|or]so|New|er]= 18]eats toe =co]|cia)==a t=cee 7 tol |Ki a ed =:|3]a a=H 17)suet RSH garera.Hov16 we SL me|aah oe P|ce swe)ome|S|tee eure arg =|=|=3 of|onHtesrar=]go |S F gl |3oatedsttton=|=||||3 18|Out gun me |=|al “ee||ll al}|al$ 3]ot Rt ar ee eyeur |=|rece]too]=|ane wm]to|=|sa2Arenaon)‘col "Ua a)al | Calculations jed by ACCA te all requirements of Manual J 7th Ed. Ban HE mrtg oft gesie vowel 2017 17.018 2502511,‘ 2020 ay 13 10.5659Pageraltcottlangeworhy\Oociments\YoR\GECHARD.rup ‘Calc =MJ7 From Dor faces:N Right-J®Worksheet pene = Entire House May 18, Plen:bechard MANUAL J:Mh Ed.‘ sane stream Rona RoomsFone2Logexposeswt0on°3]aun anerocre tso x “aon tox oon sox mi7'n 4]Cxtnos|cont.option 0 Ry few 20 fy heweon 0"RyReoot qweor [Tost]imma|avn|towaceum|area|tonscouny|Are|toma@uny|ArceEXPOSUREINO.|Hig Cig|(ny Cg}ere Hig|Cig |Hig og Hig oe 3]cree efies]sal to)aol om|ome =le sel ome|mm =f= Epona |a}5)wt]Sf SS]gol SEY SE]gat]Se]=[os jwatsons |of oo)ti}ef me]ef se]tim]ee]SS =|= petions |of)mm)sf]timp SY SS)tim]Se]==|©}of inn se|sm)imf see|See |]see |=|oS'off tm om fm |)||]Soe |=|| winsows vs [al 00|50]=of 9 ol === gesscoon |ol =fg 3 |=¢| of =off wm f |==o|qs ym q qo =|ge ed q y==f f=o]|of == 7]windows et|en wal of ===|=o|= es -|g y==q =a =Ew ao}|==4 =‘|= sersw o]of om =|=4|= Soun xs}|=4 =|=4]= How of of a go |~_4 = afovecoas [alrooo]aa]es}ol 7 4ol5)of “oo 9 9 of Q |ol 4 |9 9 9 Oo | of ne sa]col ole J ero]alexcesof“)uin|9 ou!8}|ete se of of in mn}a]Jolnoss}of inn)imp 8]|of)im)tim)o}fam}of tim}ost StSoolcanes|alracol 24]24]ool ao]or]oo)cool oe]ama al‘|a}a}wim}“mf 3]3)ate]a)8 of of mn}=ffs!Sot tm?Sa]‘|a:||Fr |'of o|in Ce ee a“|Feo sfi90|17]ol Jrefowon|8]t0|17]3 7 3 3 ootgPes|g a}9 wmf of]um,Stlralo}3]iim 3}in =o}ots timotferselof)i im}of otffgos)f of oti immo}!=‘alive 2|wo]a7]ol d Peeeeaten4|g |g13Suetonemeva.orto12 =|ow2le|a=l=)ea=l==tess enera stg ==|=of =|of =|=a ==fm gon |y=|==Heirgstesn ==|=|=of|==14]Dato ee}al|ew]al mm |== 45 Tortie =19014 |ol so80]=|=‘ efi gare wel ol =d=fol a Ql =me 4 of al a 3 = 17 eta nar neo aoe =roof mee Pm Paap me PE|a]ome | anane 7 =oe |‘eeeee=mjm Qo |gonjoiaawan=jm =]S f=(=a=|=eke [B=] od BE)2 BlE}2”f=‘| 1 wo}|om)to]=|)so]=|oe =3 |Arnadrs4,"5 |4 f° Calculations irements of Manual J 7th Ed. Bx TH yrtonteore igh-Suts®Universal 2017 17 0.16 RSU2SNS ena‘aitcat.langeworhy\Oocuments\Yor\BECHARD.rup ‘Cale =MJ7 Front Door faces:N REScheck Software Version 4.7.0 YwoOn. aComplianceCertificateSeasse&GofpeSFAn Project New Residence 3 °«2° nu & Energy Code:2015 1ECC & Location:Glens Falls,New Y¢NI z Construction Type!Single-family y F Project Type:New Construction m 82 Glazing Area 16%2BClimateZone:6 (7635 HDD)taPermitDate:g R Permit Number:€RK ynConstructionSite:Owner/Agent:Designer/Contractor:»° ephall@nycap.rr.com ICompliance:Passes using UA trade-off Compliance:3.6%Better Than Code Maximum UA:329°Your UA:347 he eter or Worse Than Cade Index elects how cote to compliones the house is based on code trage-of rules. IR'GOES NOT provigean estimate of energy use oF cost relative toa minmum-code home Envelope Assemblies Gross Area,Co cs enaatitalonseSCeiling1:Flat Ceiling or Scissor Truss 600 49.0 00©0.02616 Celling 2:Cathedral Ceiling 546 49.0 0.0 0.02212 Wall 1:Wood Frame,16"o.c.1720 210 36 0.046 67 Window 1:Wood Frame:Double Pane with Low-E m7 0.290 51 Door 1:Glass 40 0.320 13 Door 2:Solid 18 0300 5 Doar 3:Solid 18 03000 5 Door 4:Solid 20 0.300 «6 Wall 2:Wood Frame,16"0.7B 21.0 36 0.085 26 Window 2:Wood Frame:Double Pane with Low-£187 0.290 54 Basement Wall 1:Solid Concrete or Masonry 861 00©15.0005547Wallheight:5.0° Depth below grade:4.0" Insulation depth:4.8" 560-380 0.0©0.02615Floor1:AllWood Joist/Truss:Over Unconditioned Space Report date:04/01/20ProjectTitle:New Residence Page lof2Datafilename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Compliance Statement:The proposed building design described here is consistent with the building plans,specifications,and other Calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IEC requirements in ied in pie RES}check Inspection Checklist. Ethan P.,Hall -Architect ateName-Tite Report date:02/11/20ProjectTitle:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Page 2 of10 REScheck Software Version 4.7.0 Inspection Checklist Energy Code:2015 IECC Requirements:100.0%were addressed directly in the REScheck software Text in the "Comments/Assumptions"colum provided by the user in the REScheck Requirements screen.For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided. Section T°"|presnspectionvpian Review|Plans Verified|Field Verified|Compiies?|comments/Assumptions& neauD 103.1,Construction drawings and complies Requirement will be met. 103.2 documentation demonstrate OboesnotRrRih_leneray cove corphance forthe Location on plansispect A-lly envelape:Thermal {Wot observable envelope represented on INot Applicable construction documents ane _103.1,Construction drawings and complies Requirement will be met. 103.2,documentation demonstrate CoesNot03:7,energy code compliance for Location on plans/spec:ATemaightandmehanistsystems.{hot Observable° Systems serving multiple fot Applicable apeling une uck deponstrate ompllsnce withtheeeCommercialProvigens _— 302.1,Heating and cooling equipmentis Heating:Heating:complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr.Btu/hr_OboesNotTPR2}?on loads calculated per ACCA Cogjings Cooling Location on plans/spec:A- FB iiiionval)orotermmacocs|Sl Seating [itonservatiehprovedbythecodeoa——ot Applicable Additional Comments/Assumption: 1 |High impact (Tier 1)[2 [Medium impact ier 2)|3 [Low impact (Tier 3) Project Title:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Report date:02/11/20 Page 3 of10 insulation R-value.Where interior insulation is used,verification may need to occurduringInsulationInspection,Not required in warm-humid locations In Climate Zone 3. Conditioned basement wall insulation installed per‘ manufacturer's instructions. Conditioned basement wall Insulation depth of burialordistancefromtopofwall. A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in.below grade. 1 |High impact (Tier 1)[2 [Medium impact (Tier 2) Project Title:New Residence Not Observable‘ Not Applicable NotObservableNotApplicable does Not Not observable Bow impact Data filename:Y:\Bechard Resdience -Assembly Point\Const Dw9's\Bechard.rck i ca Foundation inspection|PlansVerified|FieldVerified| Compties?|Comments/Assumptions 402.11 Conditioned basement wall complies ‘See the Envelope Assemblies Ciodoes Not fable for values Requirement will be met. Location on plans/spect A- See the Envelope Assemblies table for values. Exception:Requirementisnotapplicable. Exception:Requirement is, not applicable. Report date:02/11/20 Page 4 of10 Section or has infiltration rates per NFRC 400 that do not exceed code ti Dot Applicable F"|eraming /Rough-In inspection]Plans Verified|Field Veriied|Compties?|comments/Assumptions| e Req ae eiasi402.1.1,Door U-factor.U-complies ‘See the EnvelopeAssemblies0234eeeSelecLin(Not Observable Wot Anplicabie 402.1.1,Glazing U-factor (area-weighted=U-complies ‘See the Envelope Assemblies 1402:3.1,average),—_Oboes Not table for values 0033,{Not observable heed CNot Applicable we 303.13 Uactos of fenestration products Cicomplies Requirement willbe met. FRA}are determined in accordance OdoesNotwithteHPRetestprocedureor Location on plans/spec:A© Taken trom the defaut table CNet Observable GiNot Applicable 402.4.1,1 Air barrier and thermal barrier complies Requirement will be met. FR23)°stalled per manufacturer's DoesNoto(incovctons Chor obsenabe Loetiononpansipec:& 7 _ GiNot Applicable . 402.4.3 Fenestration that is not site built complies Requirement will be met. FR20}'is listed and labeled as meeting DoesNotDRAMAIWOMACSA101S2IK440ete ate 1 /High impact (Tier 1)|2 [Medium impact (Tier 2) not Applicable 402.45 |C-rated recessed lighting fixtures Oicomplies ‘equirement will be met.[ FR16?sealed at housing/interior finish Oboes not andlabeledtoindicate32.0 cf ns/spec:A-and abledto neat 32.0 tm [hot Observable $eeatlon on plans/spec:A CiNot Applicable 4033.1 Supply and retum ducts in atice Cicomplies[ FRI2P insulated>=R-8 where duct is,does Not —-—completely inside the eo >=3inchesindiameterand>=[Not Observable building envelope.6 where <3 inches,Supply and return ducts in other portions of Onot Applicable the building insulated>~R-6 for diameter>=3inchesandR-4.2lieieeedOC53inciesIn-ciameter,ee al __}403.3.5 Building cavities are not used as Oicomplies Requirement will be met. IFRIS5}?ducts or plenums.Coes not°[ not observable 42eation on plans/spec: Dot Applicable 1403/4 HVAC piping conveying fluids.(complies Exception:RequirementisIFRIZP—above'105 +or chilled fluids Cdoes Not —_not applicable. gy below 559 areinsusted a =k.chick Ghiasvableal_ iCinot Applicable_{ 403.4.1 Protection of insulation on HVAC Cicomplies Exception:RequirementisTFR24i*piping Coes Not —not applicable. e [Not Observable NotApplicable4035.3.Hot water pipes are insulated tof:complies Requirement will be met( FRIBP?=R-3.oesNote[her Observable Le€ation on plansysp not applicable 403.6 Automatic or gravity dampers are complies Requirement will be met. FRI9)?installed on all outdoor air CoesNottakesandexhausts[not Observable 4eeation on plans/spec:A 3 [Low impact (Tier 3) Project Title:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dw's\Bechard.rck Report date:02/11/20 Page 5 of10 Additional Comments/Assumptions: 1 |High impact (Tier 1)[2 Medium impact (Tier 2)|3 |Low Impact (Tier 3) Project Title:New Residence Report date:02/11/20 Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Page 6 of 10 Al installed insulation is labeled or the installed R-values Provided. Floor insulation R-value. Floor insulation installed per‘ manufacturer's instructions and substantial contact with the underside of the subfloor,or floor framing cavity insulation is in contact with the top side of sheathing,or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. mass wall with at least %of the wall insulation on the wall exterior,the exterior insulation requirement applies (FR10). Wall insulation is installedpermanufacturer's instructions. ligh Impact (Tier 1)al Plans Verified|FieldVerifiedValue‘Value Wall insulation Revalue.ifthis is @ Re1 Wood 2 Meatum impact ier 2) Complies?|Comments/Assumptions Ccomplies Requirement will be met.‘ Dees Not CiNotObservableNotApplicable Cicomplies Cdoes Not Dot Observable Oinot Applicable Requirement will be met. Net Observable Location on plans/spec:A Dnt Applicable Dicompties Oboes not Not Observable DiNot Applicable BcomptiesDoesNot Not Observable | Not Applicable Requirement will be met. Location on plans/spec:A- Low impact (Tier 3)| Project Title:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Report date:02/11/20 Page 7 of10 402.1.1, 402.211, 402.22, 402.26tra} Req.ID Plans Verified|FieldVerifiedFinalInspectionProvisionsSaceWale Complies? Ceiling insulation R-value,R.Cicomplies CQ Wood D Wood ‘Oboes Not O Steel Ci Steet CiNot Observable BiNot Applicable Comments/Assumptions See the Envelope Assemblies table for values. leakage measured with a pressure differential of 0.1 inch wag.across the systemincludingthemanufacturer's air handler enclosure if installed at time of test.Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch 9.across the entire system Including the manufacturer's air handler enclosure. 303.1.1.1,Ceiling insulation installed per 7 Bcomplies Requirement will be met. 303.2 manufacturer's instructions.Oboes not[2 Blown insulation marked every [not Observable oeation on plans/spec CiNot Applicablei4223__Vented attics with air permeable ‘Dcomplies Requirement will be met.{ F122}insulation include baffle adjacent lboes Notfitandeaveextendsoverinsulator. CNet Observable oration on Plans/spec not Applicable >[ 4022.4 Attic access hatch and door R complies be met FI3}!insulation =Revalue of the Oboesnotadjacentassembly.[Nor Observabie Location on plans/spec:A- ss _Dot Applicable 402.4.1.2 Blower door test @ 50 Pa.‘ACH50 ‘ACH5O =Ticomplies Requirement will be met.[ FIL7}:"ach in Climate Zones 1-2,and does Not‘ ach in Climate Zones 38.[Bnot Observable Leeatlon on plans/spec:A ONot Applicable 403.3.4 Duct tightness test result of <=4 ‘fmn/100 fm7io0 Cicomplies Exception:All ducts and air[Fa cim/n00 fa across thesystem or ‘Oboes Not handlers are located within<= 3 cfnv/100f2withoutair‘conditioned space.handler @ 25 Pa.For rough-in pes Observant tests,verification may need to ‘CiNot Applicable occur during Framing Inspectio ___' 403.3.3 Ducts are pressure tested to cfmv100 cfmno0—Bicomplies Exception:All ducts and[ FI27%determine air leakage with w z Cooes Not handlers are locatedwithineither:Rough-in test:Total Not observable <2”ditioned space. Biot Applicable accessible manual controls. 2 [Medium impact (Tier 2)1 |High Impact (Tier 1) 403.3.2.1 Air handler leakage designated nes Cicomplies Requirement will be met. FI2a}'by manufacturer at <=2%of doesnotdesignairflowTceObservae.Location on plansispec: 403.1 Programmable thermostats Requirement will be met. IFI9 installed for control ofprimaryheatingandcoolingsystemsand Location on plans/spee:A. initially set by manufacturer to ICINot Observable 1 code specifications.DWNot Applicable 7'403.1,2 Heat pump thermostat installed complies Exception:Requirement is( F110 ~—_on heat pumps.Cdoes Not not applicable, Not Observable Be A —_ Ginvot applicable 403.5.1 Circulating service hot water complies Exception:Requirement is |Trini}?Systems have automatic or Coces Not not applicable. NotObservableDotApplicable 3 [Low impact ri jer3)| Project Title:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Report date:02/11/20 Page 8 of10 Comments/Assumptions Requirement will be met. Location on plans/spec:A- Exception:Requirement is Exception:Requirement is 1 |High impact (Tier 1)__[[Medium impact (Tier 2) Not Applicable Exception:Requirement is Exception:Requirement is Requirement will be met. Location on plans/spec: 1 Requirement will be met, Location on plans/spec:A- 1 Requirement will be met. Location on plans/spec:A- 1 Section#| Final inspection Provisions|Plans Verified|Field Verified|Compties76Reqd,de =Bil' 403.6.1 All mechanical ventilation system complies F125]?fans not part of tested and listed CoesNotHVACequipmentmeetefficacy and airflow limits.Cot Observable Heracles Not applicable 403.2 Hot water boilers supplying heat Ccomplies F126}?through one-or two-pipe heating Oboes Not nt applicable Cental to ower baler water ©Not Observable temperature based on outdoor Oot Applicable temperature -' 403.5.1.1 Heated water circulation systems ‘Cicomplies TFi26H have a culation pump,The Oboes Not not applicable. system return pipe is a dedica return pipe or a cold water supply Nok Dservatie pipe.Gravity and thermos-‘Oot Applicable syphon circulation systems are‘ ot present,Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.Controls automatically turn off thepumpWhenwaterIsincirculationloop s at set-point temperature and no demand for hot water exists. 4035.12 Electric heat trace systems ‘Cicomplies F129}°"comply with IEEE 515.1 or UL ‘Cees Not not applicable. 515.Controls automatically Adjust the energy input to the Not Observable hheat tracing to maintain the Oot Applicable desired water temperature in the ie piping,;| 1403.52 Water distribution systems that Bcomplies FIB0 have recirculation pumps that ‘Doves Not not applicable. ump water from a heated water Supply pipe back to the heated E-INot Observable water source through a cold ‘Oot Applicable water supply pipe haveademandrecirculationwater system,Pumps havecontrolsthatmanageoperationofthe ump and limit the temperature of the water entering the cold water piping to 1042 _[ 4035.4 Drain water heat recovery units Hicomplies IfFIB1J?tested in accordance with CSA doesNot855.1.Potable water-side pressure loss of drain water heat Not Observable recovery units <3 psi for Oot Applicable individual units connected to one F two showers.Potable water- side pressure loss of drain water heat recovery units <2 psi for individual units connected to three or more showers. 1404.1 75%of lamps in permanent complies Fl6}'fixtures or 75%of permanent doesNotfixtureshavehighefficacylamps. Does not apply to low-voltage Not Observable fighting Not applicable 4404.1.1 Fuel gas lighting systems have complies F123}?no continuous pilot light.does Not e Not Observable 3 [Low impact (Tier 3) Project Title:New Residence Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Report date:02/11/20 Page 9 of 10 Final inspection Provisions Compliance certificate posted.4 Manufacturer manuals for mechanical and water heating systems have been provided. Additional Comments/Assumptions: 11 |High impact cTier1)[2[Medium impact Tier 2)|3 [Low Project Title:New Residence NotObservablenotApplicable complies Requirement will be met. Coes Not NotobservableNotApplicable Data filename:Y:\Bechard Resdience -Assembly Point\Const Dwg's\Bechard.rck Impact Tier 3)| Report date:02/11/20 Page 10 of10 2015 IECC Energy Efficiency Certificate eter}Peat) Above-Grade Wall 24.60 Below-Grade Wall 15.00 Floor 38.00 Ceiling /Roof 49.00 Ductwork (unconditioned spaces): ee ea sa‘Window 0.29 Door 0,32 Posture eeeus eee Heating System:— Cooling Syste — Water Heater Name: Comments