Loading...
Stormwater Management Report STORMWATER MANAGEMENT REPORT FOR ADIRONDACK WINERY 395 Big Bay Road Town of Queensbury Warren County, New York Prepared For: Adirondack Winery 395 Big Bay Road Queensbury, NY 12804 April 13, 2020 [[1275,1901,1325,1958][12][B,I,][Times New Roman]] Project No. 5214A Prepared By: Luigi A. Palleschi, P.E. ABD Engineers, LLP 411 Union Street Schenectady, NY 12305 (518) 377-0315 STORMWATER MANAGEMENT REPORT ADIRONDACK WINERY 395 Big Bay Road Town of Queensbury Warren County, New York TABLE OF CONTENTS ITEM PAGE PROJECT LOCATION ....................................................................................... 1 GENERAL SITE DEVELOPMENT ................................................................... 1 SOIL TYPES, GROUNDWATER & TOPOGRAPHY ........................................ 1 STORMWATER MANAGEMENT PLAN ......................................................... 1 ANALYSIS ......................................................................................................... 2 SUMMARY ........................................................................................................ 3 EXHIBIT 1: SITE LOCATION MAP ..................................................... Attached EXHIBIT 2: PRE-DEVELOPMENT DRAINAGE MAP ........................ Attached EXHIBIT 3: POST-DEVELOPMENT DRAINAGE MAP ...................... Attached APPENDIX A: STORMWATER CALCULATIONS ............................. Attached STORMWATER MANAGEMENT REPORT ADIRONDACK WINERY 395 Big Bay Road Town of Queensbury Warren County, New York PROJECT LOCATION The proposed building addition is located at 395 Big Bay Road in the Town of Queensbury, Warren County, New York (see Exhibit 1). The site is bordered on the south by a truck repair facility, on the east by Big Bay Road, on the north by Brookfield Power, and on the west by Gross Electric Inc. GENERAL SITE DEVELOPMENT The applicant is proposing to develop a 2.0 acre parcel in order to construct an 11,100± square foot building addition, associated gravel parking, and stormwater management area. The existing winery headquarters building will remain and the new development will be located beyond the existing parking lot. Access to the site will remain off of Big Bay Road. SOIL TYPES, GROUNDWATER & TOPOGRAPHY According to the Warren County NRCS, the primary hydrologic soil group is type A, Oakville loamy fine sand. The soil properties are generally well drained with groundwater more than 80 inches below grade. Percolation testing resulted in stabilized rates of less than 1 minute per inch. The existing site drains to low points onsite and infiltrates. STORMWATER MANAGEMENT PLAN The stormwater management plan for the proposed project will utilize surface sheet flow across gravel and rooftops to the infiltration areas as shown on the site plans. Post-development discharge will be controlled with detention of the entire 100-year storm event and all runoff from proposed impervious areas will remaining onsite. [[372,3065,425,3109][9][,I,][Times New Roman]]A [[396,3065,721,3109][9][,I,][Times New Roman]]BD Engineers, LLP [[693,3065,743,3109][9][,I,][Times New Roman]] [[1275,3065,1325,3109][9][,I,][Times New Roman]] [[1880,3065,2210,3109][9][,I,][Times New Roman]]Adirondack Winery [[2176,3065,2226,3109][9][,I,][Times New Roman]] [[2326,3065,2376,3109][9][,I,][Times New Roman]] [[375,3108,425,3152][9][,I,][Times New Roman]]5 [[394,3108,482,3152][9][,I,][Times New Roman]]214 [[448,3108,501,3152][9][,I,][Times New Roman]]A [[473,3108,523,3152][9][,I,][Times New Roman]]- [[485,3108,586,3152][9][,I,][Times New Roman]]SMR [[558,3108,608,3152][9][,I,][Times New Roman]] [[2069,3108,2182,3152][9][,I,][Times New Roman]]Page [[2158,3108,2208,3152][9][,I,][Times New Roman]]1 A NALYSIS The pre-development and post-development drainage maps are located in Exhibit 2 and 3. HydroCAD TR-20 method is utilized for the stormwater analysis. Stormwater calculations for the pre and post-development conditions are presented in Appendix A. pre-development condition In the , the site and surrounding area is made up of low points which collect runoff and allows infiltration into the well-drained soil. There Pre Area 1 are two drainage areas in the pre-development condition (refer to Exhibit 2). is 2.05 acres and consists of existing rooftop, pavement, gravel, and grass areas. Runoff drains to a low point. The peak runoff rates to Low Point 1 for the 1, 10, 50 and 100-year storm events are 0.00 cfs, 0.51 cfs, 2.52 cfs, and 3.97 cfs respectively with a time of concentration of 10 minutes and a CN value of 53. The required 100-year storage volume is 2,599± cubic feet and the low point provides 4,050± cubic feet. The entire 100-year storm infiltrates and there is no discharge to Waters of the United State or a municipal storm sewer system. Pre Area 2 is 0.15 acres and consists of existing grass areas. Runoff drains to the adjacent stormwater management area. The peak runoff rates for the 1, 10, 50 and 100-year storm events are 0.00 cfs, 0.00 cfs, 0.01 cfs, and 0.05 cfs respectively with a time of concentration of 6 minutes and a CN value of 39. The entire 100-year storm infiltrates within the basin and there is no discharge to Waters of the United State or a municipal storm sewer system. post-development condition In the , there are two drainage areas as in the pre- development condition, but Area 2 is reduced to zero as the area is now directed to Post Area 1A infiltration basin 1A (refer to Exhibit 3). is 1.76 acres and consists of existing rooftop, existing pavement, proposed rooftop, proposed pavement, gravel, and grass areas. Runoff is conveyed to Infiltration Basin 1A. The peak runoff rates to the basin for the 1, 10, 50 and 100-year storm events are 0.70 cfs, 2.57 cfs, 5.04 cfs, and 6.53 cfs respectively with a time of concentration of 18 minutes and a CN value of 73. The required 100-year storage volume is 7,459± cubic feet and the basin provides 13,595± cubic feet up to elevation 94. The entire 100-year storm infiltrates and there is no discharge to Waters of the United State or a municipal storm sewer system. [[372,3065,425,3109][9][,I,][Times New Roman]]A [[396,3065,721,3109][9][,I,][Times New Roman]]BD Engineers, LLP [[693,3065,743,3109][9][,I,][Times New Roman]] [[1275,3065,1325,3109][9][,I,][Times New Roman]] [[1880,3065,2210,3109][9][,I,][Times New Roman]]Adirondack Winery [[2176,3065,2226,3109][9][,I,][Times New Roman]] [[2326,3065,2376,3109][9][,I,][Times New Roman]] [[375,3108,425,3152][9][,I,][Times New Roman]]5 [[394,3108,482,3152][9][,I,][Times New Roman]]214 [[448,3108,501,3152][9][,I,][Times New Roman]]A [[473,3108,523,3152][9][,I,][Times New Roman]]- [[485,3108,586,3152][9][,I,][Times New Roman]]SMR [[558,3108,608,3152][9][,I,][Times New Roman]] [[2069,3108,2182,3152][9][,I,][Times New Roman]]Page [[2158,3108,2208,3152][9][,I,][Times New Roman]]2 Post Area 1B is 0.36 acres and consists of existing rooftop, existing pavement, proposed rooftop, proposed pavement, gravel, and grass areas. Runoff drains to Infiltration Basin 1B. The peak runoff rates to the basin for the 1, 10, 50 and 100-year storm events are 0.14 cfs, 0.53 cfs, 0.80 cfs, and 1.37 cfs respectively with a time of concentration of 16 minutes and a CN value of 72. The required 100-year storage volume is ______± cubic feet and the basin provides _______± cubic feet. The entire 100-year storm infiltrates and there is no discharge to Waters of the United State or a municipal storm sewer system. Post Area 1C is 0.09 acres and consists of proposed pavement, and grass areas. Runoff drains toInfiltration Basin 1C. The peak runoff rates to the basin for the 1, 10, 50 and 100-year storm events are 0.00 cfs, 0.00 cfs, 0.02 cfs, and 0.06 cfs respectively with a time of concentration of 6 minutes and a CN value of 42. The required 100-year storage volume is 2± cubic feet and the basin provides 1,483± cubic feet. The entire 100- year storm infiltrates and there is no discharge to Waters of the United State or a municipal storm sewer system. S UMMARY Peak Runoff Generated (cfs)Peak Discharge (cfs) D.A. 1 1-Year10-Year50-Year100-Year1-Year10-Year50-Year100-Year Pre 10.000.512.523.970.000.000.000.00 Total Pre0.000.512.523.970.000.000.000.00 Post 1A0.702.575.046.530.000.000.000.00 Post 1B0.140.530.801.370.000.000.000.00 Post 1C0.000.000.020.060.000.000.000.00 Total Post0.843.105.867.960.000.000.000.00 [[531,2274,771,2323][10][,I,][Times New Roman]]Net Change [[834,2274,938,2323][10][,I,][Times New Roman]]0.84 [[1027,2274,1131,2323][10][,I,][Times New Roman]]2.59 [[1220,2274,1324,2323][10][,I,][Tim es New Roman]]3.34 [[1413,2274,1517,2323][10][,I,][Times New Roman]]3.99 [[1606,2274,1710,2323][10][,I,][Times New Roman]]0.00 [[1799,2274,1903,2323][10][,I,][Times New Roman]]0.00 [[1992,2274,2096,2 323][10][,I,][Times New Roman]]0.00 [[2185,2274,2289,2323][10][,I,][Times New Roman]]0.00 Peak Runoff Generated (cfs)Peak Discharge (cfs) D.A. 2 1-Year10-Year50-Year100-Year1-Year10-Year50-Year100-Year Total Pre0.000.000.010.050.000.000.010.05 Total Post0.000.000.000.000.000.000.000.00 [[531,2588,771,2637][10][,I,][Times New Roman]]Net Change [[834,2588,938,2637][10][,I,][Times New Roman]]0.00 [[1027,2588,1131,2637][10][,I,][Times New Roman]]0.00 [[1214,2588,1331,2637][10][,I,][Tim es New Roman]]-0.01 [[1408,2588,1525,2637][10][,I,][Times New Roman]]-0.05 [[1606,2588,1710,2637][10][,I,][Times New Roman]]0.00 [[1799,2588,1903,2637][10][,I,][Times New Roman]]0.00 [[1987,2588,2104,2637][10][,I,][Times New Roman]]-0.01 [[2180,2588,2297,2637][10][,I,][Times New Roman]]-0.05 [[372,3065,425,3109][9][,I,][Times New Roman]]A [[396,3065,721,3109][9][,I,][Times New Roman]]BD Engineers, LLP [[693,3065,743,3109][9][,I,][Times New Roman]] [[1275,3065,1325,3109][9][,I,][Times New Roman]] [[1880,3065,2210,3109][9][,I,][Times New Roman]]Adirondack Winery [[2176,3065,2226,3109][9][,I,][Times New Roman]] [[2326,3065,2376,3109][9][,I,][Times New Roman]] [[375,3108,425,3152][9][,I,][Times New Roman]]5 [[394,3108,482,3152][9][,I,][Times New Roman]]214 [[448,3108,501,3152][9][,I,][Times New Roman]]A [[473,3108,523,3152][9][,I,][Times New Roman]]- [[485,3108,586,3152][9][,I,][Times New Roman]]SMR [[558,3108,608,3152][9][,I,][Times New Roman]] [[2069,3108,2182,3152][9][,I,][Times New Roman]]Page [[2158,3108,2208,3152][9][,I,][Times New Roman]]3 Runoff Volume (cf) D.A. 1 1-Year10-Year50-Year100-Year Pre 10000 Total Pre0000 Post 1A0000 Post 1B0000 Post 1C0000 Total Post0000 [[874,731,1102,778][10][,I,][Times New Roman]]Net Change [[1181,731,1231,778][10][,I,][Times New Roman]]0 [[1363,731,1413,778][10][,I,][Times New Roman]]0 [[1545,731,1595,778][10][,I,][Times New Roman]]0 [[1727,731,1777,778][10][,I,][Times New Roman]]0 Runoff Volume (cf) D.A. 2 1-Year10-Year50-Year100-Year Total Pre010136260 Total Post0000 [[869,1028,1099,1076][10][,I,][Times New Roman]]Net Change [[1179,1028,1229,1076][10][,I,][Times New Roman]]0 [[1348,1028,1431,1076][10][,I,][Times New Roman]]-10 [[1521,1028,1625,1076][10][,I,][Time s New Roman]]-136 [[1705,1028,1809,1076][10][,I,][Times New Roman]]-260 The total runoff generated from the proposed construction activity will be contained within infiltration areas up to the 100-year storm event and there is no discharge to Waters of the United States or a municipal storm sewer system. The stormwater management plan will meet the needs of the project and the Town of Queensbury. The stormwater management plan will function adequately and will not adversely affect adjacent or downstream properties. ____________________________________ Luigi A. Palleschi, P.E. [[372,3065,425,3109][9][,I,][Times New Roman]]A [[396,3065,721,3109][9][,I,][Times New Roman]]BD Engineers, LLP [[693,3065,743,3109][9][,I,][Times New Roman]] [[1275,3065,1325,3109][9][,I,][Times New Roman]] [[1880,3065,2210,3109][9][,I,][Times New Roman]]Adirondack Winery [[2176,3065,2226,3109][9][,I,][Times New Roman]] [[2326,3065,2376,3109][9][,I,][Times New Roman]] [[375,3108,425,3152][9][,I,][Times New Roman]]5 [[394,3108,482,3152][9][,I,][Times New Roman]]214 [[448,3108,501,3152][9][,I,][Times New Roman]]A [[473,3108,523,3152][9][,I,][Times New Roman]]- [[485,3108,586,3152][9][,I,][Times New Roman]]SMR [[558,3108,608,3152][9][,I,][Times New Roman]] [[2069,3108,2182,3152][9][,I,][Times New Roman]]Page [[2158,3108,2208,3152][9][,I,][Times New Roman]]4 EXHIBIT 1: SITE LOCATION MAP EXHIBIT 2: PRE-DEVELOPMENT DRAINAGE MAP EXHIBIT 3: POST-DEVELOPMENT DRAINAGE MAP APPENDIX A: STORMWATER CALCULATIONS ìê÷ø÷æ÷ðíìï÷îè é é ìê÷ ìê÷ ì ðíåìíóîè ìíéèø÷æ÷ðíìï÷îè ééé ìíéè ûìíéè úìê÷ ù ì óîöóðèêûèóíî ûóîöóðèêûèóíî ù êÍÇÈÓÎÕøÓÛÕÊÛÏÖÍÊ ûôÃØÊÍùûøé ðÓÎÑ ìÍÎØ ê×ÛÙÔ éÇÚÙÛÈ ìÊ×ÌÛÊ×ØÚÃûúø÷ÎÕÓÎ××ÊÉððì ôÃØÊÍùûøŽ   É Î  “ ÅÛÊ×éÍÐÇÈÓÍÎÉððù èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ  èÃÌ×óó ÔÊ ã÷ûêêÛÓÎÖÛÐÐÿ