Transmittals s
FILE COPY LETTER OF TRANSMITTAL
To: Town of Queensbury Date: April 12,2019
Building Office Project No.: 02-19-24403
742 Bay Road Re: Walmart 4403
Queensbury,NY 12804 24 Quaker Ridge Blvd
Attn: Kate Deck Queensbury, NY 12804
Phone: 518-761-8256 Subject: WALMART
Please find the following information for your use with the above referenced project. If you have any questions or need additional
information please contact me.
Copies Description
2 Full Size Current Sets
2 Narrative's Plan Revision 1-CCD2
If enclosures are not as noted please notify our office immediately.
Sincerely,
Leticia Martinez
Permitting Coordinator _
Ext.263
leticia.martinezc(r�.hfa-ae.com V
AY 2 9 2019
TO BUILDING RC
N ODES
UPS
WAL-MART STORES, INC. STORE NO. 4403 PR1
Y iPROJECT: QUEENSBURY, NY DOC. DATE: 1/17/19
PROJECT NO. 02-19-24403
NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before
beginning the Work defined in this Plan Revision 1. If applicable, adjustment to the Contract Sum may
be based only on the method described in 7.3.3.1 of the Contract.
SCOPE: The scope of this Plan Revision 1 is to revise the originally issued contract documents of
Queensbury, NY dated 12/10/19, and all subsequent contract modifications, to reflect the following:
SUMMARY:
• Electrical revision due to REOR circuit change
• Clarify ceiling scope of work in new site to store storage room
• SIS Plan received 1/10/19
• Pre Order Copy received 1/11119
• Revised ID received 1/11/19
SPECIFICATIONS
SECTION 00010—TABLE OF CONTENTS
1. Added Division 2.1 —Civil Site Construction notation to include Civil specs
2. Added section 10732
SECTION 01700—EXECUTION REQUIREMENTS
1. Under Site Verification Requirements
a. Added the following notes; 4, 5, 8, 9 and 10
SECTION 08110—STEEL DOOR AND FRAMES
1. Revised section to include OGP exterior door notes
SECTION 08710—DOOR HARDWARE - ( 9 E
2. Revised section to include OGP exterior door L) �� I
3. Added the following door; 918B nl
U
I
SECTION 08800—GLAZING
1. Revised section to include OGP exterior door notes TOWN OF QUEENSBURY
BUILDING&CODES
SECTION 10732—PICKUP CANOPY
1. Added entire section to set
SECTION Appendix A—INDEX OF SECTIONS
1. Added section 10732—Pickup Canopy
SECTION Appendix A—OWNER SUPPLIED ITEMS
1. Revised section 08110—Steel Door and Notes
a. Revised section to include OGP exterior door notes
2. Revised section 08710—Door Hardware
a. Revised section to include OGP exterior door notes
b. Under 2.5 Hardware Schedule—added door 91813-Hallway for OGP exterior door
3. Revised section 08800—Glazing
a. Revised section to include OGP exterior door notes
b. Under 2.11 Glass Schedule—added OGP exterior door note(pre-glazed by supplier)
4. Added section 10732—Pickup Canopy
a. Added entire section to set
Page 1 of 5
r
WAL-MART STORES, INC. STORE NO. 4403 PR1
-PROJECT: QUEENSBURY, NY DOC. DATE: 1/17/19
PROJECT NO. 02-19-24403
ARCHITECTURAL
SHEET C1 -COVER SHEET
DRAWING INDEX
1. Added new sheet A3.1 -Fabric Curved Canopy and Details.
2.Added new sheet R5.1 -Refrigeration Submittals.
3. Added new sheet S2-Fabric Canopy Structural Plan and Details.
BUILDING CODE SUMMARY
1. Added note to show"All Wood not used as Finish Material must be Fire-Retardant-Treated Wood."
SHEET N1 -GENERAL INFORMATION
SITE VERIFICATION REQUIREMENTS
1. Added Contractor requirement Notes 4, 5, 8, 9, & 10 per OGP Canopy.
SHEET D1 -DEMOLITION PLAN
PLAN 1 -DEMOLITION PLAN
1. Revised plan to remove existing Live Fish display and cap existing plumbing with associated notation.
SHEET A2- EXTERIOR ELEVATIONS
ELEVATION 1 - FRONT ELEVATION
1. Revised Lawn &Garden signage from 2'-6"to 2'-0"with associated notation.
SHEET A2.1 -EXTERIOR SIGNAGE
NEW SIGNAGE SCHEDULE
1. Revised Lawn &Garden signage from 2'-6"to 2'-0"with 29.14 SF.
2. Revised Bldg Signage Total SF to 372.12
3. 2'-0" Grocery& Pharmacy 40.80 SF; 2'-0" Home & Living 31.23 SF; 2'-6" Pickup w/4'-5'h" Spark
38.69 SF; 2'-0"Lawn &Garden 29.14 SF; and V-0"Vision Center 7.42 SF signage have revised SF to
meet AHJ signage variance. No change in actual signage rqmts, only revised area cals for signage SF.
DETAIL 3-2'-0" GROCERY&PHARMACY
1. Dashed & Revised area calc to 40.80 SF.
DETAIL 4-2'-0" HOME & LIVING
1. Dashed & Revised area cal to 31.23 SF.
DETAIL 5- V-0"VISION
1. Dashed &Revised area calc to 7.42 SF.
DETAIL 6-2'-0" LAWN &GARDEN
1. Dashed & Revised area calc to 29.14 SF.
DETAIL 9- BUILDING SIGNAGE 2'-6"
1. Dashed &Revised area calc to 38.69 SF.
SHEET A3.1 -FABRIC CURVED CANOPY AND DETAILS
1. Added entire Sheet to set
SHEET A5-ENLARGED PLANS, ELEVATIONS, AND DETAILS
PLAN 2-COURTSEY DESK FLOOR PLAN
Page 2 of 5
WAL-MART STORES, INC. STORE NO. 4403 PR1
PROJECT: QUEENSBURY, NY DOC. DATE: 1/17/19
PROJECT NO. 02-19-24403
1. Revised plan to show hatch area of new ceiling ACT2 to match existing at +12'-0"AFF with associated
notation.
SHEET A6—REAR OFFICE PLAN
DETAIL 5—LOCKER BASE AND TOP
1. Revised note to show exist metal stud partition.
2. Revised note Blocking to be FRTW—Fire-Resistant-Treated Wood.
SHEET A8—DOOR SCHEDULE AND FINISHES
DOOR AND FRAME SCHEDULE
1. Added new OGP Door 918B Hallway—Door Type G to replace w/one new leaf. Ref 1/GA1.
DOOR SCHEDULE NOTES
1. Revised the following notes, 31, 32, and 35 to include GC to purchase and coordinate installation of
security film from NGS.
2. Added note 38 for prefin door and hdw to be installed by vendor.
DOOR AND FRAME SCHEDULE—DOOR SCHEDULE NOTES
1. Door 300G Pharmacy to have Security Film Full Frost w/cut in mortar/pestle logo—Product
#NGS-WRX-FR-S. Note 31
2. Door 303B Health Service Room to have Security Film Full Frost—Product#NGS-HSR-FS-S. Note 35
3. Door 303C Health Service Room to have Security Film Half Frost—Product#NGS-HSR-HF-S. Note 32
DETAIL 1 —DOOR TYPES
1. Added Door Type G—Half Glass.
DETAIL 2—FRAME TYPES
1. Added Frame Type 4— HM-STL Pair.
DETAIL 10—OGP DOOR TYPE OPTION
1. Added new Detail 10 for OGP Door.
SHEET GA1 —FRONT GROCERY PLAN
EQUIPMENT LEGEND—REFRIGERATED AND HOT CASES
1. Revised RD4018.442 Model number to DX6LN produce reach down refrig.
2. Revised Refrigeration Feed T&B for the following cases;
1. RD2006.642
2. RD3000.142
3. RD4018.052
4. RD4018.442
5. RD4018.742
6. RH0101.000
SHEET GA2—REAR GROCERY PLAN
PLAN 1 —REAR GROCERY FLOOR PLAN
1. Added new OGP Door 918E Hallway w/exist frame. Replace HM-STL Pair Door to New. Ref 10-A8.
MECHANICAL
SHEET MP1 -MECHANICAL AND PLUMBING PLAN
PLAN 1 —MECHANICAL AND PLUMBING PLAN
1. Added callout for 4/P1.
Page 3 of 5
WAL-MART STORES, INC. STORE NO. 4403 PR1
•PROJECT: QUEENSBURY, NY DOC. DATE: 1/17/19
PROJECT NO. 02-19-24403
SHEET P1 —ENLARGED PLUMBING PLANS
PLAN 4—PET WALL PLUMBING PLAN
1. Added plan to sheet.
ELECTRICAL
SHEET E1 —LIGHTING PLAN
PLAN 1 —LIGHTING PLAN
1. Added callout for detail 8/E1.1
SHEET E1.1 —ENLARGED LIGHTING PLANS AND SCHEDULES
PLAN 7—PARTIAL ONE-LINE DIAGRAM
1. Added detail to sheet
PLAN 8—CANOPY LIGHTING PLAN
1. Added detail to sheet
SHEET E2—POWER PLAN
PLAN 1 —POWER PLAN
1. Revised extents of callout 4/E2.1
2. Revised extents of callout 3/E2.2
3. Revised extents of Power Zone 9
4. Added the following power drops to Power Zone 9
a. (1) 10B
5. Added new Power Zone 12 and the following drops
a. (1)07B
6. Added power for(1) CCTV in customer service
7. Added SOW for removal of Live Fish Display
KEYNOTE SCHEDULE
1. Added keynote 16.666 to schedule
2. Added keynote 16.689 to schedule
SHEET E2.1 —ENLARGED POWER PLANS
PLAN 4—COSMETICS POWER PLAN
1. Relocated Power Zone 3 and the following power drops
a. (5)46E
SHEET E2.2—ENLARGED POWER PLANS
PLAN 1 —FRONT CHECKOUT POWER PLAN
1. Revised extents of Power Zone 1
2. Added the following power drops to Power Zone 1
a. (1)82B
PLAN 3—ELECTRONICS POWER PLAN
1. Revised extents of Power Zone 7
2. Added the following power drops to Power Zone 7
a. (1)05H
SHEET E4.1 —PANELBOARD SCHEDULES
PANELBOARD CH1A
1. Revised description of circuit 21 from SPARE to C-15 FANS
Page 4 of 5
WAL-MART STORES, INC. STORE NO. 4403 PR1
PROJECT: QUEENSBURY, NY DOC. DATE: 1/17/19
PROJECT NO. 02-19-24403
2. Revised wire size of circuit 19 to#12 AWG
PANELBOARD CH11-
1. Revised description of circuit 16 from SPARE to C-15 LIGHTS
2. Revised wire size of circuit 18 to#12 AWG
BUSWAY BL1 B
1. Revised description of circuit 18 from SPARE to 05H CORD REEL
SHEET RE1 —FRONT REFRIG ELECTRICAL PLANS
DETAIL 1 — FRONT REFRIGERATION ELECTRICAL PLANS
1. Revised circuitry for refrigeration circuit C-4
2. Added new circuitry for new refrigeration circuit C-15
REFRIGERATION
REF DC ENGINEERING— PR#1 NARRATIVE
STRUCTURAL
REF WALLACE— PR#1 NARRATIVE
End of Plan Revision#1
By: Harrison French &Assoc. (TD)
Page 5 of 5
WAL-MART STORES, INC. STORE NO. 4403 JANUARY 17, 2019
PROJECT: QUEENSBURY, NY PLAN REVISION #1
PROJECT NO. 1812446.01
STRUCTURAL
SHEET S2— FABRIC CANOPY STRUCTURAL PLAN AND DETAILS
1. ENTIRE SHEET ADDED
SHEET FXS1 —FIXTURE ANCHORAGE PLAN AND NOTES
DETAIL 1 — FIXTURE ANCHORAGE PLAN
1. REVISED FIXTURE LAYOUTS
Page 1 of 1
Fr
OC ENGINEERING
WALMART STORE #: 4403 JANUARY 17, 2019
QUEENSBURY, NEW YORK PLAN REVISION #ONE
JOB #:02-19-24403
This Plan Revision is an integral part of the Contract Documents and shall be treated as such.
SCOPE: This Plan Revision is to revise the previously issued documents of QUEENSBURY,
NEW YORK- #4403, to reflect the following changes:
Revisions per client directive.
JANUARY 17, 2019
•WALMART STORE #: 4403 PLAN REVISION #ONE
QUEENSBURY, NEW YORK JOB #02-19-24403
MECHANICAL/ELECTRICAL/PLUMBING
Sheet R1 -REFRIGERATION PLANS
Item #1: Changed Service Deli Lineup and associated piping
Sheet R2-REFRIGERATION PLANS
Item #1: Changed MTD-18 case to DX61-N
Item #2: Changed Rack C piping schedule
Sheet R3-REFRIGERATION SCHEDULES
Item #1: Changed MTC-4 from 24' to 16' and all associated data
Item #2: Added MTC-15
Item #3: Changed Rack MTC total load
Item #4: Added note to Rack MTC Schedule for compressor change out
Sheet R4-REFRIGERATION DETAILS
Item #1: Added Detail #6
Sheet R5-REFRIGERATION SUBMITTALS
Item #1: Added OEM Submittals to sheet
Sheet R5.1 - REFRIGERATION SUBMITTALS
Item #1: Added sheet to set
Sheet REM - REFRIGERATION ENERGY MANAGEMENT PLANS
Item #1: Changed MTC-04 to MTC-15
Sheet REM2-REFRIGERATION ENERGY MANAGEMENT SCHEDULES AND DETAILS
Item #1: Removed MTC-04 from Detail 1
Item #2: Added MTC-15 to Detail 1
Item #3: Changed Defrost schedule to reflect service deli correction
WAL-MART STORES, INC. STORE NO. 4403 ADD#1
PROJECT: QUEENSBURY, NY DOC. DATE: 2/5/19
PROJECT NO. 02-19-24403
NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before
beginning the Work defined in this Addendum. If applicable, adjustment to the Contract Sum may be
based only on the method described in 7.3.3.1 of the Contract.
SCOPE: The scope of this Addendum is to revise the originally issued contract documents of
Queensbury, NY dated 12/10/19, and all subsequent contract modifications, to reflect the following:
SUMMARY:
• Add civil plans to set for OGP canopy(no charge)
• Update specs per IFTI report received 1/17119(no charge)
• Comments received on 1114119 from SSI regarding joint filler replacement and ICC coloring agent
(no charge)
• Update OGP canopy foundation details based on final design of canopy by Hendee (we are
waiting to hear from Wallace if they have fees for this)
SPECIFICATIONS
SECTION 03314—CAST-IN-PLACE CONCRETE SLABS (INTERIOR)
1. Under section 2.6 Chemical Admixtures
a. Revised color admixture to: Integral color(Liquid Coloring Agent)—Color Flo Liquid Color
Fawn Pebble by Solomon Colors.
ARCHITECTURAL
SHEET C1—COVER SHEET
DRAWING INDEX
1. Added Civil Sheets to set, C-1, C-2
SHEET
1. Added Civil Consultant information to sheet
SHEET A1.1— FLOOR FINISH PLAN
DETAIL 1 —FLOOR FINISH PLAN
1. Revised joint filler note and revised joint filler amount
SHEET A2— EXTERIOR ELEVATIONS
DETAIL 1 —FRONT ELEVATION
1. Removed P126 SOW from elevation
DETAIL 2—LEFT ELEVATION
1. Removed P126 SOW from elevation
STRUCTURAL
SHEET S2—FABRIC CANOPY STRUCTURAL PLAN AND DETAILS
DETAIL 1 — FABRIC CANOPY FOUNDATION PLAN
1. REMOVED NOTE#1 IN NOTES TO CONTRACTOR
DETAIL 2—CANOPY FOUNDATION DETAIL
1. REVISED PIER DEPTH PER CANOPY MANUF'S SUBMITTAL
Page 1 of 2
WAL-MART STORES, INC. STORE NO. 4403 ADD#1
PROJECT: QUEENSBURY, NY DOC. DATE: 2/5/19
PROJECT NO. 02-19-24403
CIVIL
SHEET C-1 —PICKUP STRIPING AND SIGNAGE EXHIBIT
DETAIL—Sheet
1. Added entire sheet to set
SHEET C-2—SPECIFICATIONS SHEET
DETAIL—Sheet
1. Added entire sheet to set
End of Addendum#1
By: Harrison French &Assoc.
Page 2 of 2
WAL-MART STORES, INC. STORE NO. 4403 FEBRUARY 5, 2019
*PROJECT: QUEENSBURY, NY ADDENDUM#1
PROJECT NO. 1812446.02
STRUCTURAL
SHEET S2—FABRIC CANOPY STRUCTURAL PLAN AND DETAILS
DETAIL 1 — FABRIC CANOPY FOUNDATION PLAN
1. REMOVED NOTE#1 IN NOTES TO CONTRACTOR
DETAIL 2—CANOPY FOUNDATION DETAIL
1. REVISED PIER DEPTH PER CANOPY MANUF'S SUBMITTAL
Page 1 of 1
WAL-MART STORES, INC. STORE NO. 4403 CCD#1
PROJECT: QUEENSBURY, NY DOC. DATE: 03/14/19
PROJECT NO. 02-19-24403
NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before
beginning the Work defined in this Construction Change Directive. If applicable, adjustment to the
Contract Sum may be based only on the method described in 7.3.3.1 of the Contract.
SCOPE: The scope of this Construction Change Directive is to revise the originally issued contract
documents of Queensbury, NY dated 12110/19, and all subsequent contract modifications, to reflect the
following:
SUMMARY:
• Revised ID received 2/15/19(includes pharmacy scope reduction)
• Remove blue and gray color scheme; paint the building to match existing colors
SPECIFICATIONS
SECTION 00010—TABLE OF CONTENTS
1. Removed section 06620
2. Added section 06616
SECTION 06400—ARCHITECTURAL WOODWORK
1. Revised entire section notes to include Pharmacy wall cap specified by Owner and Separate
Contractor
SECTION 06616—SIMULATED STONE FABRICATIONS
1. Added entire spec section
SECTION 06620—SOLID SURFACING
1. Removed entire spec section from set
SECTION 08110—STEEL DOORS AND FRAMES
1. Revised entire section notes to remove Modular Pharmacy construction with doors and frames
furnished by Owner
SECTION 08710—DOOR HARDWARE
1. Revised entire section notes to remove Modular Pharmacy construction with doors and frames
furnished by Owner
2. Removed the following doors; 300G, 30313, 303C
SECTION 08800—GLAZING
1. Revised entire section notes to remove Modular Pharmacy construction with doors and frames
furnished by Owner
SECTION 09650—RESILIENT FLOORING
1. Revised spec section to remove LVT flooring notes
SECTION 10260—WALL AND CORNER GUARD
1. Revised entire section notes to remove Modular Pharmacy construction with doors and frames
furnished by Owner
2. Under section 2.4 Wall Guards, revise section to include Plastic wall guards at Pharmacy
SECTION Appendix A—OWNER SUPPLIED ITEMS
1. Revised section 08110—Steel Door and Notes
Page 1 of 5
WAL-MART STORES, INC. STORE NO. 4403 CCD#1
-PROJECT: QUEENSBURY, NY DOC. DATE: 03/14/19
PROJECT NO. 02-19-24403
a. Revised entire section notes to remove Modular Pharmacy construction with doors and
frames furnished by Owner
2. Revised section 08710—Door Hardware
a. Revised entire section notes to remove Modular Pharmacy construction with doors and
frames furnished by Owner
b. Removed the following doors; 300G, 303C, 303C
3. Revised section 08800—Glazing
a. Revised entire section notes to remove Modular Pharmacy construction with doors and
frames furnished by Owner
b. Under 2.11 Glass Schedule—removed Pharmacy doors and frames furnished by owner
4. Revised section 09650—Resilient Flooring
a. Revised spec section to remove LVT plank flooring notes
ARCHITECTURAL
SHEET C1 —COVER SHEET
DRAWING INDEX
1. Removed the following sheets:
a. PHM1
b. PHM2
c. PHM3
d. PHM4
e. PHM5
f. PHM5.1
g. PHM5.2
h. EPH1
2. Added the following sheets:
a. RXPFC
GENERAL SCOPE OF WORK
1. Revise Pharmacy SOW to paint, fix, and clean.
SHEET D1 —DEMOLITION PLAN
DETAIL 1 —DEMOLITION PLAN
1. Revised pharmacy callout reference to 1/RXPFC
SHEET Al —FLOOR PLAN
DETAIL 1 — FLOOR PLAN
1. Revised pharmacy callout reference to 2/RXPFC
SHEET A1.1 —FLOOR FINISH PLAN
DETAIL 1 — FINISH FLOOR PLAN
1. Revised plan to show the extents of new carpet at existing Pharmacy and removal of LVT tile.
STORE LAYOUT FLOOR FINISH LEGEND
1. Added Pickup for EC
2. Removed Heath Service LVT
3. Revised Pharmacy Carpet SQ.FT. and SQ.YDS quantities
4. Revised Wood Transition Strip LN.FT. quantity
5. Revised total SQ. FT. for PVC/LVT quantity
6. Added notes to legend
LEGEND
1. Removed Vinyl Tile— Luxury New hatch pattern
Page 2 of 5
WAL-MART STORES, INC. STORE NO. 4403 CCD#1
'PROJECT: QUEENSBURY, NY DOC. DATE: 03/14/19
PROJECT NO. 02-19-24403
SHEET A2—EXTERIOR ELEVATIONS
DETAIL 1 — FRONT ELEVATION
1. Revised finishes to match existing conditions.
DETAIL 2—REAR ELEVATION
1. Revised finishes to match existing conditions.
DETAIL 3—LEFT ELEVATION
1. Revised finishes to match existing conditions.
DETAIL 4— RIGHT ELEVATION
1. Revised finishes to match existing conditions.
DETAIL 5—VESTIBULE SIDE ELEVATION
1. Revised finishes to match existing conditions.
COLOR LEGEND
1. Revised finishes to match existing conditions.
MATERIAL LEGEND
1. Revised finishes to match existing conditions.
SHEET NOTES
1. Revised #8, #19 and added #20 to match existing conditions.
SHEET A8—DOOR SCHEDULE AND FINISHES
DOOR AND FRAME SCHEDULE
1. Removed Doors: 300G, 303B, 303C
DETAIL 1 —DOOR TYPES
1. Removed Door Type G1
SHEET RXPFC—PAINT, FIX, CLEAN (PFC), PLANS AND DETAILS
1. Added entire sheet to set
SHEET PHM1 —MODULAR PHARMACY PLANS, ELEVATIONS AND SCHEDULES
1. Removed entire sheet from set
SHEET PHM2—MODULAR PHARMACY SECTIONS AND DETAILS
1. Removed entire sheet from set
SHEET PHM3—PHARMACY EQUIPMENT(FOR REFERENCE ONLY)
1. Removed entire sheet from set
SHEET PHM4—PANEL PLAN
1. Removed entire sheet from set
SHEET PHM5—PHASING PLANS
1. Removed entire sheet from set
SHEET PHM5.1 —PHASING PLANS
1. Removed entire sheet from set
Page 3 of 5
WAL-MART STORES, INC. STORE NO. 4403 CCD#1
PROJECT: QUEENSBURY, NY DOC. DATE: 03/14/19
PROJECT NO. 02-19-24403
SHEET PHM5.2—PHASING PLANS
1. Removed entire sheet from set
FIRE PROTECTION
SHEET FP1 —FIRE SITE UTILITY PLAN AND GENERAL NOTES
PLAN 1 —OVERALL FIRE SITE UTILITY PLAN
1. Added callout where pharmacy SOW was removed
2. Added callout for new mother's room
SHEET FP2— ENLARGED FIRE SPRINKLER PLANS
PLAN 5—PHARMACY
1. Removed pharmacy SOW from sheet
PLAN 8—MOTHER'S ROOM
1. Added new mother's room to sheet
MECHANICAL
SHEET MP1 —MECHANICAL AND PLUMBING PLAN
PLAN 1 —MECHANICAL AND PLUMBING PLAN
1. Removed callout for 1/M1.
SHEET M1 —ENLARGED MECHANICAL PLANS
PLAN 1 —NOT USED
1. Removed plan from sheet
SHEET M2—MECHANICAL DETAILS AND SCHEDULES
FAN SCHEDULE
1. Removed note stating exhaust fans were owner furnished.
ELECTRICAL
SHEET E1 —LIGHTING PLAN
DETAIL 1 —LIGHTING PLAN
1. Removed detail callout for 1/EPH1: PHARMACY LIGHTING PLAN.
2. Relocated SOW to replace occupancy sensor in Pharmacy Toilet with single pole switch to detail
for clarification only.
3. Added SOW to replace broken light fixtures and lenses in Pharmacy.
SHEET E2— POWER PLAN
DETAIL 1 —POWER PLAN
1. Removed detail callout for 2/EPH1: PHARMACY POWER PLAN.
SHEET E4—ELECTRICAL DETAILS AND SCHEDULES
PANELBOARD LRX
1. Removed panel schedule from sheet.
SHEET E4.1 PANELBOARD SCHEDULES
PANELBOARD L2U
1. Removed panel schedule from sheet.
Page 4 of 5
WAL-MART STORES, INC. STORE NO. 4403 CCD#1
PROJECT: QUEENSBURY, NY DOC. DATE: 03/14/19
PROJECT NO. 02-19-24403
SHEET EM1 —ENERGY MANAGEMENT PLAN
DETAIL 1 — ENERGY MANAGEMENT PLAN
1. Removed SOW to relocated sensor S17 in Pharmacy.
SHEET EPH1 — PHARMACY ELECTRICAL PLANS
1. Removed sheet from construction set.
RACKING
SHEET FXS1 —FIXTURE ANCHORAGE PLAN AND NOTES
DETAIL—ANCHORAGE OF MATERIALS
1. Revised anchor and strap counts
DETAIL—SHELVING FIXTURE &ANCHORAGE SCHEDULE
1. Removed pharmacy fixture mark
DETAIL 1 — FIXTURE ANCHORAGE PLAN
1. Removed pharmacy fixture anchorage per RX-PFC scope
SHEET FXS2—FIXTURE ANCHORAGE DETAILS
DETAIL 7—NOT USED
1. Detail removed
End of Construction Change Directive#1
By: Harrison French &Assoc. (DRW)
Page 5 of 5
WAL-MART STORES, INC. STORE NO. 4403 CCD#2
'PROJECT: QUEENSBURY, NY DOC. DATE: 04/29/19
PROJECT NO. 02-19-24403
NOTE: The General Contractor shall obtain approval of the Wal-Mart Construction Manager before
beginning the Work defined in this Construction Change Directive. If applicable, adjustment to the
Contract Sum may be based only on the method described in 7.3.3.1 of the Contract.
SCOPE: The scope of this Construction Change Directive is to revise the originally issued contract
documents of QUEENSBURY, NY dated 12/10/18, and all subsequent contract modifications, to reflect
the following:
SUMMARY:
• RFFP rffp44030225 received 2/26/19
•Add OGP canopy light cut sheet per email from Doug Brewer on 4/1/19
•OC received 2/27/19
• Revise plans per planning board approval
ARCHITECTURAL
SHEET C1 —COVER SHEET
1. Add document to sheet
SHEET A1.1 —FLOOR FINISH PLAN
DETAIL 1 —FINISH FLOOR PLAN
1. Extend wood pad by 8'-0"
2. Revise dimensions to detail
STORE LAYOUT FLOOR FINISH LEGEND
1. Revise number count to legend
2. Add revision information to legend
SHEET A3.1 —FABRIC CURVED CANOPY AND DETAILS
DETAIL 1 —CANOPY SITE PLAN— HIGH WIND CATEGORY CURVED FABRIC
1. Revise detail to match civil plans
DETAIL 2-CANOPY ELEVATION—TENSILE STRENGTH CURVED FABRIC
1. Revise detail to match civil plans
ELECTRICAL
SHEET E1 —LIGHTING PLAN
PLAN 1 —LIGHTING PLAN
1. Revised detail callout from 8/E1.1 to 1/E1.2.
SHEET E1.1 —ENLARGED LIGHTING PLANS AND SCHEDULES
DETAIL 7—PARTIAL ONE-LINE DIAGRAM
1. Relocated detail to sheet E1.2
DETAIL 8—CANOPY LIGHTING PLAN
1. Relocated plan to sheet E1.2
SHEET E1.2—CANOPY LIGHTING PLANS
1. Added sheet to construction set.
Page 1 of 2
WAL-MART STORES, INC. STORE NO. 4403 CCD#2
PROJECT: QUEENSBURY, NY DOC. DATE: 04/29/19
PROJECT NO. 02-19-24403
SHEET E2—POWER PLAN
PLAN 1 —POWER PLAN
1. The following power drops have been added.
a. (2) 11 A
2. Added Power Zone#13 and the following power drops.
a. (1)08B
3. Added location of existing busway BL1A.
SHEET E2.2— ENLARGED POWER PLANS
PLAN 3—ELECTRONICS POWER PLAN
1. The following power drops have been added to Power Zone 7.
a. (3) 72M
KEYNOTE SCHEDULE
1. Added keynote 16.452 to the schedule.
SHEET E4— ELECTRICAL DETAILS AND SCHEDULES
PANELBOARD L1 D2
1. Revised description at circuit 38 from existing to exist busway bl1c.
SHEET E4.1 — PANELBOARD SCHEDULES
BUSWAY BL1A
1. Revised description at circuits 1, 5, 7, 10, 11, and 12 from existing to TV WALL.
2. Revised description at circuit 13 from existing to spare.
3. Revised description at circuits 15 and 17 from existing to SPARE.
4. Revised description at circuit 23 from SPARE to 08B DOG COOLER.
BUSWAY BL1C
1. Added schedule to sheet.
Construction Change Directive#2
By: Harrison French &Assoc. (NCR)
Page 2 of 2