Project Foothills Builders
Energy Code: 2015 IECC
Location: Glens Falls, New York
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,422 ft2
Glazing Area 9%
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
51 John Clendon Dr VISION Engineering, LLC
Lot 17 206 Glens Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801
Compliance: 0.9%Better Than Code Maximum UA: 233 Your UA: 231
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
44' i 3 �
�1- , 5` � � a� si��
F:Si�`^r•
+.��'".F� .�'�z'�
Ceiling 1: Flat Ceiling or Scissor Truss 1,422 38.0 0.0 0.030 43
Wall 1:Wood Frame, 16"o.c. 1,566 21.0 0.0 0.057 79
Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 102 0.290 30
Door 1: Solid 18 0.140 3
Door 2: Glass 40 0.290 12
Door 3: Solid 20 0.200 4
Wall 2:Wood Frame, 16" o.c. 32 21.0 0.0 0.057 1
Door 4: Solid 18 0.240 4
Basement Wall 1: Solid Concrete or Masonry 1,325 0.0 19.0 0.039 51
Wall height: 7.8'
Depth below grade: 6.8'
Insulation depth: 7.8'
Window 2:Vinyl/Fiberglass Frame:Double Pane 9 0.400 4
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 1 of10
2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
Compliance Statement: The proposed building design described here is 'stent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed buil ' g ha been designed to meet the 2015 IECC requirements in
RE check io 4.6.4 and to comply with the mandatory'requir9, ents lis- din the REScheck Ins ec ' Checklist.
`/?q
9
Name-Title Signat trr Date
illit c),L, : ,r-,--11 , w'
aka,
Project Title: Foothills Builders Report date: 07/05/18 .
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 2 of10
2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
REScheck 4
Software Version M .
Inspection Checklist
Energy Code: 2015 IECC
•
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
S6Olon
l._w Plans Verified:; Field;Verified .
#' I Premiiis a tron/Ptan:iReviON < a 6ies?: • r r m6i t5f ssurnptiotis
Value ttalue
103,1, Construction drawings and ❑Complies
Does Not
,103.2 :documentation demonstrate ���°%�°-�=�r�>>��=�•_`"%'"%�'��=�. • ❑
'[PR1]1 energy code compliance for the
;building envelope.Thermal :. ❑Not Observable,„
bservable
:envelope represented on ❑Not Applicable
construction documents. " `w}
103.1, :Construction drawings and ❑Complies
103.2, :documentation demonstrate ❑Does Not
403.7 energy code compliance for °"%_,s - ` ''
DI ot Observable
[PR3]1 :lighting and mechanical systems. %a- <' f✓ __•
:Systems serving multiple y ', , ::' ;❑Not Applicable
dwelling units must demonstrate
:compliance with the IECC `„,- _
:Commercial Provisions.
302:1,. . Heating and cooling equipment is° Heating: ' Heating: ❑Complies
4034: „ ;; sized per ACCA Manual S based Btu/hr Btu/hr =❑Does Not
[PR2]2" " on loads'calculated per ACCA : Cooling: Cooling: ;❑Not Observable
Manual J or other methods Btu/hr Btu/hr
approved by the code official. i❑Not Applicable
Additional Comments/Assumptions:
1!High Impact(Tier 1) 2`" Medium Impact(Tier 2) 3. Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 3 of10
2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
Plans Verified Field ltenfied-"
;' Foundatkin li�stigctianValue Ccarriplies? da liaet�tsfAescl iptic�ns
402.1.1 Conditioned basement wall R- R- ;❑Complies See the Envelope Assemblies
[F04]1 insulation R-value.Where interior; ;❑Does Not table for values.
insulation is used,verification R- R-
:may need to occur during ❑Not Observable
Insulation Inspection. Not 3❑Not Applicable
;required in warm-humid locations. •
in Climate Zone 3.
303.2 :Conditioned basement wall ' ':s❑Complies
[F05]1 insulation installed per .::. ❑Does Not
;, `manufacturer's instructions. k" .. ❑Not Observable
-: ~- - ;"$❑Not Applicable
402.2.9 :Conditioned basement wall ft ft ❑Complies ;See the Envelope Assemblies
[FO6]1 insulation: depth of burial or ±❑Does Not table; for values.
distance from top of wall. i
'❑Not Observable
❑Not Applicable
303.2.1.-a: A protective covering is installed - ❑Complies
[FQ11]?;• ,to protect exposed exterior > . ' ' • '❑Does Not
• insulation and extends a
` a minimum of 6 in. below grade. ❑Not Observable
❑Not Applicable
403`9• • Snow-and ice-melting system '- =F;-,. :'❑Complies
•
;,-;:"
[Fp12]2 controls installed. j' Does Not
".. ''': , ; •..i•.r:'.c#❑Not Observable
>::N; • . ..w.". " ., . • DNot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) '2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 4 of10
2018 No. 1312 -\1341 -DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
,
'
' �c� ^ !��
&meq�� Val~~ Val ~
402.1.1' oonrU4acm: u' U_ ___ Assemblies
402.3.4 � LJooesmot table m va
lues.
[pxz]z /
| | |[]motobsemaU|e
ns | | |[]motxpp|icab|e
402.1.1' 'Glazing U-factor(oma'weigkteU u' U____ LJCump|ies m Envelope Assemblies
40z3l' ave,age)� � |[]Doesmot �memrvame� �
402 3 3 ' �
4OZ3 §' -]Not Observable �
402.5 / LJwot4pp|icable
:are determined in accordance ',F]Does Not
'with the NFRC test procedure or
�E]Not Observable
Aaken from the default table.
!E]Not Applicable
'402.4.1.1 Air barrier and thermal barrier '."`��';E]Com plies
�E]Does Not
[FR23]1 ::installed per manufacturer's
!nNot Observable
E]Not Applicable
402.4.3 ::Fenestration that is not site built
[FR20]1 is listed and labeled as meeting DDoes Not
� ~ !
- has infiltration_ rates,_ - '- /
:400 that do not exceed code
:limits. ElComplies
E]Does Not
TR sealed at housing/interior finish
and labeled to indicate :52.0 cfm
','iE]Not Observable
leakage at 75 Pa.
E]Not Applicable
°"" ^ 1 Supply andreturn ducts". attics �UComplies �
]1 � �
3 inches in diameter and
E]Not Observable
R-6 where< 3 inches.Supply and;
Applicable
return ducts in other portions of
the building insulated °~ R-"for
'
for. ~ ,inches,.diameter. �
463.j,515 Building cavities are not used as
/
�
d-- - ---- |
,above 105 QF or chilled fluids E]Does Not
-below 55 LIF are insulated to �:R-
i[:]Not Observable
!E]Not Applicable
403.4.1 ::Protection of insulation on HVA
[FR2411 piping. E]Does Not
Not Observable �
! ! Applicable
' Hotwaterpipes are insulated to -
[rRlo� an.3. ooesmu,
motObsemaU|e
|LJmut^mp|icab|e
Automatic or g dampers are LJCompiies
!m�aUeuunaxoutuoora|r Elouesmot �
` intakes and exhausts. []wctOUservab|e | �
l -"'j[]motApp|ioab|e
l |High Impact(Tierl) `Z� Medium Impact(Tier2) 3'` Low Impact(Tier3)
Project Title: Foothills Builders Report date 07/05/18 �
Datafi|ename: [:\Users\DVVR kto pbox\V|S0N Engineering, LLC\ArchivePnojects\12 - Projects Page 5oflU
2OI8 No. l3l2 -\l54l ' DES ' FHB 5I John C|endonDr Lot l7\l34lRescheck.rck �
Additional Comments/Assumptions:
•
I 1 High Impact(Tier 1) 2' Medium Impact(Tier 2) 3: Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 6 of10
2018 No. 1312 -\1341 - DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
' r
'section
�# leld Verified
ElComplies
303,1' ,All installed insulation is labeled
Does
E]Not Observable
E]Not Applicable
402.1.1' mmU insulation n-value. If this is a n- ' n- See the Envelope Assemblies
402 2 5 U i��|����� U abe'o v =s
� � ' masswe � e �� VYood [� �uod ooesNot
40za § waUinsu|ationonthe�aU.z. [l mass [� �ass []motObsemab|e
[|N3] extehortheext horinsu|adun^^ ��e| [� S�e| []mut4pp|ieb|e
nequinementapp|iea(FRlO}. �
��^
]UIZ :waUinsu|abonisin�aUedper LJCompUes �
[|N*� ;manufatuners�s�ucUons. Does Not
motObservable
E]mot Applicable !
AdditionaUConmmments/Assmmmptimns:
�
�
�
�
�
�
| l|High Impact(rierl) Medium Impact(Tier 2) 1-3 Low impact(rier3)
Project Title: Foothills Builders Report date: 07/05/I8 �
Data filename: C:\Users\DVVR ktu pbox\V|SKON Engineering, LLC\Archke Pro ects��Z ' Projects Page 7 oflO
E5 5I� h C| d � Lot Res h k� k
2OlO No. l3l2 �l34I ' D ' FHB John en on r c ec rc �
�
�
r
Secbo� • :<.:• Plans,Verifsed FEelici YOifled 1 . ,
- # Final Inspectio 13rci rasooris aing�lies? Comments/Assumptions .
& Rachitt, iJal�€ 4falue
402.1.1, Ceiling insulation R-value. R- R- 10Complies See the Envelope Assemblies
402.2.1, El Wood ❑ Wood ;❑Does Not table for values.
402.2.2, i
i❑ Steel ❑ Steel ❑Not Observable
402.2.6
[FI1]1 j ;❑Not Applicable
303.1.1.1, Ceiling insulation installed per .:„•: ::Complies
303.2 manufacturer's instructions. ' -- f, ❑Does Not
[FI2]i Blown insulation marked every i :: : ?❑Not Observable
i300 ft2. i - 'r ;T;;., :,,',,,,%<;'_':-''
;,..f.,y r:`•,,,,,: ;❑Not Applicable
am' ;, ..
402.23•: .Vented attics with air permeable • w;v-_ 'w' ❑Complies
[F122]7 ;, .insulation include baffle adjacent ,,ay>w : ='<'❑Does Not
to soffit and eave vents that " ' `
over insulation. £'° ` •'` ': ;❑Not Observable
''',.: extends :g _. —"-''-. :•'`<;❑Not Applicable
402.2.4 ;Attic access hatch and door R- ' R- ❑Complies
[FI3]1 ;insulation R-value of the ❑Does Not
;adjacent assembly. •
•
['Not Observable
•
•❑Not Applicable
•
402.4.1.2 i Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies
[F117]1 :ach in Climate Zones 1-2, and ❑Does Not
t<=3 ach in Climate Zones 3-8. ['Not Observable
•
••
❑Not Applicable
403.2.3 :Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[FI4]1 :cfm/100 ft2 across the system or ; ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in ❑Not Observable
:tests,verification may need to ❑Not Applicable
'occur
during Framing Inspection. :
403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies
[FI27]i :determine air leakage with : ft2 ft2 iDDoes Not
either: Rough-in test:Total
:leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
:w.g.across the system including
:the manufacturer's air handler
`:enclosure if installed at time of
!test. Postconstruction test:Total
:leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
:including the manufacturer's air
:handler enclosure.
403.3.2.1 :Air handler leakage designated ;-.;�❑Complies
[FI24]i by manufacturer at<=2%of :y` ;"z N❑Does Not
`design airflow. -
❑Not Observable
:;... ,❑Not Applicable
403.1.1. '.Programmable thermostats ;t:'= {❑Complies
fF19] •,installed for control of primary £; ,,!, ,, -' `s p; ; <`5`" l❑Does Not
heatingiand coolingsystems and c '- :>�> �-_- :':
Y r,,..,,. ;
: ❑Not Observable
;initially set by manufacturer to '.�� •;;,�,. °-'`�
, :.' v,,*,,,,.• ,❑Not Applicable
code specifications. �;.r•. i I
403.1,2.N Heat pump thermostat installed •s.�'
;❑Complies
[F 1012 -'on heat pumps. •' : -:❑Does Not
EINot Observable
- .-. :❑Not Applicable
03;5,1::`.4. ,,Circulatingservice hot water J❑Com lies
[FI11 2. :,i, systems= have automatic or ; ❑Does Not
;accessible manual controls. `•I
':`' -•` ' `:' Not Observable
,2•,'.:,:,,,, ,: -'7 :❑Not Applicable
1 High Impact(Tier 1) 1.Z, Medium Impact(Tier 2) 3;, Low Impact(Tier 3) •
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 8 of10
2018 No. 1312 -\1341 - DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
. ^
Sdctlon
ssump tons
Value
E]Com plies
All mechanical ventilation system ""'
fans not �urtes��and listed
�
HVAC equipment meet efficacy
Observable
and air flow limits,
Not
--A,''--- �
boilers �
Ig
""through one-or two-pipe heatir E]Does Not
have �
=,"=..= �
� control to concm/ �
! ;temperature- -'- -- '--
basedonoutduur �
-temperature.
'40I6I.1 Heated water circulation systemsMcomplies
��8� .�haveadrc circulation The
�
�
returnObservable I
system return pipe is a dedicated
_ pipe or a cold water supply� �
pp`^' ~`' '
� sypnonurcu/aoon systemsane �
not present.Controls for
circulating hot water system i,
' pumps start the pump with signal
' fon�t water demand w�hnthe
occupancy. Controls
automatically turn off the pump
when water isin circulation loop `
is set-point temperature and
no demand for hot water exists.
trace systems
'E]Does Not
[ comply with IEEE 515.1 orUL
:515.Controls automatically _lNot Observableadjust the energy input to the
'E]Not Applicable
heat tracing to maintain the
-i desired water temperature in the
-_~.
Water distribution systems that 'E]Does Not
have recirculation pumps that
pu m p water from heated waterE]Not Observable
UNot Applicable
�
supply pipe back to the heated
watersvv,cethmughaco|d
,water su have a
�'demand recirculation water
sys�xn. Pumps have controls
|that manage operation of the �!pump and limit the temperature �
` of the water enter the cold
water piping to
4015.4 Drain water heat recovery units
1355.1. Potable water-sid
e
?E]Not Observable
.'1preaue|ssuf drain water heat ;E]Not Applicable
' recovery units 3 psi for
' -individual units connected toone
or two showers. Potable watep /
' `s�e pressure�ssufdrain water '
heat recovery units< 2 psi for
i individual units connected ~
� '� ^zzcnreeor more showers.
4041 i75%uf lamps in permanent
[R611 'fixtures or 75%of permanent E]Does Not
::fixtures have high efficacy lamps.'ooesnucapp|yto|ow�o|tage ^~N-' --- -able
�lighting. []m��App|icaU|e
:Fuel lighting have
[]Comp|ies
tf
'''noco,�iououspxc�nnx� �looesmuc |
,,~ o
[]mutoUsemab|e
El
Not �
�
�
' I/High Impact(TierI) �2 Medium Impact(TierZ) 3 Low Impact(Tier3)
Project Title: Foothills Builders Report date: 07/05/18
Datafi|ename: C:\Users\DVVRDesktop\Dno |ON Engineering, LLC\Ar hivePnojects\lZ ' Projyts Page 9ofl0 �
Z0l8 No. I3I2 -\l34l - DES' FHB 5l John C|endonDr Lot l7\l34IRescheck.ok �
�
e�ticnra' plans � rif�ed :Field Vgiified
# Ficaal Inspection Pro�risiian Value •
s ' Comp�ies? Comments/Assiinapticsns.,
Req.FD-
llaiu .
401:3 Compliance certificate posted. - „❑Complies
[07]2. : •• ,`j❑Does Not
$, %k❑Not Observable
z> ❑Not Applicable
303,3: :',1 Manufacturer manuals for i<' ''' ;❑Complies
(FI10 mechanical and water heating P ,3`y.•.-;r •>" )❑Does Not
systems have been provided. Y-
,:_ ;❑Not Observable
<`• ❑Not Applicable
Additional Comments/Assumptions:
•
1 High Impact(Tier 1) 2, Medium Impact(Tier 2) 3: Low Impact(Tier 3)
Project Title: Foothills Builders Report date: 07/05/18
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 10 of10
2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck
4. ertificate
Above-Grade Wall 21.00
Below-Grade Wall 19.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork(unconditioned spaces):
Window 0.29
Door 0.29
trItittg j.otni s" er k '
/s..a-r .. fir.' x..c °�`*a�:i Ss-sY,.a'.i.'�„ ...:
Heating System:
Cooling System:
Water Heater:
•