Loading...
ResCheck V � VersionREScheck Software i R 4 Compliance .Certificate Project Foothills Builders Energy Code: 2015 IECC Location: Glens Falls, New York Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 1,422 ft2 Glazing Area 9% Climate Zone: 6 (7635 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 51 John Clendon Dr VISION Engineering, LLC Lot 17 206 Glens Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 Compliance: 0.9%Better Than Code Maximum UA: 233 Your UA: 231 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies 44' i 3 � �1- , 5` � � a� si�� F:Si�`^r• +.��'".F� .�'�z'� Ceiling 1: Flat Ceiling or Scissor Truss 1,422 38.0 0.0 0.030 43 Wall 1:Wood Frame, 16"o.c. 1,566 21.0 0.0 0.057 79 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 102 0.290 30 Door 1: Solid 18 0.140 3 Door 2: Glass 40 0.290 12 Door 3: Solid 20 0.200 4 Wall 2:Wood Frame, 16" o.c. 32 21.0 0.0 0.057 1 Door 4: Solid 18 0.240 4 Basement Wall 1: Solid Concrete or Masonry 1,325 0.0 19.0 0.039 51 Wall height: 7.8' Depth below grade: 6.8' Insulation depth: 7.8' Window 2:Vinyl/Fiberglass Frame:Double Pane 9 0.400 4 Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 1 of10 2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck Compliance Statement: The proposed building design described here is 'stent with the building plans, specifications, and other calculations submitted with the permit application.The proposed buil ' g ha been designed to meet the 2015 IECC requirements in RE check io 4.6.4 and to comply with the mandatory'requir9, ents lis- din the REScheck Ins ec ' Checklist. `/?q 9 Name-Title Signat trr Date illit c),L, : ,r-,--11 , w' aka, Project Title: Foothills Builders Report date: 07/05/18 . Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 2 of10 2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck REScheck 4 Software Version M . Inspection Checklist Energy Code: 2015 IECC • Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. S6Olon l._w Plans Verified:; Field;Verified . #' I Premiiis a tron/Ptan:iReviON < a 6ies?: • r r m6i t5f ssurnptiotis Value ttalue 103,1, Construction drawings and ❑Complies Does Not ,103.2 :documentation demonstrate ���°%�°-�=�r�>>��=�•_`"%'"%�'��=�. • ❑ '[PR1]1 energy code compliance for the ;building envelope.Thermal :. ❑Not Observable,„ bservable :envelope represented on ❑Not Applicable construction documents. " `w} 103.1, :Construction drawings and ❑Complies 103.2, :documentation demonstrate ❑Does Not 403.7 energy code compliance for °"%_,s - ` '' DI ot Observable [PR3]1 :lighting and mechanical systems. %a- <' f✓ __• :Systems serving multiple y ', , ::' ;❑Not Applicable dwelling units must demonstrate :compliance with the IECC `„,- _ :Commercial Provisions. 302:1,. . Heating and cooling equipment is° Heating: ' Heating: ❑Complies 4034: „ ;; sized per ACCA Manual S based Btu/hr Btu/hr =❑Does Not [PR2]2" " on loads'calculated per ACCA : Cooling: Cooling: ;❑Not Observable Manual J or other methods Btu/hr Btu/hr approved by the code official. i❑Not Applicable Additional Comments/Assumptions: 1!High Impact(Tier 1) 2`" Medium Impact(Tier 2) 3. Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 3 of10 2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck Plans Verified Field ltenfied-" ;' Foundatkin li�stigctianValue Ccarriplies? da liaet�tsfAescl iptic�ns 402.1.1 Conditioned basement wall R- R- ;❑Complies See the Envelope Assemblies [F04]1 insulation R-value.Where interior; ;❑Does Not table for values. insulation is used,verification R- R- :may need to occur during ❑Not Observable Insulation Inspection. Not 3❑Not Applicable ;required in warm-humid locations. • in Climate Zone 3. 303.2 :Conditioned basement wall ' ':s❑Complies [F05]1 insulation installed per .::. ❑Does Not ;, `manufacturer's instructions. k" .. ❑Not Observable -: ~- - ;"$❑Not Applicable 402.2.9 :Conditioned basement wall ft ft ❑Complies ;See the Envelope Assemblies [FO6]1 insulation: depth of burial or ±❑Does Not table; for values. distance from top of wall. i '❑Not Observable ❑Not Applicable 303.2.1.-a: A protective covering is installed - ❑Complies [FQ11]?;• ,to protect exposed exterior > . ' ' • '❑Does Not • insulation and extends a ` a minimum of 6 in. below grade. ❑Not Observable ❑Not Applicable 403`9• • Snow-and ice-melting system '- =F;-,. :'❑Complies • ;,-;:" [Fp12]2 controls installed. j' Does Not ".. ''': , ; •..i•.r:'.c#❑Not Observable >::N; • . ..w.". " ., . • DNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) '2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 4 of10 2018 No. 1312 -\1341 -DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck , ' ' �c� ^ !�� &meq�� Val~~ Val ~ 402.1.1' oonrU4acm: u' U_ ___ Assemblies 402.3.4 � LJooesmot table m va lues. [pxz]z / | | |[]motobsemaU|e ns | | |[]motxpp|icab|e 402.1.1' 'Glazing U-factor(oma'weigkteU u' U____ LJCump|ies m Envelope Assemblies 40z3l' ave,age)� � |[]Doesmot �memrvame� � 402 3 3 ' � 4OZ3 §' -]Not Observable � 402.5 / LJwot4pp|icable :are determined in accordance ',F]Does Not 'with the NFRC test procedure or �E]Not Observable Aaken from the default table. !E]Not Applicable '402.4.1.1 Air barrier and thermal barrier '."`��';E]Com plies �E]Does Not [FR23]1 ::installed per manufacturer's !nNot Observable E]Not Applicable 402.4.3 ::Fenestration that is not site built [FR20]1 is listed and labeled as meeting DDoes Not � ~ ! - has infiltration_ rates,_ - '- / :400 that do not exceed code :limits. ElComplies E]Does Not TR sealed at housing/interior finish and labeled to indicate :52.0 cfm ','iE]Not Observable leakage at 75 Pa. E]Not Applicable °"" ^ 1 Supply andreturn ducts". attics �UComplies � ]1 � � 3 inches in diameter and E]Not Observable R-6 where< 3 inches.Supply and; Applicable return ducts in other portions of the building insulated °~ R-"for ' for. ~ ,inches,.diameter. � 463.j,515 Building cavities are not used as / � d-- - ---- | ,above 105 QF or chilled fluids E]Does Not -below 55 LIF are insulated to �:R- i[:]Not Observable !E]Not Applicable 403.4.1 ::Protection of insulation on HVA [FR2411 piping. E]Does Not Not Observable � ! ! Applicable ' Hotwaterpipes are insulated to - [rRlo� an.3. ooesmu, motObsemaU|e |LJmut^mp|icab|e Automatic or g dampers are LJCompiies !m�aUeuunaxoutuoora|r Elouesmot � ` intakes and exhausts. []wctOUservab|e | � l -"'j[]motApp|ioab|e l |High Impact(Tierl) `Z� Medium Impact(Tier2) 3'` Low Impact(Tier3) Project Title: Foothills Builders Report date 07/05/18 � Datafi|ename: [:\Users\DVVR kto pbox\V|S0N Engineering, LLC\ArchivePnojects\12 - Projects Page 5oflU 2OI8 No. l3l2 -\l54l ' DES ' FHB 5I John C|endonDr Lot l7\l34lRescheck.rck � Additional Comments/Assumptions: • I 1 High Impact(Tier 1) 2' Medium Impact(Tier 2) 3: Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 6 of10 2018 No. 1312 -\1341 - DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck ' r 'section �# leld Verified ElComplies 303,1' ,All installed insulation is labeled Does E]Not Observable E]Not Applicable 402.1.1' mmU insulation n-value. If this is a n- ' n- See the Envelope Assemblies 402 2 5 U i��|����� U abe'o v =s � � ' masswe � e �� VYood [� �uod ooesNot 40za § waUinsu|ationonthe�aU.z. [l mass [� �ass []motObsemab|e [|N3] extehortheext horinsu|adun^^ ��e| [� S�e| []mut4pp|ieb|e nequinementapp|iea(FRlO}. � ��^ ]UIZ :waUinsu|abonisin�aUedper LJCompUes � [|N*� ;manufatuners�s�ucUons. Does Not motObservable E]mot Applicable ! AdditionaUConmmments/Assmmmptimns: � � � � � � | l|High Impact(rierl) Medium Impact(Tier 2) 1-3 Low impact(rier3) Project Title: Foothills Builders Report date: 07/05/I8 � Data filename: C:\Users\DVVR ktu pbox\V|SKON Engineering, LLC\Archke Pro ects��Z ' Projects Page 7 oflO E5 5I� h C| d � Lot Res h k� k 2OlO No. l3l2 �l34I ' D ' FHB John en on r c ec rc � � � r Secbo� • :<.:• Plans,Verifsed FEelici YOifled 1 . , - # Final Inspectio 13rci rasooris aing�lies? Comments/Assumptions . & Rachitt, iJal�€ 4falue 402.1.1, Ceiling insulation R-value. R- R- 10Complies See the Envelope Assemblies 402.2.1, El Wood ❑ Wood ;❑Does Not table for values. 402.2.2, i i❑ Steel ❑ Steel ❑Not Observable 402.2.6 [FI1]1 j ;❑Not Applicable 303.1.1.1, Ceiling insulation installed per .:„•: ::Complies 303.2 manufacturer's instructions. ' -- f, ❑Does Not [FI2]i Blown insulation marked every i :: : ?❑Not Observable i300 ft2. i - 'r ;T;;., :,,',,,,%<;'_':-'' ;,..f.,y r:`•,,,,,: ;❑Not Applicable am' ;, .. 402.23•: .Vented attics with air permeable • w;v-_ 'w' ❑Complies [F122]7 ;, .insulation include baffle adjacent ,,ay>w : ='<'❑Does Not to soffit and eave vents that " ' ` over insulation. £'° ` •'` ': ;❑Not Observable ''',.: extends :g _. —"-''-. :•'`<;❑Not Applicable 402.2.4 ;Attic access hatch and door R- ' R- ❑Complies [FI3]1 ;insulation R-value of the ❑Does Not ;adjacent assembly. • • ['Not Observable • •❑Not Applicable • 402.4.1.2 i Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [F117]1 :ach in Climate Zones 1-2, and ❑Does Not t<=3 ach in Climate Zones 3-8. ['Not Observable • •• ❑Not Applicable 403.2.3 :Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [FI4]1 :cfm/100 ft2 across the system or ; ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable :tests,verification may need to ❑Not Applicable 'occur during Framing Inspection. : 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies [FI27]i :determine air leakage with : ft2 ft2 iDDoes Not either: Rough-in test:Total :leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable :w.g.across the system including :the manufacturer's air handler `:enclosure if installed at time of !test. Postconstruction test:Total :leakage measured with a pressure differential of 0.1 inch w.g. across the entire system :including the manufacturer's air :handler enclosure. 403.3.2.1 :Air handler leakage designated ;-.;�❑Complies [FI24]i by manufacturer at<=2%of :y` ;"z N❑Does Not `design airflow. - ❑Not Observable :;... ,❑Not Applicable 403.1.1. '.Programmable thermostats ;t:'= {❑Complies fF19] •,installed for control of primary £; ,,!, ,, -' `s p; ; <`5`" l❑Does Not heatingiand coolingsystems and c '- :>�> �-_- :': Y r,,..,,. ; : ❑Not Observable ;initially set by manufacturer to '.�� •;;,�,. °-'`� , :.' v,,*,,,,.• ,❑Not Applicable code specifications. �;.r•. i I 403.1,2.N Heat pump thermostat installed •s.�' ;❑Complies [F 1012 -'on heat pumps. •' : -:❑Does Not EINot Observable - .-. :❑Not Applicable 03;5,1::`.4. ,,Circulatingservice hot water J❑Com lies [FI11 2. :,i, systems= have automatic or ; ❑Does Not ;accessible manual controls. `•I ':`' -•` ' `:' Not Observable ,2•,'.:,:,,,, ,: -'7 :❑Not Applicable 1 High Impact(Tier 1) 1.Z, Medium Impact(Tier 2) 3;, Low Impact(Tier 3) • Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 8 of10 2018 No. 1312 -\1341 - DES - FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck . ^ Sdctlon ssump tons Value E]Com plies All mechanical ventilation system ""' fans not �urtes��and listed � HVAC equipment meet efficacy Observable and air flow limits, Not --A,''--- � boilers � Ig ""through one-or two-pipe heatir E]Does Not have � =,"=..= � � control to concm/ � ! ;temperature- -'- -- '-- basedonoutduur � -temperature. '40I6I.1 Heated water circulation systemsMcomplies ��8� .�haveadrc circulation The � � returnObservable I system return pipe is a dedicated _ pipe or a cold water supply� � pp`^' ~`' ' � sypnonurcu/aoon systemsane � not present.Controls for circulating hot water system i, ' pumps start the pump with signal ' fon�t water demand w�hnthe occupancy. Controls automatically turn off the pump when water isin circulation loop ` is set-point temperature and no demand for hot water exists. trace systems 'E]Does Not [ comply with IEEE 515.1 orUL :515.Controls automatically _lNot Observableadjust the energy input to the 'E]Not Applicable heat tracing to maintain the -i desired water temperature in the -_~. Water distribution systems that 'E]Does Not have recirculation pumps that pu m p water from heated waterE]Not Observable UNot Applicable � supply pipe back to the heated watersvv,cethmughaco|d ,water su have a �'demand recirculation water sys�xn. Pumps have controls |that manage operation of the �!pump and limit the temperature � ` of the water enter the cold water piping to 4015.4 Drain water heat recovery units 1355.1. Potable water-sid e ?E]Not Observable .'1preaue|ssuf drain water heat ;E]Not Applicable ' recovery units 3 psi for ' -individual units connected toone or two showers. Potable watep / ' `s�e pressure�ssufdrain water ' heat recovery units< 2 psi for i individual units connected ~ � '� ^zzcnreeor more showers. 4041 i75%uf lamps in permanent [R611 'fixtures or 75%of permanent E]Does Not ::fixtures have high efficacy lamps.'ooesnucapp|yto|ow�o|tage ^~N-' --- -able �lighting. []m��App|icaU|e :Fuel lighting have []Comp|ies tf '''noco,�iououspxc�nnx� �looesmuc | ,,~ o []mutoUsemab|e El Not � � � ' I/High Impact(TierI) �2 Medium Impact(TierZ) 3 Low Impact(Tier3) Project Title: Foothills Builders Report date: 07/05/18 Datafi|ename: C:\Users\DVVRDesktop\Dno |ON Engineering, LLC\Ar hivePnojects\lZ ' Projyts Page 9ofl0 � Z0l8 No. I3I2 -\l34l - DES' FHB 5l John C|endonDr Lot l7\l34IRescheck.ok � � e�ticnra' plans � rif�ed :Field Vgiified # Ficaal Inspection Pro�risiian Value • s ' Comp�ies? Comments/Assiinapticsns., Req.FD- llaiu . 401:3 Compliance certificate posted. - „❑Complies [07]2. : •• ,`j❑Does Not $, %k❑Not Observable z> ❑Not Applicable 303,3: :',1 Manufacturer manuals for i<' ''' ;❑Complies (FI10 mechanical and water heating P ,3`y.•.-;r •>" )❑Does Not systems have been provided. Y- ,:_ ;❑Not Observable <`• ❑Not Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2, Medium Impact(Tier 2) 3: Low Impact(Tier 3) Project Title: Foothills Builders Report date: 07/05/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Archive Projects\12 - Projects Page 10 of10 2018 No. 1312 -\1341 - DES- FHB 51 John Clendon Dr Lot 17\1341 Rescheck.rck 4. ertificate Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork(unconditioned spaces): Window 0.29 Door 0.29 trItittg j.otni s" er k ' /s..a-r .. fir.' x..c °�`*a�:i Ss-sY,.a'.i.'�„ ...: Heating System: Cooling System: Water Heater: • Name: Date: Comments