Loading...
ResCheck . 1 i Generated by REScheck--Web Software Compliance Certificate SEP 1 3 202$� II 0 Project Cerrone Builders Inc O OF QUA NSBURY Energy Code: 2018 IECC BUILDING 12,, COD_S Location: Glens Falls, New York Construction Type: Single-family - Project Type: New Construction 315.10-1-43 Conditioned Floor Area: 1,512 ft2 RC-0544-2020 Glazing Area 16% Cerrone Builders Inc Climate Zone: 6 (7635 HDD) 26 Alessia Dr, lot 11 Permit Date: SFD w/gas fp 1512 s.f., Gar. 400 s.f. Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 26 Alessia Drive Daniel W. Ryan P.E. WM Lot 11 P.O. Box 596 Queensbury, NY 12804 Glens Falls, NY 12801 dryan@dwrpe.com compliance: Passes usi g UA trade-off Compliance: 1.1%Better Than Code Maximum UA: 279 Your UA: 276 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Va ue R-Value U-Factor UA Perimeter • Ceiling 1: Raised or Energy Truss 1,512 49.0 0.0 0.020 30 Wall 1:Wood Frame, 16"o.c. 1,485 21.0 0.0 0.057 71 Door 1: Solid 18 0.140 3 Door 3: Solid 20 0.240 5 Door 2: Glass 40 0.290 12 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 154 0.290 45 Wall 2:Wood Frame, 16"o.c. 344 21.0 0.0 0.057 16 Door 4: Glass 40 0.290 12 Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 30 . 0.290 9 Floor 1:All-Wood Joist/Truss:Over Outside Air 12 30.0 0.0 0.033 0 Floor 2: Slab-On-Grade:Unheated :Vertical insulation 44 15.0 0.730 32 Insulation depth: 4.0' - Basement Wall 1: Solid Concrete or Masonry 905 0.0 19.0 0.039 35 Wall height: 7.8' Depth below grade: 6,8' Insulation depth: 7.8' Window 4:Vinyl/Fiberglass Frame:Double Pane 3 0.400 1 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 1 of10 ' 1 • i Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory r ' emen li ed in the REScheck Inspection Checklist. Daniel W.Ryan P.E. 1 9/8/20 Name-Title Signature Date ENGINEERS STAMP: •pP�\ _ V. fly. <. ill fe w} (;t n h PI ( ( r .l i [V1 Ill ICI , , �{ 11II!1 �J ��1;i14l-. ! ,l{�j�J` (I�fi if I 1 1�; ca 0 b 6. c ll�' e ,pg PFEssi J Jv Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 2 of10 , REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, ;Construction drawings and ❑Complies 103.2 ;documentation demonstrate ;❑Does Not [PR1]1 energy code compliance for the 4-;?,) ;building envelope.Thermal 1 ❑Not Observable envelope represented on ;❑Not Applicable ; construction documents. ; 103.1, ;Construction drawings and ;❑Complies 103.2, ;documentation demonstrate $ ;❑Does Not 403.7 ;energy code compliance for [PR3]1 ;lighting and mechanical systems. f❑Not Observable 4 :Systems serving multiple I i❑Not Applicable dwelling units must demonstrate . ;compliance with the IECC ;Commercial Provisions. 302.1, 1Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 !sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]z on loads calculated per ACCA Cooling: Cooling: t�j ;Manual J or other methods Btu/hr Btu/hr ONot Observable ;approved by the code official. ❑Not Applicable i Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 3 of10 ; Section Plans Verified Field Verified ' # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.2 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [FO1]1 . i ❑ Unheated 0 Unheated ODoes Not table for values. gi ❑ Heated ❑ Heated ONot Observable ONot Applicable 402.1.2 Slab edge insulation ft ft ❑Complies See the Envelope Assemblies [FO3]1 depth/length. ❑Does Not table for values. j ❑Not Observable ONot Applicable 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [F04]1 insulation R-value.Where interior R- R- ❑Does Not table for values. insulation is used, verification ONot Observable may need to occur during 'Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 ;Conditioned basement wall i ❑Complies [F05]1 i insulation installed per ❑Does Not 4) ;manufacturer's instructions. ONot Observable , ONot Applicable 402.2.9 'Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [FO6]1 'insulation depth of burial or Does Not table for values. distance from top of wall. ' 1 ONot Observable ONot Applicable 303.2.1 sA protective covering is installed OComplies [F011]z Ito protect exposed exterior ❑Does Not 9) ;insulation and extends a , . IONot Observable minimum of 6 in. below grade. , ❑Not Applicable 403.9 ;Snow-and ice-melting system ;❑Complies [FO12]2 ;controls installed. ❑Does Not :c3 ONot Observable ONot Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing /Rough=ln Inspection Complies? Comments/Assumptions &.Req.ID I Value Value ' 402.1.1, ;Door U-factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ODoes Not table for values. [FRl]1 ; ❑Not Observable U ❑Not Applicable 402.1.1, ;Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, !average). ODoes Not table for values. 402.3.3, 402.5 :Not Observable [FR2]1 1 ❑Not Applicable 8) 1 303.1.3 U-factors of fenestration products z ;❑Complies [FR4]1 are determined in accordance ;❑Does Not CO with the NFRC test procedure or ; taken from the default table. .❑Not Observable ; ;❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier I ❑Complies [FR23]1 'installed per manufacturer's ❑Does Not J ,instructions. ❑Not Observable I ❑Not Applicable 402.4.3 ;Fenestration that is not site built ;❑Complies [FR20]1 its listed and labeled as meeting i❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 0 { ;❑Not Observable or has infiltration rates per NFRC , 1400 that do not exceed code i V ❑Not Applicable limits. i 402.4.5 :IC-rated recessed lighting fixtures • ;❑Complies (FR16]2 i sealed at housing/interior finish ❑Does Not and labeled to indicate s2.0 cfm Ileakage at 75 pa, i❑Not Observable ❑Not Applicable 403.3.1 ;Supply and return ducts in attics '❑Complies [FR12]1 insulated >= R-8 where duct is ODoes Not v ;>= 3 inches in diameter and >= , I R-6 where < 3 inches. Supply and ❑Not Observable !return ducts in other portions of ,❑Not Applicable ;the building insulated >= R-6 for ' s i diameter>=3 inches and R-4.2 s ;for<3 inches in diameter. 403.3.2 ;Ducts, air handlers and filter ;❑Complies [FR13]1 'boxes are sealed with • ,❑Does Not N} ,joints/seams compliant with ;International Mechanical Code or i:Not Observable I International Residential Code, as I❑Not Applicable ;applicable. 403.3.5 •6 Building cavities are not used as 10Complies [FR15J3 ;ducts or plenums. i ODoes Not l'ci"" ONot Observable , IONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 5 of10 Section Plans Verified Field Verified - ' # Framing /Rough-In Inspection Value Value Complies? Comments/Assumptions & Re•.ID 403.3.7 i Ducts declared to be within the 11:Complies [FR28]3 conditioned space are either 1) ❑Does Not 14, :, . completely within the continuous , i;`' air barrier and within the building ' ONot Observable ;I: ,thermal envelope, 2) buried ,ONot Applicable i .1 within ceiling insulation in ; I:. 'accordance with Section { II: (R403.3.6 and the air handler is I'' i located completely within the I ; • , continuous air barrier and within Ii l,r the building thermal envelope '. and the duct leakage is <= 1.5 icfm/100 square feet of ; ]conditioned floor area served by If - the duct system, or 3)the ceiling insulation R-value installed II; against and above the insulated II ' ?duct >=to the proposed ceiling li: R insulation R-value, less the R- ivalue of the insulation on the ; . I 403.4 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105°F or chilled fluids ODoes Not J !below 55°F are insulated to aR- i 3 :Not Observable ONot Applicable 403.4.1 Protection of insulation on HVAC ❑Complies [FR24)1 piping. DDoes Not `4' ONot Observable ,, ONot Applicable 403.5.3 ;Hot water pipes are insulated to R- R- ❑Complies [FR18]2 aR-3. ❑Does Not i ONot Observable ONot Applicable 403.6 'Automatic or gravity dampers are ;:• ;❑Complies [FR19]2 ;installed on all outdoor air I • i❑Does Not intakes and exhausts. 1. 'ONot Observable i i ❑Not Applicable Additional Comments/Assumptions: - 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 6 of10 Section Plans Verified Field Verified ° • # Insulation Inspection • Complies? Comments/Assumptions & Req.ID Value Value . 303.1 ;All installed insulation is labeled '❑Complies [IN13]Z ;or the installed R-values _ i❑Does Not '01 provided. ` ,i❑Not Observable ❑Not Applicable 402.1.1, I Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ONot Observable �1 ❑Not Applicable 303.2, Floor insulation installed per ! ❑Complies 402,2.7 manufacturer's instructions and i❑Does Not [IN2]1 in substantial contact with the ' l',4 underside of the subfloor, or floor , ❑Not Observable framing cavity insulation is in ;❑Not Applicable contact with the top side of sheathing, or continuous 'insulation is installed on the I underside of floor framing and extends from the bottom to the top of all perimeter floor framing ,members. 4 t 402.1.1, ;Wall insulation R-value, If this is a` R- R- ❑Complies See the Envelope Assemblies 402.2.5, ;mass wall with at least 1/2 of the ❑ Wood ❑ Wood ODoes Not table for values. 402,2.6 Iwall insulation on the wall ❑ Mass 0 Mass [IN3]1 ;exterior,the exterior insulation ONot Observable j requirement applies(FR10). ❑ Steel El Steel ❑Not Applicable i I 303.2 I Wall insulation is installed per I ❑Complies [IN4]1 !manufacturer's instructions, j' ;❑Does Not i ' ,❑Not Observable ❑Not Applicable Additional Comments/Assumptions: , 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value I Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R-value. R- R- OComplies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ODoes Not table for values. 402.2.2, ❑ Steel ❑ Steel ONot Observable 402.2.E[FI1)1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ODoes Not [FI2]1 Blown insulation marked every 300 ft2. ONot Observable ONot Applicable • 402.2.3 ;Vented attics with air permeable ;❑Complies [F122]2 insulation include baffle adjacent ;ODoes Not ;to soffit and eave vents that Iextends over insulation. ❑Not Observable I ❑Not Applicable 402.2.4 ;Attic access hatch and door R- R- ❑Complies [F13]1 ;insulation aR-value of the ❑Does Not ;adjacent assembly. I ONot Observable ; ONot Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ONot Observable ; ONot Applicable 403.3.3 ;Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [FI27]1 1 determine air leakage with ft2 ft2 ODoes Not either: Rough-in test:Total ;leakage measured with a ONot Observable !pressure differential of 0.1 inch ONot Applicable ;w.g. across the system Including :the manufacturer's air handler ;enclosure if installed at time of 'test. Postconstruction test:Total leakage measured with a ;pressure differential of 0.1 inch ;w.g. across the entire system ;including the manufacturer's air !handler enclosure. 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ODoes Not' <=3 cfm/100 ft2 without air :handler© 25 Pa. For rough-in ONot Observable ;tests, verification may need to ONot Applicable occur during Framing Inspection. 403.3.2.1 ;Air handler leakage designated ❑Complies [FI24]1 by manufacturer at <=2%of ODoes Not ;design airflow. ONot Observable j ?❑Not Applicable 403.1.1 ;Programmable thermostats ILIComplies [F19]2 installed for control of primary 10Does Not heating and cooling systems and I initially set by manufacturer to ❑Not Observable code specifications. IONot Applicable 403.1.2 Heat pump thermostat installed '' 10Complies [FI10]2 ion heat pumps. f❑Does Not I i 11:3Not Observable ❑Not Applicable 403.5.1 1 Circulating service hot water iOComplies [FI11]2 ;systems have automatic or 1❑Does Not ;accessible manual controls. • • ❑Not Observable ( t❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 , Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Complies?. Comments/Assumptions & Req.ID Value. Value 403.6.1 'All mechanical ventilation system 4DComplies [FI25]2. 4fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits per Table ❑Not Observable R403.6,1. ;❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies [FI26]2 ;through one-or two-pipe heating 4 ❑Does Not l systems have outdoor setback control to lower boiler water ❑Not Observable !temperature based on outdoor ❑Not Applicable j temperature. 403.5.1.1 ;Heated water circulation systems! ;❑Complies [F128]2 i have a circulation pump.The I ❑Does Not system return pipe is a dedicated ❑Not Observable return pipe or a cold water supply! r pipe. Gravity and thermos- I ,:Not Applicable syphon circulation systems are k - not present. Controls for !circulating hot water system pumps start the pump with signal ;for hot water demand within the occupancy. Controls automatically turn off the pump 4 ;when water is in circulation loop ,is at set-point temperature and no demand for hot water exists. • 403.5.1.2 'Electric heat trace systems ❑Complies [FI29]2 i comply with IEEE 515.1 or UL ; c,. ❑Does Not ,515. Controls automatically 1 adjust the energy input to the ❑Not Observable heat tracing to maintain the '❑Not Applicable desired water temperature in the piping. 403,5.2 ;Demand recirculation water ❑Complies [FI30]2 ;systems have controls that + ❑Does Not manage operation of the pump and limit the temperature of the ;❑Not Observable ;water entering the cold water „ i❑Not Applicable piping to <= 100F. 403.5.4 IDrain water heat recovery units ❑Complies [F131]2 ;tested in accordance with CSA I❑Does Not B55.1. Potable water-side i pressure loss of drain water heat .❑Not Observable i recovery units <3 psi for ;❑Not Applicable :individual units connected to one r or two showers. Potable water- ' ?side pressure loss of drain water heat recovery units < 2 psi for 4. individual units connected to three or more showers. 404.1 ;90%or more of permanent ;❑Complies (FI6]1 ;fixtures have high efficacy lamps. ;❑Does Not i , I I I❑Not Observable ❑Not Applicable 404;1.1 Fuel gas lighting systems have f❑Complies [FI23]3, `no continuous pilot light. ❑Does Not ;9 '❑Not Observable ❑Not Applicable 401.3 !Compliance certificate posted. 40ComPlies [FI7]2 4 i❑Does Not I - IDNot Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3.; Low Impact(Tier 3)' Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 9 of10 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 303,3 !Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not systems have been provided. • ,ONot Observable • II I DNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 09/08/20 Data filename: Page 10 of10 2+01 IECC Energy Efficiency Certificate I isulation Rating R-Value ■ Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 15.00 Ceiling/ Roof 49.00 Ductwork(unconditioned spaces): glass& Door Rating U-Factor t SH eM Window 0.29 Door 0.29 eating &Cooling Equidment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments