Loading...
LGPC permit 8/10/2020 Permit Detail f-- Yo K Lake George SATE Park Commission BRUCE E.YOUNG DAVE WICK Chairman Executive Director 08/10/2020 Wendy Hoffman 1639 State Route 9#17 Clifton Park NY 12065 Permit#: DWM20-000040 Parcel#: 226.15-1-8, Town of Queensbury Dear Ms.Hoffman, Enclosed is your permit which was issued:,in accordance with the applicable provisions;of the Park.Commission's rules and regulations(6 NYCRR 645&646)and the Environmental Conservation Law Please review the general and special conditions included in°the permit,these are intended>to mihimiz.e.!ahy-driv-frortiotot disturbance associated with thp. atithorized activity. Please note that it is the responsibility of the permittee and the permittee's agent to comply with all permit conditions. Further,the permit is valid only for the activity expressly authorized.Work beyond_the scope of the permit shall be considered as work without a permit.The notice enclosed with the permit must be displayed in a conspicuous:place near the project site during the entire period of construction and must be suitable protected from the elements.Any failure to comply with the terms of the permit may_be treated as a violation of the Environmental Conservation Law. Questions regarding this permit should be directed to the undersigned. Should your plans change,you must contact this office to determine whether a modification to the permit is required prior to initiating construction: Please note the expiration date of the permit. If further time is required to complete the project, you must request renewal of the permit prior to this date.Your interest in maintaining the environmental quality of Lake George is greatly:appreciated by the Commission. Sincerely, oe Thouin Deputy Permit Administrator cc: Town of Queensbury,Wendy Hoffman E r.F7I!� TOWN BUILD N .uELI\j B Y 75 Fort George Road,P.O.Box 749,Lake George,NY 12845 1518.668.9347 Fax:518.668.5001 I www.Igpc.state.ny.us info©Igpc.state.ny.us https://www3.citizenserve.com/Admin/PermitControlier 1/5 - 8/10/2020 Permit Detail LGPC Permit Number NEW Lake George Effective Date DWM20-000040 r STATE Park Commission : 20200810 Modification or Renewal Date PERMIT Type of Permit Under the Environmental Conservation Expiration Date New Law 2021-08-09 Article 43, Title 1,6NYCRR 646-1.1 © Article 15,Title 5, 6NYCRR 608.5 Excavation and Construction and Modification of Wharfs Placement of Fill in Navigable Waters ElArticle 43, Title 1,6NYCRR 646-1.1 El Article 43,Title 1, 6NYCRR 646-1.2 Placement of Moorings Operation/Modification of Class A Marina fl Article 43, Title 1,6NYCRR 646-1.4 I=1 Article 43,Title 1, 6NYCRR 646-1.4 Recreational Use-New Recreational Use-Parasail 111 Article 43, Title 1, 6NYCRR 646-1.4 111 Article 43,Title 1, 6NYCRR 646-1.4 Recreational Use-Seaplanes Recreational Use-Tour Boat EiArticle 43, Title 1,43-0117 Operation of ferries and ElArticle 43,Title 1, 6NYCRR 646-4 Stormwater certain other boats, barges and vessels restricted. Management © 6 NYCRR Part 608 Water Quality Certification Permit Issued To Telephone Number Wendy Hoffman 518-466-0238 Address of Permittee Email Address:. 1639 State Route 9#17 Clifton Park NY 12065 Contact Person(if not permittee) Telephone Number Facility Name Facility Address PRIVATE LAKEFRONT 146 Lake Parkway County Town Parcel# Warren County Queensbury 226.15-1-8 AUTHORIZED ACTIVITY Repair of cribs, piles, or other structures for legally existing wharfs on Lake George as shown on the plans attached as Schedule A and made part of this permit. No change in size, shape or location of existing wharfs)is authorized. By the acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the Environmental Conservation Law,the Navigation law, all applicable regulations, and the General and Special Conditions included as part of this permit. Joe Thouin Deputy Permit Administrator Lake George Park Commission, P.O. Box 749, Lake George, NY 12845 1518.668.9347 Authorized Signature Date Page 1 of 4 August 10, 2020 https://www3.citizenserve.com/Admin/PermitController 2/5 8/10/2020 Permit Detail GENERAL CONDITIONS 1.All activities authorized by this permit must be in strict 10.The permittee has accepted expressly, by the conformance with the plans attached as Schedule A and execution of the application,the full legal responsibility of made part of this permit. Modifications to the project all damages, direct or indirect, or whatever nature, and by require prior approval in writing from the Commission. whomever suffered, arising out of the project described herein and has agreed,to indemnify and save harmless the 2.The permittee and any contractor, project engineer, or State from suits,_actions; damages and costs of every, other person responsible for the overall supervision of this name and description resulting from the said project. project shall read, understand and comply with this permit, including all conditions to prevent environmental 11.The State of New York shall in no case be liable for any degradation. damage or injury to the structure or work herein authorized which may be caused by or result from future operations 3. The Commission and/or the Department of undertaken by the State for the conservation or Environmental Conservation (the Department) may improvement of navigation, or;for::other purposes;_and no conduct such on-site surveys, investigations, claim or right to compensation shall accrue from any such examinations, and evaluations from time-to-time as it damage. deems necessary to ensure compliance with the terms and conditions of this permit, and may conduct a final 12. Regulatory fees are due April 1 of each year for inspection at any time after construction to determine docks.wharfs and moorings. compliance with the permit._.. 13. Wharfs and moorings authorized herein are for 4.A copy of this permit must be available at all times at the residential use only and shall not be used for commercial, project site during performance of the authorized activities. association or marina purposes. Failure to produce a copy of the permit upon request by a Commission or a Department representative is a violation Environmental'Protection of this permit. 14._Disturbance to the bed.and.banks of Lake George shall be kept to the minimum necessary to complete the project. 5.The permittee is responsible for keeping the permit active by submitting a renewal application, including any 15.All necessary precautions shall be to preclude forms, fees or supplemental information which may be contamination of any wetland or waterway by suspended required by the Commission, no later than 30 days prior to solids, sediment,fuels, solvents, lubricants, epoxy the expiration of this permit. coatings, paint, concrete, leachate or any other environmentally deleterious materials,associated with the 6.Any change or modification in any of the activities project. authorized by this permit is subject to prior review and approval by the Commission.Any modification of this 16. Heavy::equipment, including bulldozers, backhoes, permit granted by the Commission must be in writing and payloaders, etc., shall not be driven in the water. attached hereto. 17.Any material dredged in the prosecution of=the.,work 7. The permittee is responsible for obtaining any other herein permitted shall be removed evenly,without leaving permits, approvals, land easements, and rights-of-way large refuse piles, ridges across the bed of a waterway or which may be required for this activity. floodplain or deep holes that may have a tendency to cause damage to navigable channels or to the banks of a 8. Granting of this permit does not relieve the permittee of waterway. the responsibility of obtaining any other permission, consent, permit, or approval from the US Army Corps of 18.Any debris or.excess materials from construction of this Engineers, US Coast Guard, NYS Office of General project shall be immediately and completely removed from Services, NYS Department of Environmental Conservation, the bed and banks of all water areas to an appropriate NYS Department of Health,Adirondack Park Agency, or upland area for disposal. local government which may be required. 19. There shall be no unreasonable interference with 9.This permit shall not be construed as conveying to the navigation by the work herein authorized. permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the 20. Wood treated with Creosote, Pentachlorophenol or permitted work or as authorizing the impairment of any CCA(Chromated Copper Arsenate) is prohibited forin- rights,title or interest in real or personal property held or water and above-water use. vested in a person not a party to the permit. LGPC Permit#:DWM20-000040 Page 2 of 4 https://www3.citizenserve.corn/Admin/PermitController 3/5 • 8/10/2020 Permit Detail GENERAL CONDITIONS 21. If upon the expiration or revocation of this permit,the project hereby authorized has not been completed,the permittee shall,without expense to the State, and to such extent and in such time and manner as the Commission or the Department may require, remove all or any portion of the uncompleted structure-orfill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 22. If future operations by the State of New York require an alteration in the position or the structure or work herein authorized, or if, in the opinion of the Commission or the Department it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destruction of the natural resources of the State,the owner may be ordered by the Commission or the Department to remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State. Water Quality Certification 23. If granted under 6NYCRR Part 608, the Lake George Park Commission hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301,302,303,306 and 307 of the Clean Water Act of 1977(PL 95-217) provided that all of the conditions listed herein are met Crib Work 24. Stone used for filling shall be clean(not contain any material than can:pass through a No. 8 sieve).The stone shall not be less than six(6) inches in diameter. 25. No rocks for use in construction are to come from the lake bed. The following specifications apply to the construction or replacement of rock-filled cribs. Existing cribs may be repaired. 26.The size of any individual crib shall:not exceed 8 feet by 12 feet. 27. Spacing between cribs shall not be less than 8 feet.A minimum of 6 feet of open water shall be maintained between the shoreline and the first crib to allow for free circulation of water. 28. Completed cribs shall be of the"open-sided"type construction and provide for at least 40%.unboarded.water ; contact area to the rock fill. LGPC Permit#DWM20-000040 Page 3 of 4 https://www3.citizenserve.com/Admin/PermitContraller 4/5 • 8/10/2020 Permit Detail To the permittee: Please sign,fold,tape shut and return upon completion of the project. FOLD#2 Wendy Hoffman 1639 State Route 9#17 Clifton Park NY 12065 Lake George Park Commission PO Box 749 Lake George NY 12845 FOLD#1 Certification of Completion of Work Authorized by Permit#DWM20-000040 Issued on 08/10/2020 Parcel#226.15 1-8, , Town of Queensbury Project Repair:`of cribs, piles or other structures for legally.existing wharfs on Lake George_as shown on the plans attached as Schedule A and made part of this permit. No change in size, shape or location of existing wharf(s) is authorized. The project;authorized by the above referenced permit was completed on The dock was installed/constructed by_ X / / Owners Signature. Date An inspection will-be-Made once form is received The permit must be kept active during construction. -,https://www3.citizenserve.com/Admin/PermitController 5/5