Loading...
DEMO-0567-2020 P • Office Use Only 2 3 l DEMOLITION APPLICATION Permit#: kelvIO- 05‘0.1�_20K Permit Fee:$ 150100 Town of Qyccnsbury n p,� Invoice:#: !rl-1 742 Bay Road, Queensbury, NY 12804 P: 518-761-8256 www.queensbury.net Demolition Location: 7 0 N 4-2 tZy C/oSS/Ai&Tax Map ID#114-5-01 3 Ye o 36't, / 7-1 3 9 sturrausf€Iy, ivy f24-oy **AN ASBESTOS REPORT IS RE 0 k r '�r1� M" '` LL DEMOLITION APPLICATION fib SEP 22 2020 CONTACT INFORMATION: TO U O QUG&EENSBURY CODES • Applicant: Name(s): 1,c0410m.oG9 l�Rnl S7-Ei J p t i/t s) j L. Mailing Address, C/S/Z: /po Boy 4 �N 37/ CAW& S/3 u/zy1 Ai Y /2-8'0 y Cell Phone: ( 9''Y ) 65/-- y63S` Land Line: ( $'/S' ) 7,4 - �6 4 G Email: o0vAlW 0/ e &AA,L • Con / 7 O Z Gt�VERp�4t-6-P/LoP�2TiES ' Co1'l • Primary Owner(s): Name(s): e000/21 A/2JS it)It) Mailing Address, C/S/Z: p G 60 e 6 / CLevai oALc/ N V / 7-frzo Cell Phone:_( gay ) (&SA.- 17603c Land Line: _( ) Email: /6:0P yt}2Alo1 e &fli 4%L- C oivd ❑ Check if all work will be performed by property owner only • Contractor: Workers' Comp documentation must be submitted with this application Contact Name(s): A L-/},1 DU 4LA Contractor Trade: 6,u /14i CoAJ77t -c Tb I2 —• P,4/LTiu&Yk- Mailing Address, C/S/Z: /0 6 /icerts1'I y aOA) `CeZ.-Skitt1 f6/UO RDif Fr/avil /1t-7 Cell Phone: _( S(C( ) 6 81 - ov `e Land Line: ( ) Email: A Dvoi-A a-7 C. y1-140o **List all dditional contractors on the back of this form woo Ke144 t) Co/tP F_,XKri P i COLT,F,et4--- �� Contact Person for.Building & Code Compliance: AThAj Du0u-9- Cell Phone: ( 5/r ) 6 P - (9 b y 5 Land Line: _( ) Email: iti:,b U 0 i:A V7 e 'T,/AF-Err 0 - co M Demolition Application Revised January 2020 DEMOLITION INFORMATION: -- 1. Where will demolition material be disposed? q,"�g Y �try�v 44 -N4 '� 0, fr PUs/J—� 2. Type of structure to be demolished: a. Residence V b. Garage c. Business d. Storage Building 3. What type of uti hies are connected to the structure: a. Gas b. Fuel Oil c. Propane d. Electric / e. Public Water f. Well-Water Pump • g. Public Sewer h. Other i. None 4. Have ALL utilities been disconnected? Yes No # ADDITIONAL INFORMATION: 1. Two inspections may be required: an inspection to determine that utilities are disconnected, if necessary, and a final inspection, after the structure is removed and the site is cleaned up and graded. 2. Twenty-four (24) hour notification is required for inspections. 3. Workers' Comp insurance information is required to be submitted with this application. Declaration: I acknowledge that no structure(s)will be removed from the parcel until the demolition application has been reviewed and approved by the Town of Queensbury Building&Code Enforcement and Zoning Departments and a permit has been issued. I have read and agree to the abo e: PRINT NAME: SIGNATURE: <:frV 0 (i_e /i-A) DATE: Demolition Application Revised January 2020/ • I John O'Brien From: Scott Loudis <sloudis@greenbriar-Ilc.com> Sent: Tuesday,October 6,2020 2:34 PM To: John O'Brien Cc: teddyarn0l @gmail.com Subject: 7 Quarry Crossing Queensbury Attachments: NYS Asbestos License 2020-2021.pdf FILE COPY John, I hope all is well Please rnat e h"at= ==e r..e.maining duct work ntaining asbestos „, �uarry;Y t iing_iin °,Ueen gy is enniabate. in -46mp lance wiftrNY.ICR 5�`The.o ucre'movved-on Thua-sday Octobera, 202D4`as aerninor :- tent aiad dispoosedrof at ahlandfill per pitted toaccept such material'A;total of.7�SFaof ducts ; *rap p 3 s< 1 a�s�,�rem�,ov�ed�in tota'le I have attached a copy of our NYS Asbestos License for your files. Please confirm receipt of this message and let me know if there is any further documentation needed at this time. Best, • SCOTT L O DIS 19,,titt § Wilshire Drive „Albany, NY 12205 GREENBRIAR t .(51 )6 1551' - CO TRIJc�ior�. m v1css Lr c: sloe i s[a greenbr ar-Ilc:corn 1 ' License And beitificatephit -ASBESTOS HANDLING LICENSIE-, DATE OF ISSUE: 03/2412020 A, LLUL.4x 7<2 41, Labor Law of New Y rk.,Stdte rhis licensAas bi jWith�Ap ?�11 0 serious VOatio'fi of'state,federal or'16cal laws wit il r ��ipr6j'�&,or(2)demonst'rate'd't4ck-gf — responsibility in the,conduct of an 5 -asbdstospaie'ria jz� ya i's lice­h;e—i;�valid only,for the contractor named lilbbve an -tC� Department of Labor./. � aH*uu<m1u> — --' For the Commissioner of Labor' John O'Brien From: Scott Loudis<sloudis@greenbriar-Ilc.com> Sent: Tuesday,October 6,2020 6:19 PM To: John O'Brien Subject: Re:7 Quarry Crossing Queensbury John I hope all is well Drsposafurns Finch W_a`ste n� _*o `Profile I alT 120433NY Best, Scott Loudis Greenbriar Construction Services, LLC 518-621-6512 SLoudis@Greenbriar-LLC.com 49 Wilshire Drive Albany, NY 12205 On Oct 6,2020, at 4:19 PM,John O'Brien<JohnO@queensbury.net>wrote: Scott, I need for my records the name of the disposal site and ticket of its disposal. Thanks! John O'Brien Code Enforcement Officer Town of Queensbury <image002.png> From:Scott Loudis<sloudis@greenbriar-Ilc.com> Sent:Tuesday, October 6,2020 2:34 PM To:John O'Brien<JohnO@queensbury.net> Cc:teddyarn0l@gmail.com. Subject:7 Quarry Crossing Queensbury John, I hope all is well. Please note that the remaining duct work containing asbestos @ 7 Quarry Crossing in Queensbury has been abated in i s Compliance with NYS ICR 56. The duct was removed on Thursday October 1, 2020 as a "minor tent" and disposed of at a landfill permitted to accept such material. A total of.7 SF of duct wrap was removed i.n total. I have attached a copy of our NYS Asbestos License for your files. Please confirm receipt of this message and let me know if there is any further documentation needed at this time. Best, <image003 jpg> 2 FILE COPY (4' September 30th,2020 GREENBRIAR CONSTRUCTION SERVICES LLC Mr.Ted Arnstein Ticonderoga Inc. P.O. Box 4237 Queensbury, NY 12804 Project: 7 Quarry Crossing Queensbury,New York 12804 Mr.Arnstein, Greenbriar Construction Services, LLC is pleased to provide the following lump sum proposal for the abatement services required at the above-referenced project. Included in Scope of Work: • Mobilization of labor,equipment, materials,and supervision to and from site. • Abatement of asbestos-containing thermal systems insulation (TSI) @ basement. Quantities included are less than 24 SF of TSI. • Removal and legal disposal of all asbestos-containing material to a certified landfill facility permitted to accept such material. • Includes required OSHA monitoring. • Includes required project closeout documentation. Exclusions: • Hazardous or regulated material abatement or remediation of asbestos, mold, lead, PCB, refrigerants,mercury, UST, paints,solvents,etc. other than the aforementioned. • Disconnection, relocation, isolation, or termination of utility services. • Temporary Power and water. • NYS Sales Tax. • Third-party monitoring,consulting,testing, engineering,or analytical services. • Municipal building permits. • Any other work besides what is previously specified in the above scope of work. kg.) Ale GREENBRIAR CONSTRUCTION SERVICES LLC Lump Sum Pricing: $1,195.00 NYS Sales Tax: $ 83.65 Total: $1,278.65 Project Schedule: • Greenbriar Construction Services anticipates approximately 1 day(s)for safe and successful project completion of the abatement from a start date mutually agreed upon by the contractor and owner. Terms&Conditions: • The terms of this quotation shall be incorporated into and made part of any future contractual agreement between both parties. • Owner to provide Tax Exempt or Capital Improvement Certification otherwise applicable sales tax may apply. • Insurance furnished to the limits and coverage's shown on the attached sample COI. • No percentage of payment shall be retained for any periods of time. Any balances over 30 days will be charged interest at a rate of 2.5%per month. All major credit cards accepted at a rate of 3.5%per transaction. • Quote is based on current landfill,fuel, material,etc. cost at the time of estimate. Any increases after 30 days will apply on a cost-plus basis. Quote valid for 30 days from proposal date. • All work will be completed in an open shop environment during normal business hours, Monday-Friday, unless otherwise stated. Prevailing wage rates not included. • All work to be completed under a single project mobilization unless otherwise stated. Sincerely, 5-001r 4f)uo�il- Greenbriar Construction Services, LLC 49 Wilshire Drive Albany, NY 12205 (518) 621-6512 1 �.i GREENBRIAR CONSTRUCTION SERVICES LLC ACCEPTANCE OF PROPOSAL CONDITIONS NOTICE TO PROCEED: Name: Representing: Signature: Date: Acknowledgement of Payment Terms&Conditions: (Initial) ***THANK You POR YOUR BUSINESS*** ,rs• , 3 __,_,..,.,...------::.,___._,—.....—......_______ 7.-.., -",--r-- ....-... -'"•-- ' -,.., ,---_,-----Revy-York State Departrriontof..cabor:-, ,..,--' ., .------:-----..--„ ._),Division opaiety Ind Health ...- .„---`. if' s . -- ... .„..„. ,{ '11\i,i — i License and Certificate Unit - -.,.- ,-- . . , \ State Cdrnpus,Bvuliciing 12. h.,,;.:.-i I ,t ''''''* ','"'s -, 'N. )//„,t,-;-° Albany.,_NY 122475 1,../ .." ,,,,---,...\ .. ,,,, :,,, ,,.., .......- -_____ • ., ...K ..„, \,..7-\ ...__,___..____._____________„ , ye- -,, ,\ h ......-- -- --,------_ /. ,.. \ 7 „-.-.---ASBESTOS HANDLING LICEN --,. - ' 2 ,-...... . .„. ...,, . ., / ,( N': •-\ ),'" ,,''',,,* -, i‘ \\ ..., . -, ...------.. a";.-^ ,---------: - ,1 Greeribri?_r Contruction Serviaes, LLCZ.--- -*---- -1 i / --.. ...-FILE NUMBER: 1'8111579 / -.7—A \J ,.../i.', -.. // .\(----------, ,/-;*/ rs-5-__;- .1-,;_, . ..v,%::..*.-.3:-_.:31, LICENSE NUMBER:\111579--„, ..--'t\ '',.\ / . •N./.1---sYi r i 1 49,71Niishire Drive/ ' ...FI"A, ....SW 1 -4-4 ,,Ki ..,.., , LICENSE CLASS: FULL\ l' / //,.. ‘,..,..., // '''''.11.?1/ .'Z'It- ,\ ‘, ( r•-•.' '''.. li / ,..... DATE OF ISSUE: 03/24/2020 // \'', \ 205 ,l'N. (...:-./7 ,,';:tlbak,IY/12' 6 iol, .4 .„.„.,,t..., (,,,, ,,,.:,:,,,,,, i Fm:\ EXPIRATION DATE: 04/30/202 ,,„ .-..?-.,,,,..e.::: ,i ___-...) , 11 . \ v,.. .---'''' \ ' \ ti tfr ,/,..-----) // fR.) 6„, ,,:,(31 \c..:21.,,::,...,,,,..... 1., J.,:ii . a. \ \ \ , ,,,- „ -';' ',,,, _0:-':,!-ft.`".-;,n,;;-',-4-, ,- ..,.4=-4, 1 A \ ', • I i , \4., \ ----,..:14,,......., ,,,, - , dr, \,._,,,A . .•--,4: - I 1 F,- 4,jr,'-•:, ,-mo-,-,... ,I; ,t-I___•:,--/ ,,. 0 \ • . 1.-' ,ri.- 1.: Y7.4,, ' \ ''i, ! - I.''' t • t, r:--7---\,-;3 Duly Authorized Representative.'7'-''Scott'Laid's,: z---- .:=',...-':--:/-1 .. - - ?". - „/ l, ''.4.. ...-.. lt 1 V----,-----) 1. 14N 1 1"i-T- -t, , '''':'-'j'r''''''':1/1":-'7: ‘Iql;7,3 ; \ , / .„,,, , -, .,,,...--,,,,,,,,,,..iz,„,.., ::.?,,,,,,ilvv:r,., ..,.-71._ • zi / ,'', I 4- .. I A11,4 ', A.,,;', .:;-=-. --4,/,'40.,lcil$ f:. i i"i' H i L___I j )_,---,---i I 4 - /. ‘ Thisiieense'-lias been issued in acafirdalCeiWith'applibable,proyigionsnofAit'Aele 3-6/Of the Labor Law of New YorkState-arid of I 1 • — -4 t, t 0 0, j ' '''' ' -4 q ...,Se.,) 10i '• ir,:;'' I.j .. the New-YoykState Codes,Rules and Regulations-612NYre-RR-Part`56)?Itisisubjeat to suspension or revocation for a(1) '• 1. _— ', 164:' ti t',9 , i o •t,ity:ti •,:.- ' , - -- ---ii-vi ,, 1!.,6i / i '''... . serious violation of state,federal or loc1.1aWs with regard-to the conduct of arkasbestos project,or(2)demonstrated, lack-of t i A • P.----...4-s \ ''s ,,.0, ,./ -, . . 1.*!,::)ii,-, Milic-4'', -z4,602.41`,0:0X40-2:-‘''T'A/' 0// 10-A 7 ; /.::::-. . responsibility in the conduct of anyjoopnyolwtigkas estonrIsbestospaterial./ , t.,.....,. ., --,) /,,, \ ,--.........\ \\ , ---- _ 4-===-1,-,71-..0,,`Vy j,wo-,-- --.- f-V>-----4'"---z--)- --- ,-„V,,•„ ,i--, ,..?-,-4„,4:f r..-fce,,:,,,--;:,,-.., ,,,,:,,, .-, / 1___,._,?? • '.',i, \ "V-'-:-..:-,r )\ = ;<",•• . ^-,V11:7N-t-'4 --"":.<?"'=' -'<>:7- Vi '%.5-t.A -- ..), % / ' .'-• '-'-- ii i / This license is`valid onlyfor the contractor named'aVove and-thlicense or.arphofocOpy_mustbelirdminently displayallat the .-...-, J--- .,4..,. ., asbestd projeet.7w-orksite.‘Thislicense verifie thati4,114)ersons_employedr-bylthe licensee on affasbest34projeet•in-Nevy:Yprk • -Tr 1 ,\N-, ...- State have beeiiqued an Asbestos CertificaTe,--applopriatrfo'Fig tYpelof-Wcirk-tliey perform,by the New Yorifc-§tifel i / i /\ , __- Department of Labor. , ...-,. ,.. %. \,,... ., / ,.., \ ', \/ .../:( )• , \:,..., ..,„,, ... „„•.„, V•1 ,..-- r .•,—.0"/.-1-----' irN ',..„,"",... \'0 \e/ I 1--"`"-\-q- ''' .- , --,-- ' \ \ i :/ ---.-'` ;/I ; 21 .., ^,- . --- ,, ,-7.----7 •..„‘)\ ,.ii.,...,, ,, "..; 111 [I r , -„, /i 1,\ ,,,, • „,,,,,,, ----.-.,---- ,-- .--'.-,--'7 . ..<-.41' y ----„,:---,_ -- , , ......„- , ....... ......„ ..„. _...„,_ .... _...,.... \ ...., .,...., ..., . _......„-. --Eileen M.Franko, Director SH 432(8/12) _ , , For the Commissioner of Labor • • .; • FILE COPY DECIEEIVEn AirWater Environmental,LLC. SEP 18 2020 September 16,2020 TOWN OF QUEENSBURY Ticonderoga(Arnstein.Properties)Inc. BUILDING CODES CIO 7 Quarry Crossing Street Hudson Falls,New York 12839 RE: MID RENOVATION ASBESTOS SURVEY REPORT FINDINGS OF INTERIOR SURVEY AirWater Environmental.LLC.is pleased to submit the attached Pre-Renovation Asbestos Survey Report for the above-referenced site. The findings of the survey and the laboratory analysis of samples obtained indicate that the samples of the following materials contain greater than 1%: • Cloth Wrap On Metal Duct Work • Siding(Assumed Transite) If you have questions regarding the findings of this survey,please do not hesitate to contact us. Sincerely, AirWater Environmental LLC. John Snyder Principal Enclosure 3larr 171-39 DEMO-0567-2020 Tnderoga Arnstein Properties Inc 7y Crossing Partial demo (interior)for renovation 4E Vatrano Road Albany,New York 12205 (518)391-8030 C 9, AirWater Environmental,LLC. MID-RENOVATION ASBESTOS SURVEY REPORT ASBESTOS SURVEY REPORT Ticonderoga(Arnstein Properties)Inc. C/O 7 Quarry Crossing Street Hudson Falls,New York 12839 Report Date: September 16, 2020 Prepared for: Ticonderoga(Arnstein Properties)Inc. C/O 7 Quarry Crossing Street Hudson Falls,New York 12839 AirWater Environmental,LLC. TABLE OF CONTENTS 1.0 PURPOSE AND SCOPE OF SERVICES 1 2.0 REPRESENTATIVE ASBESTOS-CONTAINING MATERIAL SURVEY 1 2.1 Homogeneous Areas 1 2.2 Hazard Assessment Factors 1 2.3 Sampling Strategy 2 2.4 Laboratory Analytical Results 3 3.0 RESULTS 3 4.0 ASSUMPTIONS AND LIMITATIONS 4 ATTACHMENTS Attachment A Laboratory Analysis Report with Chain of Custody Documentation Sample and Asbestos Location Drawing Attachment B Company,Personnel and Laboratory Accreditations and Licenses ii 1 AirWater Environmental,LLC. 1.0 PURPOSE AND SCOPE OF SERVICES The purpose of this project was to conduct a pre-renovation asbestos survey of the areas targeted for renovation in the structure located at 7 Quarry Crossing Street Hudson Falls,New York 12839. AirWater Environmental LLC provided the following services. Conduct a representative asbestos survey in the identified areas,which include: 1. Survey the site building. 2. Identify accessible suspect asbestos-containing materials(ACMs)that were not previously tested. 3. Quantify ACMs, including material condition and location. 4. Collect and analyze bulk additional samples of suspect friable and non-friable materials to eliminate suspect materials as asbestos containing. 2.0 REPRESENTATIVE ASBESTOS-CONTAINING MATERIAL SURVEY AirWater Environmental LLC conducted a pre-renovation asbestos survey of the areas targeted for renovation in the structure located at 7 Quarry Crossing Street Hudson Falls,New York 12839.. A NYS Certified and AHERA trained asbestos inspector conducted the asbestos survey of the building materials targeted for demolition. The areas were visually inspected for the presence of materials in the path of demolition that are suspected to contain asbestos. Bulk samples of the identified suspect ACMs were collected and placed into individual containers for transport to a National Voluntary Laboratory Accreditation Program(NVLAP) and a New York State Department of Health Environmental Laboratory Approval Program(ELAP)-accredited laboratory for analysis. Materials visibly identified as non-asbestos(fibrous glass, foam rubber,wood, etc.)were not sampled. The asbestos survey consisted of three basic procedures: 1) conducting a visual inspection of the structures; 2) identifying homogeneous areas (HAs) of suspect surfacing,thermal system insulation, and miscellaneous materials;and 3) sampling accessible,friable and non-friable suspect materials. 2.1 Homogeneous Areas Prior to collecting any samples,HAs were identified and listed to develop a sampling strategy. A homogeneous sampling area can be described as one or more areas of material that are similar in appearance and texture and that have the same installation date and function. The actual number of samples collected from each homogeneous sampling area may vary,based on the type of material and the professional judgment of the inspector. 2.2 Hazard Assessment Factors From the list of suspect homogeneous materials, a physical assessment was performed for each material on the list. A physical assessment includes evaluating the condition,assessing the potential for disturbance, and determining the friability of each material. Friability is a term used to describe the ease in which a building material inherently lends itself to disturbance. By definition,"friable"materials are those that can be crumbled or reduced to powder by hand Page 1 AirWater Environmental,LLC. pressure when dry. Each material on the list was further classified into one of three categories, which have specific sampling requirements for each category. Surfacing Materials: Refers to spray-applied or troweled surfaces such as plaster ceilings and walls,fireproofing,textured paints,textured plasters,and spray- applied acoustical surfaces. Thermal System Insulation: Refers to insulation used to inhibit heat gain or loss on pipes,boilers, tanks,ducts,and various other building components. Miscellaneous Materials: Refers to friable and non-friable products and materials that do not fit in any of the above two categories such as resilient floor covering, baseboards,mastics,adhesives,roofing material,caulking,glazing, and siding. This category also contains wallboard and ceiling tile. All confirmed ACMs were then assessed by their condition as good (intact), fair(damaged) or poor(significantly damaged)per Title 40 Code of Federal Regulations Part 763. Material with localized significant damage was also assessed as poor when observed. 2.3 Sampling Strategy The asbestos inspection was conducted according to New York State Department of Labor Industrial Code Rule-56.guidelines using a minimum number of samples collected from each HA,which also meets the sampling requirement found in 29 CFR 1926.1101. Sample collection depends on the category that the HA falls into and the amount of material present, as follows: GUIDELINES FOR DETERMINING THE NUMBER OF SAMPLES TO TAKE HA CATEGORY HA SIZE SAMPLES REQUIRED Surfacing Materials <1,000 SF 3 1,000-5,000 SF 5 >5,000 SF 7 or more Thermal System Insulation No Stipulation 3+(Must also sample all repair patches) Miscellaneous Materials No Stipulation Per AHERA,these materials must be sampled"in a manner sufficient to determine whether or not they contain asbestos"typically 2-3 samples based upon inspector judgment. If the analytical results indicated that all the samples collected per HA did not contain asbestos, then the HA(material)would be considered a non-ACM. However, if the analytical results of one or more of the samples collected per HA indicate that asbestos is present in quantities of greater than 1 percent asbestos by weight(as defined by EPA), all of the HA(material)would be treated as an ACM regardless of any other analytical results. Material,which can visually be determined to be non-asbestos (i.e., fibrous glass, foam rubber, etc.)by the accredited inspector are not required to be sampled. Miscellaneous materials require adequately representative sampling,which is typically done by collecting from two to three samples per material. Inspectors typically rely on other survey Page 2 AirWater Environmental,LLC. observations such as the condition,friability, and quantity of material to determine what would be a sufficient amount of samples to accurately evaluate the presence or absence of asbestos content. Actual collection of a bulk asbestos sample involves physically removing a small piece of material and placing it in a marked, airtight container. Sample containers are marked with a unique identification number, which is also noted in the field notes. 2.4 Laboratory Analytical Results The samples were sent to Amerisci in New York,New York for analysis. • Friable Samples—Friable suspect asbestos containing material samples were analyzed utilizing Method EPA/600/R-93/116 with New York State ELAP 198.1 revision to facilitate compliance with both AHERA and the New York State Department of Health polarized light microscopy(PLM) analytical techniques. All fibers observed were identified to determine whether or not they contained asbestos. • Non-Friable Samples—Non-friable organically bound(NOB) suspect asbestos containing material samples were analyzed utilizing Method EPA/600/R-93/116 with New York State ELAP 198.6 and 198.4 revisions to facilitate compliance with both AHERA and the New York State Department of Health polarized light microscopy(PLM) and transmission electron microscopy (TEM) analytical techniques. These non-friable organically bound samples must be weighed to record initial sample weights,then subjected to muffle furnace and acid bath sample preparation to eliminate the organic constituents. If the remaining inorganic sample residue is l%or less of the original sample weight,the sample is considered a non-asbestos containing material. If the remaining inorganic sample residue is • greater than 1%of the original sample weight then the sample must be analyzed using either PLM or TEM analytical techniques to determine that the sample is an asbestos containing material (positive) or TEM to prove that the sample is a non-asbestos containing material (negative). A non-friable organically bound sample must be proven a non-asbestos containing material utilizing the NYS ELAP 198.4 TEM test method to be in compliance with the New York state Department of Health. 3.0 RESULTS The results of the pre-renovation asbestos survey of the areas targeted for renovation in the structure located at 7 Quarry Crossing Street Hudson Falls,New York 12839 indicated that the samples obtained contained greater than 1% asbestos. See drawing for locations and estimated quantities. • Cloth Wrap On Metal Duct Work • Siding(Assumed Transite) Attachment A contains the complete asbestos laboratory analysis report with chain of custody documentation and a sample location diagram. Attachment B contains the Company,Personnel and Laboratory Accreditations and Licenses. Page 3 AirWater Environmental,LLC. The building survey included limited destructive sampling for"hidden"materials. If, during the course of demolition, any material is discovered that is not listed in the laboratory samples results it must be treated as asbestos containing material and handled appropriately or sampled by an inspector according to NYS and EPA regulations. One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows: • One (1)copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws. • The completed asbestos survey for controlled demolition(as per Subpart 56-11.5) or pre- demolition asbestos projects shall also be submitted to the appropriate Asbestos Control Bureau district office. • The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required,throughout the duration of the asbestos project and any associated demolition, renovation,remodeling or repair project. — 4.0 ASSUMPTIONS AND LIMITATIONS The results,findings, conclusions, and recommendations expressed in this report are based only on conditions that were noted during the inspection of the areas already under renovation in the structure located at 7 Quarry Crossing Street Hudson Falls,New York 12839 on the date of the survey work. • The selection of sample locations and frequency of sampling was based on observations and the assumption that like materials in the same area are homogeneous in content. • Refer to Section 1.0 Purpose and Scope of Services of this report to see clarification of survey locations that were in our scope of work. (This is Standard in Surveys) • Exterior areas below grade were not inspected. Foundation sealers,buried piping, and other items may exist below grade which may contain asbestos. • Masonry was excluded from the survey. • Vermiculite was not discovered during the survey. It may existing in concealed spaces. If found it must be assumed to contain asbestos and must be abated accordingly. Random penetrations were made to walls, ceilings, attic floor, and block foundation and no vermiculite was observed. It still may exist in the structure as only full demolition will reveal all materials. • This report reflects the conditions found at the date and time of the inspections. Conditions of the area may change due to external events or forces. Re-inspection of the area may be required prior to the start of any work if an extended period of time has passed or if further disturbances have occurred. • Electrical wiring and electrical components were not sampled as customer stated it will not be impacted or removed. Page 4 AirWater Environmental,LLC. • Additional layers of flooring,wall systems,or ceiling systems may exist. Only full demolition would reveal all layers. If discovered these items must be sampled if not sampled previously. • The customer refused testing on-the siding if the structure.It is assumed to be Transite siding. All quantities are estimates. The asbestos abatement contractor is to confirm the quantity prior to bidding. Our professional services have been performed,our findings obtained,and our conclusions and recommendations prepared in accordance with customary principles and practices in the fields of environmental science and engineering. This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions,nor does it warrant against operations or conditions present of a type or at a location not investigated. Page 5 ATTACHMENT A BULK SAMPLES WITH CORRESPONDING RESULTS SAMPLE LOCATION DIAGRAMS Please Reply To: f°111.1 AmeriSci New York 117 EAST 30TH ST. Aii AERI SCI NEW YORK,NY 10016 TEL:(212)679-8600•FAX:(212)679-3114 LABORATORY ELECTRONIC TRANSMITTAL To: John Snyder From: Bo Sun AirWater Environmental,LLC AmeriSci Job#: 220091651 Fax#: Subject: ELAP-PLM/TEM 3 day Results Client Project: 7 Quarry Crossing Queensbury, Email: sn de 'n mail.co Throughout y rJ y@g m,airwaterbruce@outlook.com Date: Friday,September 11,2020 Number of Pages:• /1 Time: 18:10:36 (including cover sheet) Comments: NOTE:Attached report is to be considered preliminary until final review with accompanying analysis summary letter is issued. CONFIDENTIALITY NOTICE: Unless otherwise indicated,the information contained in this communication is confidential information intended for use of the individual named above. If the reader of this communication is not the intended recipient,you are hereby notified that any dissemination, distribution or copying of this communication is prohibited. If you have received this communication in error,please immediately notify the sender by telephone and return the original message to the above address via the US Postal Service at our expense. Samples are disposed of in 60 days or unless otherwise instructed by the protocol or special instructions in writing. Thank you. Certified Analysis Service 24 Hours A Day•7 Days A Week Competitive Prices visit our web site-www.ameriscl.com Boston•Los Angeles•New York•Richmond AmeriSci New York a j 117 EAST 30TH ST. AMERI�C/ NEW YORK,NY 10016 TEL:(212)679-8600•FAX: (212)679-3114 PLM Bulk Asbestos Report AirWater Environmental, LLC Date Received 09/09/20 AmeriSci Job# 220091651 Attn: John Snyder Date Examined 09/10/20 P.O.# P.O. Box 1071 ELAP# 11480 Page 1 of 7 RE:7 Quarry Crossing Queensbury, Throughout Averill Park, NY 12018 Client No. / HGA Lab No. Asbestos Present Total %Asbestos 1 220091651-01 No NAD 1 Location: 1st Floor Living Room Area-Plaster (by NYS ELAP 198.1) by Bo Sun on 09/10/20 Analyst Description:Grey,Homogeneous,Non-Fibrous,Cementitious,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 2 220091651-02.1 No NAD 1 Location: 1st Floor Bedroom 1 -Plaster-Skim Coat (by.NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description:White,Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 2 220091651-02.2 No NAD 1 Location: 1st Floor Bedroom 1 -Plaster-Base Coat (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description:Grey,Homogeneous,Non-Fibrous,Cementitious,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 3 220091651-03 No NAD 1 Location: 2nd Floor Family Room-Plaster (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Grey,Homogeneous,Non-Fibrous,Cementitious,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 4 220091651-04 No NAD 1 Location: 1st Floor Living Room Area-Skim Coat (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description:White,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% See Reporting notes on last page AmeriSci Job#: 220091651 Page 2 of 7 Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report 7 Quarry Crossing Queensbury, Throughout Client No. !HGA Lab No. Asbestos Present Total %Asbestos 5 220091651-05 No NAD 1 Location: 1st Floor Bedroom 1 -Skim Coat (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description:White,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 6 220091651-06 No NAD 1 Location: 2nd Floor Family Room-Skim Coat (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description:White, Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 7 220091651-07 No NAD 2 Location: 1st Floor Dining Room Area-Sheetrock (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Brown/White,Heterogeneous,Fibrous,Bulk Material Asbestos Types: Other Material: Cellulose 15%, Non-fibrous 85% 8 220091651-08 No NAD 2 Location: 2nd Floor Bedroom 4 Area-Sheetrock (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Brown/White,Heterogeneous,Fibrous,Bulk Material Asbestos-Types: Other Material: Cellulose 15%, Non-fibrous 85% 9 220091651-09 No NAD 2 Location: 1st Floor Dining Room Area-Joint Compound (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst-Description:White,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% 10 220091651-10 No NAD 2 Location: 2nd Floor Bedroom 4 Area-Joint Compound (by NYS ELAP 198.1) by Bo Sun • on 09/11/20 Analyst Description:White,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 100% See Reporting notes on last page AmeriSci Job#: 220091651 Page 3 of 7 • Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report 7 Quarry Crossing Queensbury, Throughout Client No. /HGA Lab No. Asbestos Present Total %Asbestos 11 220091651-11 No NAD 3 Location: 1st Floor Bath Area-Bottom Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black/Brown, Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 16.7% 12 220091651-12 No NAD 3 Location: 1st Floor Area-Bottom Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black/Brown,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 18% 13 220091651-13 No NAD 3 Location: 1st Floor Bath Area-Mid Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 22.7% 14 220091651-14 No NAD 3 Location: 1st Floor Bath Area-Mid Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 14.6% 15 220091651-15 No NAD 3 Location: 1st Floor Bath Area-Top Layer Flooring Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Black/Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 25.5% 16 220091651-16 No NAD 3 Location: 1st Floor Bath Area-Top Layer Flooring Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black/Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 17% See Reporting notes on last page AmeriSci Job#: 220091651 Page 4 of 7 Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report 7 Quarry Crossing Queensbury, Throughout Client No. / HGA Lab No. Asbestos Present Total %Asbestos 17 220091651-17L1 No NAD 3 Location: 1st Floor Bath Area-6"Top Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 • Analyst Description:Beige,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 40% 17 220091651-17L2 No NAD 3 Location: 1st Floor Bath Area-Adhesive (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black/Brown, Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 32.7% 18 220091651-18L1 No NAD 3 Location: 1st Floor Bath Area-6"Top Layer Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Beige,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 60.6% 18 220091651-18L2 No NAD 3 Location: 1st Floor Bath Area-Adhesive (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black/Brown,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 31.2% 19 220091651-19 No NAD 4 Location: Front Window-Window Glaze (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Grey, Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 2.2% 20 220091651-20 No NAD 4 Location: Right Side Window-Window Glaze (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 3.4% See Reporting notes on last page • AmeriSci Job#: 220091651 Page 5 of 7 Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report 7 Quarry Crossing Queensbury, Throughout Client No. !HGA Lab No. Asbestos Present Total %Asbestos 21 220091651-21 Yes 44.4% 5 Location: Basement-Heat Duct Wrapping (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Grey,Homogeneous,Fibrous,Bulk Material Asbestos Types:Chrysotile 44.4% Other Material: Non-fibrous 55.6 22 220091651-22 NA/PS 5 Location: Basement-Heat Duct Wrapping Analyst Description:Bulk Material Asbestos Types: Other Material: 23 220091651-23 No NAD 6 Location: Kitchen Wall Under Wood Siding Interior-Vapor Barrier (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Red/Tan, Homogeneous,Fibrous,Bulk Material Asbestos Types: Other Material: Cellulose 100%, Non-fibrous Trace 24 220091651-24 No NAD 6 Location: 2nd Floor Wall Under Siding Interior-Vapor Barrier (by NYS ELAP 198.1) by Bo Sun on 09/11/20 Analyst Description: Red/Tan,Homogeneous,Fibrous,Bulk Material Asbestos Types: Other Material: Cellulose 100%, Non-fibrous Trace 25 220091651-25 No NAD 7 Location: Under Transite Siding Exterior-Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 3.9% 26 220091651-26 No NAD 7 Location: Under Transite Siding Exterior-Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 15.2% See Reporting notes on last page AmeriSci Job#: 220091651 Page 6 of 7 Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report 7 Quarry Crossing Queensbury, Throughout Client No. / HGA Lab No. Asbestos Present Total %Asbestos 27 - 220091651-27 No NAD 8 Location: On Sheetrock In Bathroom Area-Tile Adhesive (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 21.1 % 28 220091651-28 No NAD 8 Location: On Sheetrock In Bathroom Area-Tile Adhesive (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 30.8% 29 220091651-29 No NAD 9 Location: 2nd Floor Bedroom 3 Closet-Sheet Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Grey,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 5.1 30 220091651-30 No NAD 9 Location: 2nd Floor Bedroom 3 Closet-Sheet Flooring (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Grey,Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 12.4% 31 220091651-31 No NAD 10 Location: Small Side Roof-Rolled Roofing (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 34.1 % 32 220091651-32 No NAD 10 Location: Small Side Roof-Rolled Roofing (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black, Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 24.3% See Reporting notes on last page • • AmeriSci Job#: 220091651 Page 7 of 7 Client Name: AirWater Environmental, LLC PLM Bulk Asbestos Report • 7 Quarry Crossing Queensbury, Throughout Client No. /HGA Lab No. Asbestos Present Total %Asbestos 33 220091651-33 No NAD 11 Location: Right Side-Roof Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 31.5% 34 220091651-34 No NAD 11 Location: Left Side-Roof Vapor Barrier (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous, Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 27.3% 35 220091651-35 No NAD 12 Location: Right Side-Roof Shingle (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description:Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 51.4% 36 220091651-36 No NAD 12 Location: Left Side-Roof Shingle (by NYS ELAP 198.6) by Bo Sun on 09/11/20 Analyst Description: Black,Homogeneous,Non-Fibrous,Bulk Material Asbestos Types: Other Material: Non-fibrous 66.2% • Reporting Notes: (1) This PLM job was lyz ing Nikon Labophot Pol Scope S/N 954314 Analyzed by:Bo Sun ( *NAD/NSD=no asbestos de ted;NA=not analyzed;NA/PS=not analyzed/positive stop,(SOF-V)=Sprayed On Fireproofing containing Vermiculite; (SM-V)=Surfacing Material containing Vermiculite;PLM Bulk Asbestos Analysis by Appd E to Subpt E,40 CFR 763(NVLAP 200546-0),ELAP PLM Method 198.1 for NY friable samples,which includes the identification and quantitation of vermiculite or ELAP 198.6 for NOB samples or EPA 400 pt ct by EPA 600-M4-82-020(NY ELAP Lab 11480);Note:PLM is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. NAD or Trace results by PLM are inconclusive,TEM is currently the only method that can be used to determine if this material can be considered or treated as non asbestos-containing in NY State(also see EPA Advisory for floor tile,FR 59,146,38970,8/1/94)National Institute of Standards and Technology Accreditation requirements mandate that this report must not be reproduced except in full without the approval of the lab.This PLM report relates 0 ems ted AIHA-LAP,LLC Lab ID 102843,RI Cert AAL-094,CT Cert PH-0186,Mass Cert AA000054. Reviewed By:_ /` END OF REPORT AmeriSci Job#: 220091651 Page 1 of 3 Client Name: AirWater Environmental, LLC Table I Summary of Bulk Asbestos Analysis Results 7 Quarry Crossing Queensbury, Throughout Sample Heat Acid Insoluble AmeriSci HG Weight Sensitive Soluble Non-Asbestos **Asbestos%by *`Asbestos%by Sample# Client Sample# Area (gram) Organic% Inorganic% Inorganic% PLM/DS TEM 01 1 1 — -- — -- NAD NA Location: 1st Floor Living Room Area-Plaster 02.1 2 1 — -- — — NAD NA Location: 1st Floor Bedroom 1-Plaster-Skim Coat 02.2 2 1 — -- — — NAD NA Location: 1st Floor Bedroom 1-Plaster-Base Coat 03 3 1 — — — -- NAD NA Location: 2nd Floor Family Room-Plaster 04 4 1 -- -- — -- NAD NA Location: 1st Floor Living Room Area-Skim Coat 05 5 1 — — — -- NAD NA Location: 1st Floor Bedroom 1-Skim Coat 06 6 1 — -- -- -- NAD NA Location: 2nd Floor Family Room-Skim Coat 07 7 2 — — -- -- NAD NA Location: 1st Floor Dining Room Area-Sheetrock 08 8 2 — — -- — NAD NA Location: 2nd Floor Bedroom 4 Area-Sheetrock 09 9 2 — — — — NAD NA Location: 1st Floor Dining Room Area-Joint Compound 10 10 2 — — — --- NAD NA Location: 2nd Floor Bedroom 4 Area-Joint Compound 11 11 3 0.227 72.8 10.5 16.7 NAD NAD Location: 1st Floor Bath Area-Bottom Layer Flooring 12 12 3 0.231 68.4 13.6 18.0 NAD NAD Location: 1st Floor Area-Bottom Layer Flooring 13 13 3 0.246 67.7 9.6 22.7 NAD NAD Location: 1st Floor Bath Area-Mid Layer Flooring 14 14 3 0.185 74.3 11.1 14.6 NAD NAD Location: 1st Floor Bath Area-Mid Layer Flooring 15 15 3 0.143 72.6 1.9 25.5 NAD . NAD Location: 1st Floor Bath Area-Top Layer Flooring Vapor Barrier See Reporting notes on last page AmeriSci Job#: 220091651 Page 2 of 3 Client Name: AirWater Environmental, LLC Table Summary of Bulk Asbestos Analysis Results 7 Quarry Crossing Queensbury,Throughout Sample Heat Acid insoluble AmeriSci HG Weight Sensitive Soluble Non-Asbestos "Asbestos%by "Asbestos%by Sample# Client Sample# Area (gram) Organic% Inorganic% Inorganic% PLM!DS TEM 16 16 3 0.227 73.1 9.9 17.0 NAD NAD Location: 1st Floor Bath Area-Top Layer Flooring Vapor Barrier 17L1 17 3 0.200 30.9 29.1 40.0 NAD NAD Location: 1st Floor Bath Area-6"Top Layer Flooring 17L2 17 3 0.081 52.2 15.1 32.7 NAD NAD Location: 1st Floor Bath Area-Adhesive 18L1 18 3 0.186 37.7 1.7 60.6 NAD NAD Location: 1st Floor Bath Area-6"Top Layer Flooring 18L2 18 3 0.357 62.2 6.6 31.2 NAD NAD Location: 1st Floor Bath Area-Adhesive 19 19 4 0.272 52.1 45.8 2.2 NAD NAD Location: Front Window-Window Glaze 20 20 4 0.358 48.2 48.4 3.2 NAD Chrysotile<1.0 Location: Right Side Window-Window Glaze 21 21 5 - - - --- Chrysotile 44.4 NA Location: Basement-Heat Duct Wrapping 22 22 5 - - - - NA/PS NA Location: Basement-Heat Duct Wrapping 23 23 6 - - - - NAD NA Location: Kitchen Wall Under Wood Siding Interior-Vapor Barrier 24 24 6 - - - -- NAD NA Location: 2nd Floor Wall Under Siding Interior-Vapor Barrier 25 25 7 0.149 89.2 6.9 3.9 NAD NAD Location: Under Transite Siding Exterior-Vapor Barrier 26 26 7 0.324 81.4 3.4 15.2 NAD NAD Location: Under Transite Siding Exterior-Vapor Barrier 27 27 8 0.149 69.0 10.0 21.1 NAD NAD Location: On Sheetrock In Bathroom Area-Tile Adhesive 28 28 8 0.213 62.1 7.1 30.8 NAD NAD Location: On Sheetrock In Bathroom Area-Tile Adhesive 29 29 9 0.182 84.0 10.9 5.0 NAD Anthophyllite Trace Location: 2nd Floor Bedroom 3 Closet-Sheet Flooring See Reporting notes on last page AmeriSci Job#: 220091651 Page 3 of 3 . Client Name: AirWater Environmental, LLC Table I Summary of Bulk Asbestos Analysis Results 7 Quarry Crossing Queensbury,Throughout Sample Heat Acid Insoluble AmeriSci HG Weight Sensitive Soluble Non-Asbestos "Asbestos%by "Asbestos%by Sample# Client Sample# Area (gram) Organic% Inorganic% Inorganic% PLMiDS TEM 30 30 9 0.197 76.6 11.0 12.4 NAD NAD Location: 2nd Floor Bedroom 3 Closet-Sheet Flooring 31 31 10 0.251 61.6 4.3 34.1 NAD NAD Location: Small Side Roof-Rolled Roofing 32 32 10 0.244 71.3 4.5 24.3 NAD NAD Location: Small Side Roof-Rolled Roofing 33 33 11 0.173 60.5 8.0 31.5 NAD NAD Location: Right Side-Roof Vapor Barrier 34 34 11 0.274 62.2 10.6 27.3 NAD NAD Location: Left Side-Roof Vapor Barrier 35 35 12 0.183 42.7 6.0 51.4 NAD NAD Location: Right Side-Roof Shingle 36 36 12 0.149 27.7 6.0 66.2 NAD NAD Location: Left Side-Roof Shingle Analyzed by:M Peysakhov-Hitachi#747/Noran ;Date Analyzed 9/11/2020 "'Quantitative Analysis(Semi/Full);Bulk Asbestos Analysis-PLM by Appd E to Subpt E.40 CFR 763 or NYSDOH ELAP 198.1 for New York friable samples or NYSDOH ELAP 198.6 for New York NOB samples;TEM(Semi/Full)by EPA 600/R-93/116(or NYSDOH ELAP 198.4;for New York samples);NAD=no asbestos detected during a quantitative analysis;NA=not analyzed;Trace=<1%;(SOF-V)= Sprayed On Fireproofing containing Vermiculite;(SM-V)=Surfacing Material containing Vermiculite;Quantitation for beginning weights of<0.1 grams should be considered as qualitative only;Qualitative Analysis:Asbestos analysis results of"Present"or"NVA=No Visible Asbestos"represents results for Qualitative PLM or TEM Analysis only(no accreditation coverage available from any regulatory agency for qualitative analyses):NVLAP(PLM)200546-0,NYSDOH ELAP Lab 11480,AIHA-LAP,LLC(PLM)Lab ID 102843. Warning Note:PLM limitation,only TEM will resolve fibers<0.25 micrometers in diameter.TEM bulk analysis Is representative of the fine grained matrix material and may not be representative of non-uniformly dispersed debris for 'ch P valuation is recommended(i.e.soils and other heterogenous materials). Reviewed By: AirWater Environmental LLC (518 376-7345 1.Client• AirWater Environmental 2.Project Name _2a.Project Address 2b.Client Contact: 7 Quarry Crossing Queensbury 3.Additional Notes: • 4.Inspector/Signature �� 5.Collection Date:9-3-2020 Building has transite siding and demolition of the inside was well underway. 4 i7.`x�c nipqt/c3r #?}'ry C�.�L �e r . 8.Sample TAT: 7.Building Name: 8.Sampling reas' �l� 9.Comments:(Field) • . o 24 HR o 48 HR • Throughout X Analyze to First Positive By Homogeneous Material "72 HR 5 Day . o Other • X For Negative NOB PLM's,continue to TEM BULK SAMPLE LOCATION TYPE OF MATERIALS 10. 11.Bulk 12.Sampled Material 13.Type of Material 14.Sample Location , 15. 16. 17.Quantity 18.Asbestos Homogeneous Sample ID • Friability Condition (LF,SF,EA) Content(Type Area Number Number Surf TSI MISC. Sample (N/F) (G,D,SD) &%) 1 1 Plaster X 1°'Floor Living Room Area F SD 1 2 Plaster X „1n1 Floor Bedroom 1 F SD 1 3 Plaster X lFf"d Floor Family Room F SD # 2 2 0 0 9 1 6 5 1 . 1 4 Skim Coat X 11�°�Floor Living Room Area F SD 1 5 Skim Coat X 15`Floor Bedroom 1 F SD 1 6 Skim Coat X 2"d Floor Family Room F SD 2 7 Sheetrock X llst Floor Dining Room Area F D 2 8 Sheetrock X ;2"d Floor Bedroom 4 Area • F D • i . 2 9. Joint Compound X '1at Floor Dining Room Area F D 2 10 Joint Compound X i 2nd Floor Bedroom 4 Area F D 3 11 Bottom Layer Flooring X i1st Floor BathArea N SD Approx 80 . sq' 3 12 Bottom Layer Flooring X i1"Floor Bath Area N SD 3 13 Mid Layer Flooring - X 1st Floor Bath Area • N .;; SD CHAIN OF CUSTODY LAB INFORMATION' . 19.Rellnqui. .,,By: • 20.Date 21.Time 22. eceived : ' a 24+:�Tiimme� 26.Lab Name 28.Date 27.Time 1 �I/ • 9-9 O cet, /V��.... 1WC7' a.Analyzed By: 6gJ it•11 t t;►'� II • b � Isi � 9�Sie. f•ATTf/© III c.Lab Batch#: • . 28.Project Manager: 29.Results To: 30: Special Instructions: JTS• . SnvderJNY(E Gmaii.com 198.1. 198.6 and TEM stop at first positive . Ai rWaterBruceOlOutlook.com . j AirWater Environmental LLC (518 376-7345 ' 2.Project Name 2a.Project Address 2b.Client Contact: ,.client: AirWater Environmental •7 Quarry Crossing Queensbury ' 3.Additional Notes: 4.Inspector/Signature 6.Collection Date:9-3-2020 Building has transite siding - 6.Sample TAT: 7.Building Name: B.Sampling Areas: 9.Comments:(Field) 0 24 HR ❑48 HR Throughout %Analyze to First Positive By Homogeneous Material .712HR 5 Day • a Other i X For Negative NOB PLM's,continue to TEM BULK SAMPLE LOCATION TYPE OF MATERI 4LS 10. 11.Bulk 12.Sampled Material 13.Type of Material `14.Sample Location 15. 16. 17.Quantity 18.Asbestos Homogeneous Sample ID J Friability Condition (LF,SF,EA) Content(Type • Area Number Number • Surf TSI MISC sample (N/F) (G,D,SD) &%) 3 14 Mid Layer Flooring • X 115t Floor Bath Area N SD 3 15 Top Layer Flooring Vapor Barrier X `101 Floor Bath Area N SD 3 16 Top Layer Flooring Vapor Barrier X i1°t Floor Bath Area • N SD #2 2 0 0 9 1 6 51 :; 17 6°Top Layer Flooring W/Adhesive X 1°t Floor Bath Area N SD 3 18 6°Top Layer Flooring W/Adhesive X �1$`Floor Bath Area N SD 4 19 Window Glaze X ;Front Window N SD 16 Units 4 20 Window Glaze X Right Side Window N SD 5 21 Heat Duct Wrapping X 'Basement N D Approx 20 sq' 5 22 Heat Duct Wrapping X Basement N D 6 23 Vapor Barrier X ,Kitchen Wall Under Wood Siding Interior N SD Approx 200 sq' 6 24 Vapor Barrier X 2nd Floor Wall Under Wood Siding N SD Interior 7 25 Vapor Barrier X )Under Transite Siding Exterior • N D 7 26 Vapor Barrier X ;Under Transite Siding Exterior N D CHAIN OF CUSTODY LAB INFORMATION 19.Relinquished By: 20.Date 21.Time 22 eiv By: 2 . e 24.Time 25.Lab Name 26.Date 27.Time I %' a.Analyzed By: 150 51,AA 1.1(.7.t I1 In II l b. , P /4►°,- gels!/z3s, ,e'de.,:411=7 Ill c.Lab Batch#: 28.Project Manager. 29.Results To: 30: Special Instructions: JTS SnvderJNYAGmail.com 198.1. 198.6 and TEM stop at first positive Ai rWaterBruce0Outlook.com 0doP3 AirWater Environmental LLC (518 376-7345 • 1.client: AirWater Environmental 2.Project Name 2a.Project Address 2b.Client Contact: 7 Quarry Crossing Queensbury • 3.Additional Notes: 4.InspectorlSignature 5.Collection Date:9-3-2020 Building has transite siding 6.Sample TAT: 7.Building Name: 8.Sam g 9.Comments:(Field) c 24 HR o 48 HR plan Areas: -®-72 HR 6 Day Throughout X Analyze to First Positive By Homogeneous Material o Other I x For Negative NOB PLM's,continue to TEM _ BULK SAMPLE LOCATION TYPE OF MATERI LS 10. 11.Bulk 12.Sampled Material 13,Type of Material 14.Sample Location 15. 16. 17.Quantity 18.Asbestos Homogeneous Sample ID Friability Condition (LF,SF,EA) Content(Type Area Number Number Surf TSI MISC Sample (N/F) (G,D,SD) &%) 8 27 Tile Adhesive X lOn Sheetrock In Bathroom Area N SD Approx 2 sq' 8 28 Tile Adhesive X On Sheetrock In Bathroom Area N SD ,9 29 Sheet Flooring X 2nd Floor Bedroom 3 Closet N D Approx 80 sq' 9 30 Sheet Flooring X 2nd Floor Bedroom 3 Closet N D 10 31 Rolled Roofing X Small Side Roof N SD Approx 160 sq' 10 32 Rolled Roofing X Small Side Roof N SD 11 33 Roof Vapor Barrier X (Right Side N D I , 11 34 Roof Vapor Barrier X Left Side N D 12 35 Roof Shingle X Right Side N D 12 36 Roof Shingle X !Left Side N D #220091651 _ _ CHAIN OF CUSTODY LAB INFORMATION 19.Relinquished By: 20.Date 21.Time 22.R Received �"tl�''ei y: 23 e 24.Time 25.Lab Name 26.Date 27.Time I '/(� �i a.Analyzed By: /305 k,L 9`(l•LC 13:ifO II III bjl r� �� it.✓x=._ c.Lab Batch#: 28.Project Manager: 29.Resuits To: 30: Special Instructions: JTS SnvderJNY(a�Gmail.com 198.1. 198.6 and TEM stop at first positive . • Ai rWaterBruceeOutlook.com • fS 3or3 , i AirWater Environmental LLC (518 376-7345 1.Client: AirVVater Environmental 2.Project Name 2a.Project Address 2b.Client Contact 7 Quarry Crossing Queensbury 3.Additional Notes: . 4.Inspector/Signature 5.Collection Date:9-3-2020 Building has transite siding and demolition of the inside was well underway. 6.Sample TAT: 7.Building Name: 8 Sampling Areas Da ❑ 72 HR 5 Day Throughout 9.Comments:(Field) . o 72 HR ❑ HR X Analyze to First Positive By Homogeneous Material o Other 'X For Negative NOB PLM's,continue to TEM BULK SAMPLE LOCATION TYPE OF MATERIALS 10. 11.Bulk 12.Sampled Material 13.Type of Material 14.Sample Location 15. 16. 17.Quantity. 18.Asbestos Homogeneous Sample ID - Friability Condition (LF,SF,EA) Content(Type Area Number Number Surf TSI MISC Sample (N/F) (G,D,SD) &%) 1 1 Plaster 'X 18t Floor Living Room Area F. SD 1 2 Plaster X 1st Floor Bedroom 1 F SD 1 3 Plaster X 2nd Floor Family Room F SD 1 4 Skin Coat X 1st Floor Living Room Area F SD 1 5 Skin Coat X 1st Floor Bedroom 1 F SD 1 6 Skim Coat X 21d Floor Family Room F SD 2 7 .Sheetrock X 1st Floor Dining Room Area F D 2 8 Sheetrock X ' 2"11 Floor Bedroom 4 Area F - D 2 9 Joint Compound X 1st Floor Dining Room Area F D 2 10 Joint Compound X 2"d Floor Bedroom•4 Area F D 3 11 Bottom Layer Flooring X 1s`Floor Bath Area N SD Approx 80 . • sq' 3 . 12 Bottom Layer Flooring X 1st Floor Bath Area N ' SD 3 13 Mid Layer Flooring ' X 1st Floor Bath Area N SD CHAIN OF CUSTODY LAB INFORMATION _19.Relinquished By: 20.Date 21.Time 22.Received By: 23.Date 24.Time 25.Lab Name 26.Date. 27.Time a.Analyzed By: II . b.QC by: III c.Lab Batch#: 28.Project Manager. 29.Results To: 30: Special Instructions: JTS ' SnvderJNYO.Gmaill.com 198.1. 198.6 and TEM stop at first positive AirliVaterBruce(a.Outlook.com r AirWater Environmental LLC (518 376-7345 1.Client• AirWater Environmental 2•Project Name 2a.Project Address 2b.Client Contact: 7 Quarry Crossing Queensbury 3.Additional Notes: 4.Inspector/Signature Building has transits siding 5.Collection Date:9-3-2020 - 6.Sample TAT: ' 7.Building Name: 9:Comments:(Field) ❑ 24 HR ❑48 HR 8.Sampling Areas: X.Analyze to First Positive By Homogeneous Material o 72 HR 5 Day Throughout o Other X For Negative NOB PLM's,continue to TEM - BULK SAMPLE LOCATION TYPE OF MATERIALS 10. 11.Bulk 12.Sampled Material 13.Type of Material 14.Sample Location 15. 16. 17. Quantity 18.Asbestos Homogeneous Sample ID Friability Condition (LF,SF, EA) Content(Type. Area Number Number Surf TSI MISC Sample (N/F) , (G,D,SD) &%) 3 14 Mid Layer Flooring X 15t Floor Bath Area N SD 3 15 Top Layer Flooring Vapor Barrier X 15`Floor Bath Area N SD • 3 16 Top Layer Flooring Vapor Barrier X 161 Floor Bath Area N, SD 3 17 6"Top Layer Flooring W/Adhesive X 1s`Floor Bath Area N SD 3 18 6"Top Layer Flooring W/Adhesive X 1s1 Floor Bath Area N SD • 4 19 Window Glaze X Front Window N SD 16 Units 4 20, Window Glaze X 'Right Side Window N SD 5 21 Heat Duct Wrapping X Basement N D Approx 20 sq' 5 22 Heat Duct Wrapping X Basement N D 6 23 Vapor Barrier X Kitchen Wall Under Wood Siding Interior N SD Approx 200 sq' 6 24 Vapor Barrier X 2nd Floor Wall Under Wood Siding N SD Interior • 7 25 Vapor Barrier X Under Transite Siding Exterior N D 7 26 Vapor Barrier X Under Transite Siding Exterior N D CHAIN OF CUSTODY _ . LAB INFORMATION 19.Relinquished By: 20.Date 21.Time 22.Received By: 23.Date 24.Time 25.Lab Name 26.Date 27.Time I _ a.Analyzed By: II - b.QCby: III c.Lab Batch#: 28.Project Manager: 29.Results To: 30: Special Instructions: JTS SnvderJNYCa?Gmail.com 198.1. 198.E and TEM stop at first positive AirWaterBruce(c Outlook.com AirWater Environmental LLC (518 376-7345 • 1.Client• AirWater Environmental 2.Project Name 2a.Project Address 2b.Client Contact: 7 Quarry Crossing Queensbury 3.Additional Notes: 4.Inspector/Signature 5.Collection Date:9-3-2020 Building has transite siding • 6.Sample TAT: 7.Building Name: 8.Sampling Areas 9.Comments:(Field) ❑ 24 HR ❑48 HR X Analyze to First Positive By Homogeneous Material o 72 HR 5 Day Throughout o Other X For Negative NOB PLM's,continue to TEM BULK SAMPLE LOCATION TYPE OF MATERIALS 10. 11.Bulk 12.Sampled Material 13.Type of Material 14.Sample Location 15. 16. 17.Quantity 18.Asbestos Homogeneous Sample ID Friability Condition (LF,SF,EA) Content(Type Area Number Number Surf. TSI MISC Sample (N/F) (G,D,SD) &%) 8 27 Tile Adhesive X On Sheetrock In•Bathroom Area N SD Approx 2 sq' 8 28 Tile Adhesive X On Sheetrock In Bathroom Area N SD 9 29 Sheet Flooring X 2nd Floor Bedroom'3 Closet N D Approx 80 sq' 9 30 Sheet Flooring X 2nd Floor Bedroom 3 Closet N D 10 31 Rolled Roofing X Small Side Roof N SD Approx 160 sq' 10 32 Rolled Roofing X Small Side Roof N SD 11 33 Roof Vapor Barrier X Right Side N D 11 34 Roof Vapor Barrier X Left Side N D 12 35 Roof Shingle X Right Side N D 12 36 Roof Shingle X Left Side N D CHAIN OF CUSTODY LAB INFORMATION 19.Relinquished By: 20.Date 21.Time 22.Received By: 23.Date 24.Time 25.Lab Name 26.Date 27.Time a.Analyzed By:. II b.QC by: III c.Lab Batch#: 28.Project Manager. 29.Results To: 30: Special Instructions:. JTS SnvderJNY@GrriaiLcom ' 198.1. 198.6 and TEM stop at first positive A i rWaterB ru ceCa?O utIoo k.co m 7 Quarry Crossing Mid Renovation Survey ThroughOUt p[curial Reprel.tentation- NTS ,Alt Meatnnertients Are Estimated • 4 A • 0 S. 4 1 Approx 2 s 21,22 More may exis.tirLfido walls I J. 1 • 4% - Metal.Duet Work 1 '34,, raarsafr-,,,,,70 Basement 7 Quarry Crossing Mid Renovation Survey Throughout Pictorial Representation-NTS All Measurements Are Estimated Eledroom 2- . . . . . iaR»a. Wood studwalls Kitchen ' 23 27,28 • 7,9 bathroom 1 11-18 w9 . • • Dining Room . • 25 Living Room 1,4 14 1st Floor • • • 7 Quarry Cios hg Md Renovation Survey • Throughout Pictorial Representation-NTS All Mensurementa,Ate Estimated • • • Bedroom4 Closet 1.171(11 .33,35 A 31,32` �stt • 29,30 4,7 24, • • 34,36 a 1 Closet • �J Bedroom 2 Bedroom 3 • • 2nd Floor ATTACHMENT B LICENSE AND CERTIFICATIONS -J -'New York State Department Labor-. =" ." \}\ . Division of+Safety and Healthy `' .�- ��\ • - 1 License and Certificate/Unit r i �� �7 •' 1\ 1 ,1 State Campus,'Buildingg 12 ,; -� ,` ,-,r- .1-`-` `,•\ 1 .�'- " Albany,-NY 12240 ~----� �- �r'� ''-"\ `" `'\ ,' , ,e: \ \` -JASBESTOS HANDLING LICENSE'. f- ;',i �f `�: ` ` ,- .�,, . tic. �'1—�\ Airwater_Environmental;LLC i i ' ,, FILE NUMBER: 16;97582 .' )' ',\ — .. / `' z`J' � _ LICENSE NUMBER:'-97582` ;: "-i', \, �!�P.O: Bok 1071 �'),h\,_ ' LICENSE CLASS: RES fRICTED:- ,� ;- , / DATE OF ISSUE: 11/27/2019 / , / �'Averill'Park,.'NY 1201,8� :t ' .i h- EXPIRATIONS DATE: 11/30/2020 y— ,� ° I f } , ♦ ,v a . � )r�� J, h • ki1� \\\ . (` i 0 Y 1 `;f -t. y f%111+IIy,/�ee_' �1P��F+ Z— _ — _ — -] - _1 � .111 I'-� E ,�`1 l 11/ I' I'; -rI,'s^i ` -. ,`7 -% / �:�- / :fC~'it ' ' l� Duly Authorized Representative—John'TIS,nyder-- -/ `, '�, . II ti----1 \ ,.1'1 1 This license-has been issued in accordancelwith,applicable, rovisions o£Article 30'of the Labor.Law of New York'State and o ; t 1 -1, \ l re 1' i 171:• 1''' p S f ii '_ f Al',:�• II'=3 • t t l , the New-York-State Codes,Rules and Regulations;- 12 NYCRR Part 56). -lt is,subject to.suspension or revocation,for a(1) i� i 4. 9. C, 5 i v I l t h • V hl r 111� - "iti ''''"t '''t I serious violation of,state,federal or local laws with regard-to the conduct's) an�asbestosiproject,or(2)demonstrated lack of res1ponsibility in the conduct of any joblmvolvingkasbestos or.asbestos'material- J(,7 ,lN. o f - `=�. yy iJ '' ,,-,_ .r- „�'1�1r.: `'{ �.a'�„jy'�,.�5/ p-• ` ,_...� ra ." , i _a �j 1( I This�license is;valid only for the contractor named;above and--thiglicense oa-photoco�pymust_be_'promineritly displayed/at the asbestos project worksite, •This-license verifies that all:persons_employed1byithe licensee on an=asbestos project in-New York State have beenussued an`Asbestos Certificate;appropriate for the�,t eiof work-they perform,by the New York State .- i Departmeht of Labor. , - y r-----ii •, 4.....,:...., .--.,---,,,. ..<,,,,, r-----) (ir' f , ....." _,,.... ._, 1 . 1 --- `` -Eileen M.Franko, Director SH 432(8/12) -For the Commissioner of Labor Bruce Campbell Asbestos Extended by NYSDOL Until COVID 19 Allows Training to Commence ��` h ' ASBESTOS;CERI1FICATE � z� •ia£ BRUCE W.CAMPBELL JR CLASS(EXPIRES) prat ; C ATE (05/20):D INSP(0i20) ;;t ,Fl PM (05/20) ,_ • t 1 1 t I�v4 6 : MUST BE CARRIED ON ASBESTOS PROJECTS nn6u tit n ,A Í»°¬»³¾»® íð¬¸ô îðîð Ó®ò Ì»¼ ß®²­¬»·² Ì·½±²¼»®±¹¿ ײ½ò ÐòÑò Þ±¨ ìîíé Ï«»»²­¾«®§ô ÒÇ ïîèðì Ю±¶»½¬æ é Ï«¿®®§ Ý®±­­·²¹ Ï«»»²­¾«®§ô Ò»© DZ®µ ïîèðì Ó®ò ß®²­¬»·²ô Ù®»»²¾®·¿® ݱ²­¬®«½¬·±² Í»®ª·½»­ô ÔÔÝ ·­ °´»¿­»¼ ¬± °®±ª·¼» ¬¸» º±´´±©·²¹ ´«³° ­«³ °®±°±­¿´ º±® ¬¸» ¿¾¿¬»³»²¬ ­»®ª·½»­ ®»¯«·®»¼ ¿¬ ¬¸» ¿¾±ª»ó®»º»®»²½»¼ °®±¶»½¬ò ײ½´«¼»¼ ·² ͽ±°» ±º ɱ®µæ Ó±¾·´·¦¿¬·±² ±º ´¿¾±®ô »¯«·°³»²¬ô ³¿¬»®·¿´­ô ¿²¼ ­«°»®ª·­·±² ¬± ¿²¼ º®±³ ­·¬»ò ß¾¿¬»³»²¬ ±º ¿­¾»­¬±­ó½±²¬¿·²·²¹ ¬¸»®³¿´ ­§­¬»³­ ·²­«´¿¬·±² øÌÍ×÷ à ¾¿­»³»²¬ò Ï«¿²¬·¬·»­ ·²½´«¼»¼ ¿®» ´»­­ ¬¸¿² îì ÍÚ ±º ÌÍ×ò λ³±ª¿´ ¿²¼ ´»¹¿´ ¼·­°±­¿´ ±º ¿´´ ¿­¾»­¬±­ó½±²¬¿·²·²¹ ³¿¬»®·¿´ ¬± ¿ ½»®¬·º·»¼ ´¿²¼º·´´ º¿½·´·¬§ °»®³·¬¬»¼ ¬± ¿½½»°¬ ­«½¸ ³¿¬»®·¿´ò ײ½´«¼»­ ®»¯«·®»¼ ÑÍØß ³±²·¬±®·²¹ò ײ½´«¼»­ ®»¯«·®»¼ °®±¶»½¬ ½´±­»±«¬ ¼±½«³»²¬¿¬·±²ò Û¨½´«­·±²­æ Ø¿¦¿®¼±«­ ±® ®»¹«´¿¬»¼ ³¿¬»®·¿´ ¿¾¿¬»³»²¬ ±® ®»³»¼·¿¬·±² ±º ¿­¾»­¬±­ô ³±´¼ô ´»¿¼ô ÐÝÞô ®»º®·¹»®¿²¬­ô ³»®½«®§ô ËÍÌô °¿·²¬­ô ­±´ª»²¬­ô »¬½ò ±¬¸»® ¬¸¿² ¬¸» ¿º±®»³»²¬·±²»¼ò Ü·­½±²²»½¬·±²ô ®»´±½¿¬·±²ô ·­±´¿¬·±²ô ±® ¬»®³·²¿¬·±² ±º «¬·´·¬§ ­»®ª·½»­ò Ì»³°±®¿®§ б©»® ¿²¼ ©¿¬»®ò ÒÇÍ Í¿´»­ Ì¿¨ò ̸·®¼ó°¿®¬§ ³±²·¬±®·²¹ô ½±²­«´¬·²¹ô ¬»­¬·²¹ô »²¹·²»»®·²¹ô ±® ¿²¿´§¬·½¿´ ­»®ª·½»­ò Ó«²·½·°¿´ ¾«·´¼·²¹ °»®³·¬­ò ß²§ ±¬¸»® ©±®µ ¾»­·¼»­ ©¸¿¬ ·­ °®»ª·±«­´§ ­°»½·º·»¼ ·² ¬¸» ¿¾±ª» ­½±°» ±º ©±®µò Ô«³° Í«³ Ю·½·²¹æ üïôïçëòðð ÒÇÍ Í¿´»­ Ì¿¨æ ü èíòêë ̱¬¿´æ üïôîéèòêë Ю±¶»½¬ ͽ¸»¼«´»æ Ù®»»²¾®·¿® ݱ²­¬®«½¬·±² Í»®ª·½»­ ¿²¬·½·°¿¬»­ ¿°°®±¨·³¿¬»´§ ï ¼¿§ø­÷ º±® ­¿º» ¿²¼ ­«½½»­­º«´ °®±¶»½¬ ½±³°´»¬·±² ±º ¬¸» ¿¾¿¬»³»²¬ º®±³ ¿ ­¬¿®¬ ¼¿¬» ³«¬«¿´´§ ¿¹®»»¼ «°±² ¾§ ¬¸» ½±²¬®¿½¬±® ¿²¼ ±©²»®ò Ì»®³­ ú ݱ²¼·¬·±²­æ ̸» ¬»®³­ ±º ¬¸·­ ¯«±¬¿¬·±² ­¸¿´´ ¾» ·²½±®°±®¿¬»¼ ·²¬± ¿²¼ ³¿¼» °¿®¬ ±º ¿²§ º«¬«®» ½±²¬®¿½¬«¿´ ¿¹®»»³»²¬ ¾»¬©»»² ¾±¬¸ °¿®¬·»­ò Ñ©²»® ¬± °®±ª·¼» Ì¿¨ Û¨»³°¬ ±® Ý¿°·¬¿´ ׳°®±ª»³»²¬ Ý»®¬·º·½¿¬·±² ±¬¸»®©·­» ¿°°´·½¿¾´» ­¿´»­ ¬¿¨ ³¿§ ¿°°´§ò ײ­«®¿²½» º«®²·­¸»¼ ¬± ¬¸» ´·³·¬­ ¿²¼ ­¸±©² ±² ¬¸» ¿¬¬¿½¸»¼ ­¿³°´» ÝÑ×ò Ò± °»®½»²¬¿¹» ±º °¿§³»²¬ ­¸¿´´ ¾» ®»¬¿·²»¼ º±® ¿²§ °»®·±¼­ ±º ¬·³»ò ß²§ ¾¿´¿²½»­ ±ª»® í𠼿§­ ©·´´ ¾» ½¸¿®¹»¼ ·²¬»®»­¬ ¿¬ ¿ ®¿¬» ±º îòëû °»® ³±²¬¸ò ß´´ ³¿¶±® ½®»¼·¬ ½¿®¼­ ¿½½»°¬»¼ ¿¬ ¿ ®¿¬» ±º íòëû °»® ¬®¿²­¿½¬·±²ò Ï«±¬» ·­ ¾¿­»¼ ±² ½«®®»²¬ ´¿²¼º·´´ô º«»´ô ³¿¬»®·¿´ô »¬½ò ½±­¬ ¿¬ ¬¸» ¬·³» ±º »­¬·³¿¬»ò ß²§ ·²½®»¿­»­ ¿º¬»® í𠼿§­ ©·´´ ¿°°´§ ±² ¿ ½±­¬ó°´«­ ¾¿­·­ò [[2567,4434,4209,4547][11][,I,][Z@RD84D.tmp]]Çk£†`±Ãø£”14Yø”£«—”£—£±†È [[4183,4434,4233,4547][11][,,][Z@RD346.tmp]] ß´´ ©±®µ ©·´´ ¾» ½±³°´»¬»¼ ·² ¿² ±°»² ­¸±° »²ª·®±²³»²¬ ¼«®·²¹ ²±®³¿´ ¾«­·²»­­ ¸±«®­ô Ó±²¼¿§óÚ®·¼¿§ô «²´»­­ ±¬¸»®©·­» ­¬¿¬»¼ò [[2458,4662,3789,4775][11][,I,][Z@RD84D.tmp]]ɔ`ñêÐ_Д†ª£†ê±kÈ [[3762,4662,3812,4775][11][B,,][Z@RD56B.tmp]] ß´´ ©±®µ ¬± ¾» ½±³°´»¬»¼ «²¼»® ¿ ­·²¹´» °®±¶»½¬ ³±¾·´·¦¿¬·±² «²´»­­ ±¬¸»®©·­» ­¬¿¬»¼ò Í·²½»®»´§ô êÚÎÉÉñÎÈÙÔÊ  Greenbriar Construction Services, LLC 49 Wilshire Drive Albany, NY 12205 (518) 621-6512 ß½½»°¬¿²½» ±º Ю±°±­¿´ ݱ²¼·¬·±²­ Ò±¬·½» ¬± Ю±½»»¼æ [[600,2183,650,2296][11][,I,][Z@RD84D.tmp]] [[600,2371,650,2484][11][,I,][Z@RD84D.tmp]] [[600,2558,829,2671][11][,I,][Z@RD84D.tmp]]Û« [[823,2558,2532,2671][11][,,][Z@RD346.tmp]]æ ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ [[2504,2558,2554,2671][11][,,][Z@RD346.tmp]] [[600,2746,1092,2859][11][,I,][Z@RD84D.tmp]]Æ—”ª†ÃªÐ [[1089,2746,1184,2859][11][,,][Z@RD346.tmp]]æ [[1155,2746,1288,2859][11][,,][Z@RD346.tmp]] [[1259,2746,2449,2859][11][,,][Z@RD346.tmp]] ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ [[2446,2746,2496,2859][11][,,][Z@RD346.tmp]] [[600,3309,964,3422][11][,I,][Z@RD84D.tmp]]ÂÃЪ†k” [[957,3309,2555,3422][11][,,][Z@RD346.tmp]]æ ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ [[2527,3309,2577,3422][11][,,][Z@RD346.tmp]] [[600,3496,785,3609][11][,I,][Z@RD84D.tmp]]† [[779,3496,874,3609][11][,,][Z@RD346.tmp]]æ [[845,3496,998,3609][11][,,][Z@RD346.tmp]] [[969,3496,1749,3609][11][,,][Z@RD346.tmp]]ÁÁÁÁÁÁÁÁÁÁÁÁÁ ÁÁÁÁ [[1746,3496,2480,3609][11][,,][Z@RD346.tmp]]ÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁÁ [[2476,3496,2526,3609][11][,,][Z@RD346.tmp]] ß½µ²±©´»¼¹»³»²¬ ±º п§³»²¬ Ì»®³­ ú ݱ²¼·¬·±²­æ ÁÁÁÁÁÁÁÁÁÁÁÁ øײ·¬·¿´÷ New York State Department of Labor Division of Safety and Health License and Certificate Unit State Campus, Building 12 Albany, NY 12240 ASBESTOS HANDLING LICENSE Greenbriar Construction Services, LLC FILE NUMBER: 18-111579 LICENSE NUMBER: 111579 49 Wilshire Drive LICENSE CLASS: FULL DATE OF ISSUE: 03/24/2020 Albany, NY 12205 EXPIRATION DATE: 04/30/2021 Duly Authorized Representative Scott Loudis: This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material. This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor. Eileen M. Franko, Director For the Commissioner of Labor SH 432 (8/12)