Loading...
PTI-006591-2019 10292019INSPECTION WORKSHEET (PTI-006591-2019) PT-0676-2019Permit Management Case Number:Case Module: 10/29/2019Failed Inspection Date:Inspection Status: Dave HatinProperty Transfer Inspections Inspector:Inspection Type: 239.8-1-33 Job Address:Parcel Number: 23 Cayuga Dr Queensbury, NY 12804 Contact TypeCompany NameName ApplicantDenise Clairmont Trust ContractorIBS Septic Checklist ItemPassedComments WatertightFalse Weather/lack of information/inaccessibilityFalse Service contract (required)False Holding tank (if yes, include capacity)False Capacity in gallonsFalse System/components indicate unacceptableFalse Is there a high water alarm?False Roof gutters don't discharge over leach fieldFalse Concrete tankFalse Temperature (Fahrenheit)False D-box materialFalse Apparent structural damageFalse Visible scum layerFalse Septic tank (include # of tanks)False Number of tank compartmentsFalse Plumbing fixtures tested & confirmedFalse Evidence of a pipe bypassing tankFalse Holding Tank:verify level risescap. w/in 250 galFalse Metal septic or leech tank or cesspoolFalse System appears undersized/undersized componentsFalse Foundation drain(s)False Is there evidence of surface water infiltratingFalse StormwaterFalse Tank coverFalse System appears to have functioned adequatelyFalse System passes all function testingFalse Outlet pipe (automatic failure, if yes)False Metal tank (automatic failure)False Does the pump(s) appear to be operating properly?False Surface discharge? (if yes, to where?)False Roof runoffFalse System needs repairsFalse Sump pump not connected to septic systemFalse October 23, 2020Page 1 of 3 INSPECTION WORKSHEET (PTI-006591-2019) Checklist ItemPassedComments Sand filterFalse Leaching bedFalse Outflow line invert above leach line invert(s)?False Overflow pipe (automatic failure)False Depth below grade to top of tankFalse Evidence of prolonged high liquid levelFalse Access riser? (if yes, depth to cover)False CesspoolFalse Inlet baffleFalse Recommend upgrade/expand/replace 1+ componentsFalse Aerobic systemFalse No treatment tank/other critical component(s)False Dosing or pump tank sealedFalse Sump pump(s)False Absorption fieldFalse ModelFalse TypeFalse On-site as-built req'd before insp is completeFalse Water softener not hooked to septic systemFalse As-built provided is accurateFalse Evidence of liquid above outlet inverts?False Test each fixture flow to septic tankFalse Cracked, corroded or deformed?False Main tank cleanout size and locationFalse OtherFalse ManufacturerFalse Seepage Pits: NumberFalse Water tight tankFalse Outlet baffleFalse Number of drop box(es)False WeatherFalse Is tank pumped more than 4x/year?False Leaking water fixturesFalse Ejector or grinder pump sealedFalse Raised systemFalse Plastic tankFalse OtherFalse OtherFalse Solids in D-boxFalse Cracked, corroded or deformed?False Mound systemFalse Liquid level AT/ABOVE/BELOW (one) discharge invertFalse October 23, 2020Page 2 of 3 INSPECTION WORKSHEET (PTI-006591-2019) Checklist ItemPassedComments Excavate 18" around,no leach field connectedFalse Are there any obvious electrical shortcomings?False OtherFalse Are both switch and alarm operable?False October 23, 2020Page 3 of 3