Loading...
as built . -7�o--2,6�� ENVIRONMENTAL DESIGN eco PARTNERSHIP, LLP, 900 Route 146 Clifton Park,NY 12065 (P)518.371.7621 (F)518.371.9540 edplip.com Shaping the physical environment October 28, 2020 Town of Queensbury Building&Code Enforcement 742 Bay Road Queensbury, NY 12804 t� t� lip [ _: Attn: Dave Hatin OCT .3 0 2C 0 Re: MacElroy Wastewater—103 Knox Road Glrifiil OF OUEf fV,,Bf1P1'- f3G�ll_�ff����';COQES Dear Dave: In an effort to provide the Town with final compliance documentation regarding the wastewater system serving the referenced property I offer the following. The design plans, prepared by this office and reviewed and approved by the Town as associated with the wastewater system application,are as follows: Proposed Replacement Wastewater System for the MacElroy Residence • C-1 Cover Sheet • S-1 Site Plan for Wastewater System • S-2 Existing Conditions A_S BUIL� • S-3 Wastewater Details • S-4 Enhanced Treatment Unit Details During the course of construction I was onsite on numerous days observing the installation of all major components of the system. It is noted and represented by the attached "As-Built' plan that several minor changes were made to the system during construction. Those include a slight change to the septic tank and reactor tank locations and the sizing of each tank. The tank capacities remain the same ....Septic—2000 gallons and Reactor—1000 gallons. The enhanced treatment mechanisms (PuraFlo Sequential Batch Reactor)were installed, programmed and set into operation in May 2020. 1 have monitored its operation and the wastewater system has operated successfully and as designed over these past five months. It is my opinion that the wastewater system has been installed in compliance with the approved plans and is operating as intended. Sincerely, ennis MacElroy, PE Environmental Design Partnership Attachments Cc: MacElroy Camp, LLC Charlie Dyer