Loading...
CC-0630-2020Office Use Only ADDITION ALTERATION PERMIT Permit#: CC 0 t+2 5Q - ZO 243 APPLICATION Permit Fee: $ of uecn b 7ay oad`,tieensbury,NY 12804 Invoice#: 50 Cot) P:518-761-8256 www.queensburv.net Project Location: 27 Carey Road, Queensbury,NY(West Mountain 2) Tax Map ID #: 309„13-2=11.2 Subdivision Name: Og . Ilo-2 -2.Z CONTACT INFORMATION: Applicant: Name(s): Bast Hatfield Construction, LLC (Steve Kestler) Mailing Address, C/S/Z: 1399 Crescent-Vischer Ferry Road, Clifton Park,NY Cell Phone: (518) 858-8695 Land Line: (518) 688-8315 Email: skestler@basthatfield.com Primary Owner(s): Name(s): Hudson Headwaters Health Network Mailing Address, C/S/Z: 9 Carey Road, Queensbury, NY 12804 (attention Dal Valentini) Cell Phone: (518) 857-3408 Land Line: (518)'761-0300, ext. 31624 Email: dvalentini@hhhn.org 0 Check if all work will be performed by homeowner only Contractor(s): Contact Name(s): Bast Hatfield Construction, LLC Contractor Trade: General Contractor Mailing Address, C/S/Z: 1399 Crescent-Vischer Ferry Road, Clifton Park,NY 12065 Cell Phone: (518) 858-8695 Land Line: (518) 688-8315 Email: skestler@basthatfield.com List all additional contractors on the back of this form GE Architect(s)/Engineer(s): Business Name: Architecture Plus C."92°2° Contact.Name(s): Melissa Goodwill TOWN OFMailingAddress, C/S/Z: 297 River Street, Tory,NY 12180 EVIL®ih9C&CO©S Cell-Phone: _( Land Line: (518) 272-4481 Email: goodwillm@aplususa.com Contact Person for Building & Code Compliance: same as above Cell Phone: _( Land Line: _( Email: . Addition/Alteration Application Revised-February 2019 PROJECT INFORMATION: TYPE: x Commercial Residential WORK CLASS: Single-Family Two-Family- Multi-Family (#of units Townhouse Business Office Retail El Industrial/Warehouse El Garage (#of cars 0 Other (describe) Medical Storage ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 3,848 sf 2nd floor: 2" d floor: 3rd floor: 3rd floor: Basement (habitable space):Basement (habitable space): Total square feet: Total square feet: 3,848 sf ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $509,000 2. If Commercial project, what is the proposed use: Medical Storage 3. Source of heat: X Gas Oil Propane Solar Other Fireplaces need a separate Fuel Burning Appliances &Chimney Application 4. Are there any structures not shown on the plot plan? EYES ENO Explain: 5. Are there any easements on the property? EYES ENO 6. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? N/A-interior renovation only b. Is this a corner lot? EYES NO c. Will the grade be changed as a result of the construction? EYES x NO d. What is the water source? PUBLIC El PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? SEPTIC (being transitioned to.SEWER) Addition/Alteration Application Revised February 2019 DECLARATION: 1. I acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans-and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: Steve Kestler SIGNATURE: 1'- ti DATE: 10/7/20 Addition/Alteration Application Revised February 2019 HOTPower-Exhausted and Separated-Combustion, kr@l„); J Gas-Fired Unit Heater Specifications DMA -FILE C®Cc_0050_zoio MOUNTING HOLES TYP G MODE1,/ ADJU5TABLE LOUVERS POWER VENTER MODEL HD) BRACKETS VENT PIPE CONNECTION HDS L GAS CONNECTION Illi.l, 1.00 O. O ACCESS illil I PANEL t\A- 1111 OPENING" A j iIF COMBUSTION'AIR j/O LjII!I',LOUVERS(HD ONLY) 0' eAl L C D OPENING K - COMBUSTIONAIR J ELECTRICAL CONNECTION INLET CONNECTION MODEL HDS) MODEL HDS) 1 H ACCESS VIEW REAR VIEW Performance Dimensions (inches) Model Size 30 45 60 75 100 125 Model Size 30 45 60 75 . 100/125 BtuHr.Input 30,000 45,000 60,000 75,000 100,000 125,000 A 26.8 '26.8 26.8 26.8 35.5 Btu/Hr Output 24,000 36,000 48,000 60,000 80,000. 100,000 B 12.2 12.2 18.0 18.0 20.5 Entering Airflow(CFM). 505 720 990 1,160 1,490 1,980 C 16.5 16.5 16.5 16.5 22.0 Outlet Velocity 523 749 653 769 565 747 D 14.9 14.9 14.9 14.9 22.5 Air Temp.Rise(°F), 44 46 45 48 50 47 E 10.1 10.1. 15.9. 15.9 18.4 Mounting Height(Max ft.) 10 10 ' 12 14 12 16 F 7.25 : 7.25 10.75 10.75 14.0 Heat Throw(ft.) 25 27 36 38 42 56 G 18.5 18.5 18.5 18.5 24.0 Horsepower 1/15 1/15 - 1/12 . 1/12 1/12 1/8 H 7.6 7.6 7.835 7.835 8.4 Motor RPM 1,550 1,550 1,625 1,625 1,050 1,550 Gas Connection 1/2 1/2 1/2 1/2 1/2 Data Type S.P. S.P. P.S.C. P.S.C. S.P. P.S.C. I 34.5 34.5 34.5 34.5 43.0 Amps 2.4 2.4 1.2 1.2 2.7 2.2 J 22 22 25 25 31.0 Unit Total Amps 3.7 3.7 2.5 '2.5 . 4.7 4.2 K(HDS only) 2.74 2.74 3.15 3.15 3.87 L(HDS only) 3.19- 3.19 5.55 5.55 10.73 Vent Connector Size(in.) 3 3 3/4* 3/4* . 4 Mounting Combustion Air Inlet Connector 3 3 4 4 4 Size(Model HDS only)(in.) 1"-angle,mounting brackets are slotted to accommodate joists Fan Diameter 10 10 14 14 18.0 on 16"or 24"centerlines. Approx.Shipping Weight(lbs.) 55 60 80 85 125 t I } ( I0I 3".for Model HD,4"for'Model HDS SIZES o 0 0 0 0 0 0° ° ° ° ° 30-75 N Clearances of 6 I: of r ai ' N N NNNNN Unit Side Clearance To Recommended, o 0 0 0 0 . 0 0 0 0 ... 0 0 Combustible Materials Service Clearance II I l l l I I III I I I I I Top and Bottom 1° 1° SIZES0toinIntn0w. U 100/125 'ro'. 'o". 0 " 'on. 'ro'. 'on. c Access Side 1° 18' c"i. ai F of (ACCESSORY) N N N N N c%f ccn rC') Non-Access Side 1° 1" Rear 18" 18 Vent Connector 4" 4" Control Options Control Description Control Service Thermostat Type of Model Code No. Voltage Voltage Gas Size Single-Stage,Direct Spark Ignition,100%Shut-Off with Continuous Retry 11 115V 24V natural 30-125 Utilizes a single-stage combination gas control with ignition control. Gas is lit with a direct spark igniter on call for heat. 21 115V 24V propane 30-125 Two-Stage,Direct Spark Ignition,100%Shut-Off with Continuous Retry 12 115V 24V natural 75-125 Utilizes a two-stage,combination gas control with built-in ignition control. Firing rate is 100%and 50%of full rated input.Gas is lit with a direct spark 22 115V 24V propane 75-125 igniter on call for heat. Section Final Inspection Complies? Comments/Assumptions Req.ID C403.2.4. ;Automatic Controls:Setback to 55°F Complies Exception: Requirement does not apply. 2.1, +(heat)and 85°F(cool); 7-day clock,2- Does Not C403.2.4. hour occupant override, 10-hour 2.2 backup Not Observable F140]3 i ONot Applicable C403.2.4. ;Systems include optimum start Complies Exception: Requirement does not apply. 2.3 controls. Does Not FI41]3 I Not Observable ONot Applicable C405.4.1 Interior installed lamp and fixture Complies See the Interior Lighting fixture schedule for values. FI18]1 lighting power is consistent with what Does Not is shown on the approved lighting plans, demonstrating proposed watts Not Observable are less than or equal to allowed Observable,..., Applicable watts. C408.2.1 Commissioning plan developed by Complies Requirement will be met. F128]1 registered design professional or Does Not approved agency. Location on plans/spec: 230005ONotObservable O Not Applicable C408.2.3. HVAC equipment has been tested to DComplies Exception: Unitary or packaged HVAC eqiupment without 1 ensure proper operation.Does Not supply air economizers. FI31]1 Not Observable O Not Applicable C408.2.3. HVAC control systems have been Complies Requirement will be met. 2 tested to ensure proper operation, Does Not FI10]1 calibration and adjustment of controls. [' Not Observable O Not Applicable C408.2.4 Preliminary commissioning report Complies Requirement will be met. F129]1 completed and certified by registered Does Not design professional or approved Not Observable Location on plans/spec: 230005 agency. Not Applicable C408.2.5. Furnished HVAC as-built drawings Complies Requirement will be met. 1, submitted within 90 days of system Does Not F17]3" 'acceptance. Not Observable ONot Applicable C408.2.5. Furnished as-built drawings for Complies Requirement will be met. 1 electric power systems within 90 days Oboes Not FI16]3 !of system acceptance. Not Observable Not Applicable C408.2.5. An air and/or hydronic system Complies Requirement will be met. 3 balancing report is provided for HVAC ODoes Not F143]1 systems. Not Observable Location on plans/spec: 230005 O Not Applicable C408.2.5. Final commissioning report due to Complies Requirement will be met. 4 building owner within 90 days of Does Not F130]1 receipt of certificate of occupancy. :Not Observable Location on plans/spec: 230005 O Not Applicable C408.3 Lighting systems have been tested to Complies Requirement will be met. FI33]1 ensure proper calibration, adjustment, DDoes Not programming, and operation. DNot Observable Location on plans/spec: 265010 Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 16 of 16 T f Section w' Final Inspection Complies? Comments/Assumptions Req.ID C303.3, Furnished O&M instructions for DComplies Requirement will be met. C408.2.5. ;systems and equipment to the Does Not 2 building owner or designated FI17]3 ;representative. DNot Observable Not Applicable C303.3, . ;Furnished O&M manuals for HVAC Complies Requirement will be met. C408.2.5. ;systems within 90 days of system Does Not 3 acceptance. DNot Observable DNot Applicable C402.5.6 Weatherseals installed on all loading DComplies FI37]1 dock cargo door openings and provide Does Not direct contact along the top and sides of vehicles parked in the doorway. [' Not Observable DNot Applicable C402.5.6 Weatherseals installed on all loading DComplies FI37]1 dock cargo door openings and provide Does Not direct contact along the top and sides of vehicles parked in the doorway. DNot Observable Not Applicable C402.5.6 Weatherseals installed on all loading DComplies FI37]1 dock cargo door openings and provide Does Not direct contact along the top and sides of vehicles parked in the doorway. Not Observable DNot Applicable C402.5.6 Weatherseals installed on all loading DComplies FI37]1 dock cargo door openings and provide Does Not direct contact along the top and sides of vehicles parked in the doorway. DNot Observable DNot Applicable C402.5.8 ;Recessed luminaires in thermal DComplies FI26]3 :envelope to limit infiltration and be IC Does Not rated and labeled.Seal between interior finish and luminaire housing. [' Not Observable DNot Applicable C403.2.2 HVAC systems and equipment DComplies Requirement will be met. F127]3 ;capacity does not exceed calculated Does Not loads. Location on plans/spec: 230005NotObservable DNot Applicable C403°.2.4. :Heating and cooling to each zone is DComplies Requirement will be met. 1 controlled by a thermostat control. ODoes Not FI47]3 ;Minimum one humidity control device ['Not Observable Location on plans/spec: M301 per installed humidification/dehumidification DNot Applicable system. C403.4.1. ;Thermostatic controls have a 5 °F DComplies Requirement will be met. 2 deadband.Does Not FI38]3 ; Location on plans/spec: M001NotObservable DNot Applicable C403.2.4. ;Temperature controls have setpoint Complies Exception: Requirement does not apply. 1.3 yoverlap restrictions. Does Not FI20]3` , DNot Observable DNot Applicable C403.2.4. ;Each zone equipped with setback Complies Exception: Requirement does not apply. 2 controls using automatic time clock or Does Not FI39]3 ;programmable control system.Not Observable Not Applicable 1 High Impact(Tier 1) 2. Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 15 of 16 Section Insulation Inspection Complies? Comments/Assumptions Req.ID C303.1 Roof insulation installed per Complies IN3]1 manufacturer's instructions. Blown or Does Not poured loose-fill insulation is installed only where the roof slope is<=3 in ONot Observable 12.ONot Applicable C402.2.1 Insulation installed on a suspended Complies IN20]1 ceiling having ceiling tiles is not being Does Not specified for roor/ceiling assemblies. Continuous insulation board installed DNot Observable in 2 or more layers with edge joints Not Applicable offset between layers. C303.1 Building envelope insulation is labeled Complies IN10]2 with R-value or insulation certificate Does Not providing R-value and other relevant data. DNot Observable Not Applicable C303.2 Above-grade wall insulation installed Complies IN7]1 per manufacturer's instructions.ODoes Not DNot Observable DNot Applicable C303.2.1 ;Exterior insulation is protected from Complies IN14]2 ;damage with a protective material. Does Not Verification for exposed foundation insulation may need to occur during :Not Observable Foundation Inspection. Not Applicable C105 Installed above-grade wall insulation Complies See the Envelope Assemblies table for values. IN6]1 type and R-value consistent with Does Not insulation specifications reported in plans and COMcheck reports. Not Observable ONot Applicable C402.2.3 Installed floor insulation type and R- Complies See the Envelope Assemblies table for values. 1N8]2 value consistent with insulation DDoes Not specifications reported in plans and COMcheck reports. DNot Observable ONot Applicable C402.2.6 ;Radiant panels and associated Complies IN18]3 components,designed for heat Does Not transfer from the panel surfaces to the occupants or indoor space are Not Observable insulated with a minimum of R-3.5. DNot Applicable C105 Installed roof insulation type and R- ElComplies See the Envelope Assemblies table for values. IN2]1 value consistent with insulation Does Not specifications reported in plans and COMcheck reports. For some ceiling DNot Observable systems,verification may need to ONot Applicable occur during Framing Inspection. C402.5.1. All sources of air leakage in the Complies 1 building thermal envelope are sealed, Does Not IN1]1 caulked,gasketed,weather stripped or wrapped with moisture vapor- DNot Observable permeable wrapping material to DNot Applicable minimize air leakage. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 14 of 16 Section Rough-In Electrical Inspection Complies? Comments/Assumptions Req.ID C405.2.3, Daylight zones provided with Complies Exception: Requirement does not apply. C405.2.3. I individual controls that control the ODoes Not 1, lights independent of general area ONot ObservableC405.2.3. ;lighting.See code section C405.2.3 2 Daylight-responsive controls for ONot Applicable EL23]2 ;applicable spaces,C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone. C405.2.4 Separate lighting control devices for Complies Requirement will be met. EL26]1 specific uses installed per approved Does Not lighting plans. Location on plans/spec: E301ONotObservable Not Applicable C405.2.4 Additional interior lighting power Complies Requirement will be met. EL27]1 allowed for special functions per the Does Not approved lighting plans and is ONot Observable Location on plans/spec: E301 automatically controlled and separated from general lighting.DNot Applicable C405.3 Exit signs do not exceed 5 watts per Complies Requirement will be met. EL6]1 face. Does Not ONot Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 13 of 16 Section Rough-In Electrical Inspection Complies? Comments/Assumptions Req.ID C405.2.2. ;Spaces required to have light- DComplies Exception: Lighting that is related to means of egress in 2 reduction controls have a manual DDoes Not stairways, ramps,corridors, or emergency routes. EL22]1 :control that allows the occupant to [' Not Observable reduce the connected lighting load in Location on plans/spec: E301 a reasonably uniform illumination Not Applicable pattern >= 50 percent. C405.2.1, Occupancy sensors installed in DComplies Requirement will be met. C405.2.1. classrooms/lecture/training rooms, DDoes Not 1 conference/meeting/multipurpose ['Not Observable Location on plans/spec: E301EL18]1 rooms,copy/print rooms, lounges/breakrooms, enclosed offices, ONot Applicable open plan office areas, restrooms, storage rooms,locker rooms, warehouse storage areas,and other spaces<=300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. C405.2.1. Occupancy sensors control function in DComplies Exception: Requirement does not apply. 2 warehouses: In warehouses,the DDoes Not EL19]1 lighting in aisleways and open areas is controlled with occupant sensors that Not Observable automatically reduce lighting power Not Applicable by 50%or more when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. C405.2.1. Occupant sensor control function in Complies Exception: Requirement does not apply. 3 open plan office areas: Occupant ['Does Not EL20]1 sensor controls in open office spaces [' Not Observable300sq.ft. have controls 1) Not ApplicableconfiguredsothatgenerallightingcanpP be controlled separately in control zones with floor areas<= 600 sq.ft. within the space, 2)automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 3)are configured so that general lighting power in each control zone is reduced by>=80%of the full zone general lighting power within 20 minutes of all occupants leaving that control zone, and 4) are configured such that any daylight responsive control will activate space general lighting or control zone general lighting only when occupancy for the same area is detected. C405.2.2, Each area not served by occupancy DComplies Exception: Lighting controlled by occupancy sensors. C405.2.2. ;sensors(per C405.2.1) have time- DDoes Not 1, switch controls and functions detailed [ Not Observable Location on plans/spec: E301 C405.2.2. ;in sections C405.2.2.1 and C405.2.2.2. Not ApplicablepPlicable EL21]2 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 12 of 16 Section Mechanical Rough-In Inspection Complies? Comments/Assumptions Req.ID C403.7.4 Exhaust air energy recovery on Complies Exception: Requirement does not apply. ME57]1 systems meeting Table C403.7.4(1) ODoes Not and C403.7.4(2). ONot Observable ONot Applicable C403.7.5 ;Kitchen exhaust systems comply with Complies Exception: Requirement does not apply. ME116]3 :replacement air and conditioned ODoes Not supply air limitations, and satisfy hood rating requirements and maximum Not Observable exhaust rate criteria. ONot Applicable C403.11.1HVAC ducts and plenums insulated in DComplies Exception: Requirement does not apply. accordance with C403.11.1 and Does Not C403.11.2;constructed in accordance with ME60]z C403.11.2,verification may need to ONot Observable occur during Foundation Inspection. Not Applicable C403.4.1. Heating for vestibules and air curtains Complies Exception: Requirement does not apply. 4 with integral heating include Does Not ME63]z automatic controls that shut off the [ Not Observableheatingsystemwhenoutdoorair temperatures >45F.Vestibule ONot Applicable heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint<= 60F and cooling setpoint>=80F. C408.2.2. ;Air outlets and zone terminal devices Complies Exception: Requirement does not apply. 1 have means for air balancing. DDoes Not ME53]3 I Not Observable ONot Applicable C403.5, ;Refrigerated display cases,walk-in Complies Exception: Requirement does not apply. C403.5.1, :coolers or walk-in freezers served by ODoes Not C403.5.2 ;remote compressors and remote Not ObservableME123]3 ;condensers not located in a condensing unit, have fan-powered ONot Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 11 of 16 Section Mechanical Rough-In Inspection Complies? Comments/Assumptions Req.ID C402.2.6 ;Thermally ineffective panel surfaces of DComplies Exception: Requirement does not apply. ME41]3 sensible heating panels have Does Not insulation >= R-3.5. ONot Observable ONot Applicable C402.5.5, ;Stair and elevator shaft vents have DComplies C403.2.4. ;motorized dampers that automatically ODoes Not 3 close. Refernece section C403.7.7 for ME3]3 ;operational details. Not Observable ONot Applicable C403.11.3I HVAC piping insulation insulated in Complies Exception: Requirement does not apply. ME61]2 ;accordance with Table C403.11.3. Does Not Insulation exposed to weather is protected from damage and is ONot Observable provided with shielding from solar ONot Applicable radiation. C403.8.4 ;Motors for fans that are not less than DComplies Requirement will be met. ME142)2 1/12 hp and less than 1 hp are Does Not electronically commutated motors or Location on plans/spec: M001 have a minimum motor efficiency of ['Not Observable 70 percent.These motors have the Not Applicable means to adjust motor speed. C403.8.5 Each DX cooling system> 65 kBtu DComplies Exception: Requirement does not apply. ME143]2 sand chiller water/evaporative cooling Does Not system with fans> 1/4 hp are designed to vary the indoor fan airflow ONot Observable as a function of load and comply with ONot Applicable detailed requirements of this section. C403.12.1;Systems that heat outside the building DComplies Exception: Requirement does not apply. ME71]2 !envelope are radiant heat systems Does Not controlled by an occupancy sensing device or timer switch. ONot Observable ONot Applicable C403.2.3 ;HVAC equipment efficiency verified. DComplies See the Mechanical Systems list for values. ME55]2 s Does Not Not Observable Not Applicable C403.2.2 Natural or mechanical ventilation is DComplies Exception: Requirement does not apply. ME59]1 provided in accordance with Does Not International Mechanical Code Chapter 4. Mechanical ventilation has ONot Observable capability to reduce outdoor air supply Not Applicable to minimum per IMC Chapter 4. C403.7.1 Demand control ventilation provided DComplies Exception: Requirement does not apply. ME59]1 for spaces>500 ft2 and>25 Does Not people/1000 ft2 occupant density and served by systems with air side Not Observable economizer, auto modulating outside ONot Applicable air damper control,or design airflow 3,000 cfm. C403.7.2 ;Enclosed parking garage ventilation Complies Exception: Requirement does not apply. ME115]3 has automatic contaminant detection DDoes Not and capacity to stage or modulate fans to 50%or less of design capacity. DNot Observable ONot Applicable C403.7.6 HVAC systems serving guestrooms in DComplies Exception: Requirement does not apply. ME141]3 Group R-1 buildings with > 50 Does Not guestrooms: Each guestroom is provided with controls that Not Observable automatically manage temperature ONot Applicable ssetpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2). 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 10 of 16 Section° Plumbing Rough=lnInspection Complies? Comments/Assumptions Req.ID C404.5, ;Heated water supply piping conforms Complies Exception: Requirement does not apply. C404.5.1, Ito pipe length and volume Does Not C404.5.2 °;requirements. Refer to section details. Not ObservablePL6]3 1DNot Applicable C404.6.3 ;Pumps that circulate water between a DComplies Exception: Requirement does not apply. PL7]3 ;heater and storage tank have controls Does Not that limit operation from startup to 5 minutes after end of heating Not Observable cycle. Not Applicable C404.7, ;Demand recirculation water systems Complies Exception: Requirement does not apply. PL8]3 have controls that start the pump Does Not upon receiving a signal from the Not Observable action of a user of a fixture or appliance and limits the temperature Not Applicable of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 9 of 16 Section Framing/Rough-In Inspection Complies? Comments/Assumptions Req.ID C303.1.3 ;Fenestration products rated in OComplies FR12]2 accordance with NFRC. ODoes Not Not Observable Not Applicable C303.1.3 Fenestration products are certified as Complies FR13]1 to performance labels or certificates ODoes Not provided. ONot Observable O Not Applicable C402.4.3 Vertical fenestration SHGC value. Complies See the Envelope Assemblies table for values. FR10]1 ODoes Not O Not Observable O Not Applicable C402.4.3, Vertical fenestration U-Factor. OComplies See the Envelope Assemblies table for values. C402.4.3. ODoes Not 4 1 Not ObservableFR8] DNot Applicable C402.4.4 I U-factor of opaque doors associated OComplies See the Envelope Assemblies table for values. FR14]2 with the building thermal envelope ODoes Not meets requirements. Not Observable ONot Applicable C402.5.1 The building envelope contains a OComplies FR16]1 continuous air barrier that is sealed in ODoes Not an approved manner and either constructed or tested in an approved ONot Observable manner.Air barrier penetrations are Not Applicable sealed in an approved manner. C402.5.2, Factory-built fenestration and doors Complies C402.5.4 !are labeled as meeting air leakage ODoes Not FR18]3 ;requirements. Not Observable ONot Applicable C402.5.7 Vestibules are installed on all building Complies FR17]3 entrances. Doors have self-closing ODoes Not devices. ONot Observable O Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 8 of 16 Section Footing_I Foundation Inspection, Complies? Comments/Assumptions Req.ID C303.2 ;Slab edge insulation installed per Complies F0412 manufacturer's instructions. ODoes Not ONot Observable ONot Applicable C303.2.1 Exterior insulation protected against Complies F06]1 damage, sunlight, moisture,wind, Does Not landscaping and equipment maintenance activities. ONot Observable ONot Applicable C105` ;Installed slab-on-grade insulation type Complies See the Envelope Assemblies table for values. F03]2 and R-value consistent with insulation ODoes Not specifications reported in plans and COMcheck reports. Not Observable Not Applicable C402.2.4 ;Slab edge insulation depth/length. DComplies See the Envelope Assemblies table for values. F07]z ;Slab insulation extending away from ODoes Not building is covered by pavement or 10 inches of soil. ONot Observable Not Applicable C403.12.2;Snow/ice melting system and freeze Complies Exception: Requirement does not apply. protection systems have sensors and Does Not C403.12.3'controls configured to limit service for ONot ObservableF09]3 ;pavement temperature and outdoor itemperature.future connection to ONot Applicable controls. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 7 of 16 COMcheck Software Version COMcheckWeb il Inspection Checklist Energy Code: 2018 IECCIPA' Requirements: 69.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions Req.ID C103.2 Plans and/or specifications provide all Complies PR1]1 information with which compliance Does Not can be determined for the building envelope and document where Not Observable exceptions to the standard are Not Applicable claimed. C103.2 Plans,specifications, and/or Complies Requirement will be met. PR2]1 calculations provide all information Does Not with which compliance can be Not Observable Location on plans/spec: 230005determinedforthemechanical systems and equipment and Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans,specifications,and/or Complies Requirement will be met. PR4]1 calculations provide all information Does Not with which compliance can be Location on plans/spec: 260010 determined for the interior lighting and electrical systems and equipment Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C402.4.1 The vertical fenestration area <= 30 DComplies PR10]1 percent of the gross above-grade wall ODoes Not area. Not Observable Not Applicable C402.4.1 The skylight area <= 3 percent of the Complies PR11]1 gross roof area. Does Not ONot Observable DNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 6 of 16 COMcheck Software Version COMcheckWeb ill.„‘(1 Mechanical Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: HHHN Storage Building Location: Glens Falls, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent:Designer/Contractor: Mechanical Systems List Quantity System Type&Description 1 HVAC System (Unknown w/PerimeterSystem): Heating: 2 each-Unit Heater, Gas, Capacity= 125 kBtu/h Proposed Efficiency=80.00%Ec, Required Efficiency: 80.00%Ec Fan System: FAN SYSTEM 1--Compliance(Motor nameplate HP method) : Passes Fans: FAN 1 Supply,Constant Volume, 1775 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Scott Swenson 10/26/2020 Name-Title Signature Date Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 5 of 16 COMcheck Software Version COMcheckWeb ril Exterior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: HHHN Storage Building Project Type: Alteration Exterior Lighting Zone 0 (Unspecified) Construction Site: Owner/Agent:Designer/Contractor: Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/ Wattage B X C) Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 350 a)Wattage tradeoffs are only allowed between tradable areas/surfaces. b)A supplemental allowance equal to 350 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power Exterior Lighting TBD: Exterior lighting zone not specified (see project screen) Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 4 of 16 COMcheck Software Version COMcheckWeb Vtiril Interior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title:HHHN Storage Building Project Type: Alteration Construction Site: Owner/Agent:Designer/Contractor: Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts ft2) Watts/ft2 1-Warehouse Storage:Smaller, Hand-Carried Items 1800 0.69 1242 2-Automotive:Vehicular Maintenance Area 2000 0.56 1120 Total Allowed Watts= 2362 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixture Watt. Warehouse Storage: Smaller. Hand-Carried Items (1800 sq.ft.) LED: Other: 1 10 73 730 Automotive: Vehicular Maintenance Area (2000 sq.ft.) LED: Other: 1 11 73 803 Total Proposed Watts= 1533 e e Interior.Lighting PASSES %. Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Scott Swenson 10/26/2020 Name-Title Signature Date Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 3 of 16 Envelope PASSES Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. 101Mary. Kate Young AIA Principal 10/26/2020 Name-Title Signat r Date This is an existing engineered metal building that was not fully enclosed. The open sides are to be enclosed at part of this projett. r . 4• ryo 04 E Ti C Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 2 of 16 rill° COMcheck Software Version COMcheckWeb 444 Envelope Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: HHHN Storage Building FILE COPYLocation: Glens Falls, New York Climate Zone: 6a Project Type: Alteration Construction Site: Owner/Agent:Designer/Contractor: Building Area Floor Area 1-Storage for Vehicles and Equipment(Warehouse): 3200 Nonresidential Envelope Assemblies R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC Roof: Other Metal Building Roof, [Bldg. Use 1-Storage for 0.030 0.031 Vehicles and Equipment] (a) Floor: Unheated Slab-On-Grade, [Bldg. Use 1-Storage for 0.0 0.540 Vehicles and Equipment] NORTH Ext.Wall: Other Metal Building Wall, Heat capacity 0.0, 0.040 0.052 Bldg. Use 1-Storage for Vehicles and Equipment] (a) Door: Insulated Metal, Garage door 14 9.62168e- 0.067 0.310 3171azing, [Bldg. Use 1-Storage for Vehicles and Equipment] Door: Insulated Metal,Swinging, [Bldg. Use 1-Storage 0.090 0.370 for Vehicles and Equipment] Door: Insulated Metal,Swinging, [Bldg. Use 1-Storage 0.090 0.370 for Vehicles and Equipment] EAST Ext.Wall: Other Metal Building Wall, Heat capacity 0.0, 0.040 0.052 Bldg. Use 1-Storage for Vehicles and Equipment] (a) SOUTH Ext.Wall: Other Metal Building Wall, Heat capacity 0.0, 0.040 0.052 Bldg. Use 1-Storage for Vehicles and Equipment] (a) WEST Ext.Wall: Other Metal Building Wall, Heat capacity 0.0, 0.040 0.052 Bldg. Use 1-Storage for Vehicles and Equipment] (a) Door: Insulated Metal, Garage door 14 9.104e-317lazing, 0.067 0.310 Bldg. Use 1-Storage for Vehicles and Equipment] Door: Insulated Metal, Garage door 14 4.34778e- 0.067 0.310 3221azing, [Bldg. Use 1-Storage for Vehicles and Equipment] a)'Other'components require supporting documentation for proposed U-factors. b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Notes REVIEWED FOR ENERGY CODE COMPLIANCE Project Title: HHHN Storage Building Report date: 10/26/20 Data filename: Page 1 of 16