Loading...
Stormwater Narrative 900 New York 146 Clifton Park, NY 12065 (P) 518.371.7621 (F) 518.371.9540 edpllp.com STORMWATER MANAGEMENT NARRATIVE PROPOSED SUBDIVISION OF LANDS MOUNTAIN TERRACE ESTATES TOWN OF QUEENSBURY, NY Prepared by: Environmental Design Partnership Clifton Park, NY 12065 November 2020 Stormwater Management Narrative Tallow Wood Apartments Town of Clifton Park, New York 1.0INTRODUCTION JP Gross Properties, LLC is proposing to develop a 6-Lot subdivision on an existing 51.73± acre parcel on the north side of Luzerne Road between Tuthill Road west of the site and Twin Mountain Drive at the east of the site in the Town of Queensbury, New York. The proposed development will result in approximately 4.06 acres of soil disturbance with a slight increase in the overall impervious area on the site. Since the area of disturbance will be under 5.0 acre the project does not require permanent post development stormwater management. This narrative presents a review of the design concepts and parameters of the stormwater management system for the proposed development. The purpose of the stormwater management narrative is to assure that changes in the surface runoff characteristics, as a result of the proposed construction, will not adversely impact adjacent or downstream properties. 2.0EXISTING SITE CONDITIONS The existing site consists of predominantly wooded and brushy areas, and a vacant residential dwelling and detached garage, with associated driveway and previously lawn areas. Wetlands are center portion of the site. The site topography in the proposed main development area has slopes ranging from 2% to 14%. Elevations at the in main development area vary between 486 to 570 feet above sea level. A large portion of steep area is located in the center portion of the property. The site is bounded by private property to the north and east, and by Luzerne Road to the south and ant Tuthill road to the west. 3.0PROPOSED SITE CONDITIONS The post-development conditions of the site will result in minimal changes to runoff conditions. The existing residential dwelling and garage with associated driveway will be removed. Six (6) single family houses will be constructed, five (5) of them constructed on the eastern portion of the site, four (4) of the lots will use shared driveways to reduce impervious areas. Eave drain infiltration trenches will be used to attenuate and infiltrate the runoff from the proposed houses taking advantage of the sandy soils and quick infiltration rates of the site. Shallow grass depressions will be sized for each lot to reduce the runoff from the proposed driveways and any over flow from the eve drains. 4.0SUMMARY Development of the proposed property will change the stormwater drainage characteristics of the site; impervious area will be added and the site will be re-graded to support the proposed 900 New York 146 Clifton Park, NY 12065 (P) 518.371.7621 (F) 518.371.9540 edpllp.com Stormwater Management Narrative Tallow Wood Apartments Town of Clifton Park, New York improvements. Changes to the stormwater drainage characteristics of the site will be evaluated in accordance with the Design Manual. The proposed stormwater management system will be designed to comply with the recommendations in the Design Manual related to water quality, runoff reduction, channel protection, overbank flood control and extreme flood control for new development projects. The proposed stormwater management system will be designed to attenuate and treat the stormwater runoff generated from the contributing areas for storm events up to and including the 25-year design storm event. Prepared by: Owen Speulstra 900 New York 146 Clifton Park, NY 12065 (P) 518.371.7621 (F) 518.371.9540 edpllp.com