Loading...
RESFINAL-002432-2020 06022020INSPECTION WORKSHEET (RESFINAL-002432-2020) RC-0053-2020Permit Management Case Number:Case Module: 06/02/2020Partial Pass Inspection Date:Inspection Status: Charles DyerResidential Final Inspection Inspector:Inspection Type: 295.15-2-9 Job Address:Parcel Number: 73 John Clendon Rd Queensbury, NY 12804 Contact TypeCompany NameName ApplicantFOOTHILLS BUILDERS, LLC ContractorFOOTHILLS BUILDERS, LLC Granted PermissionFOOTHILLS BUILDERS, LLC Primary OwnerFOOTHILLS BUILDERS, LLC Checklist ItemPassedComments Low flow toilet 1.3 gal/flushing cycleTrue Bathroom Fans, if no windowTrue 3" Plumbing Vent through roof minimum 18 inchTrue Grade away from foundation: 6" down, 10' outTrue Final Survey Plot PlanTrue Window guards req:<2' above floor/6' above gradeTrue Interior privacy/trim/doors/main entrance 36True Backflow Preventors where requiredTrue Emergency egress below gradeTrue Intake OpeningsTrue Safety glazing: w/in 5' of tub/showerTrue Seals on Garage Doors, esp. WoodTrue Attic Access Insulation = Attic R- ValueTrue Gas Shut-off Exposed & Regulator (18) Above GradeTrue Platform at all exterior doorsTrue Smoke Detectors: Carbon MonoxideTrue Garage Floor PitchedTrue Inter ConnectedTrue Arc Fault Breaker Habitable SpacesTrue Energy Sticker on Elec. Panel:R-Val. & Heating SysTrue Furnace/Hot Water Heater operatingTrue Fresh Air IntakeTrue Basement stairs closed rise greater than 4 inchesTrue Outside every bedroom areaTrue Blower Door Test CertificationTrue Fin ElectEnergy Saving Light Bulbs 50 PercentTrue Gas Log In Sealed or Glass EnclosureFalseprovide fireplace final inspection OK to Issue C/OFalse Truss ID Signage Installed at Electrical MeterTrue Range Hood 400+ cfm-Fresh Air REQUIREDTrue 4 inch Building Number Address visible from roadTrue December 10, 2020Page 1 of 2 INSPECTION WORKSHEET (RESFINAL-002432-2020) Checklist ItemPassedComments HVAC Vent Terminal 10' from Lot Line & OpeningsTrue Attic Access GasketedTrue Jack posts in basement lagged at top and bottomTrue Guard at deck, porches 36" or moreTrue 6" clearance to sill plateTrue 20 Minute Fire Door/Self-Closing HardwareTrue Every level, Every bedroomTrue Furnace shut-off w/in 30 ft. or w/in line of siteTrue Chimney Height / B Vent / Direct Vent LocationTrue Relief Valve ,Heat Trap/Water Temp 110 deg or lessTrue 1/2" Gypsum or House Wall and GableTrue Basement Egress: 5s.f. window w/sill or Bilco doorTrue Bathroom / Kitchen WatertightTrue HRV or ERV Installed per Bedroom RequirementsTrue Duct work sealed properlyTrue Foundation insulation to floorTrue As Built Septic SystemTrue Outside Spigots have Air GapTrue OK to Issue Temporary C/OFalse All Hot Water Systems: 3/4" or larger piping R-3True Plumbing fixturesTrue Smoke Detectors 3' from Kitchens & Baths R314True Flex Gas Pipe BondingTrue Encl. Stairs Sheetrock Underside minimum ½ GypsumTrue Guards at stairs,decks,patios 30" + above gradeTrue Interior/Exterior Railings 34 to 38True Handrail 4 or more risersTrue Attic Access 22 x 30 minimumTrue General CommentsTrue Battery backup: _____True Roof Complete / Exterior Finish CompleteTrue Fresh air supply 3' from gradeTrue Guard at stairwell at 34" or moreTrue Handrail Termination at Newell Post or WallTrue December 10, 2020Page 2 of 2