Loading...
ResCheck REScheck Software Version 4.' Igli 6.3 Compliance Certificate EVECEllyE , Project New Model Home , ti.)) Energy Code: 2015 IECC 1 1111 OCT 3 1 Z018 Location: Glen Park, New York Construction Type: Single-family TOWN OF QUEENSBURY I Project Type: New Construction IG&CODES Conditioned Floor Area: 1,495 ft2 302.14-3-47 RC-0686-2018 Glazing Area 12% Gammon Construction LLC Climate Zone: 6 (7753 HDD) Permit Date: 9 Park View Ave Permit Number: SFD w/gas FP 1492 s.f., Gar. 498 s.f. Construction Site: Owner/Agent: Designer/Contras: Park View Drive Gammon Construction Ethan Peter Hall Queensbury, NY 12804 30 Clement Ave Rucinski Hall Architecture Saratoga Springs, NY 12866 134 Dix Ave Glens Falls, NY 12801 518-741-0268 ephall@nycap.rr.com Compliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 236 Your UA: 236 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Raised or Energy Truss 1,495 51.0 0.0 0.019 28 Wall 1: Wood Frame, 16"o.c. 298 21.0 0.0 0.057 15 Door 1: Solid 20 0.300 6 Door 2: Solid 18 0.300 5 Wall 2: Wood Frame, 16"o.c. 500 21.0 0.0 0.057 25 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 60 0.290 17 Wall 3: Wood Frame, 16"o.c. 298 21.0 0.0 0.057 14 Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 39 0.290 11 Door 3: Glass 18 0.340 6 Wall 4: Wood Frame, 16"o.c. 500 21.0 0.0 0.057 26 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 46 0.290 13 Basement Wall 1: Solid Concrete or Masonry 236 0.0 15.0 0.051 12 Wall height: 7.9' Depth below grade: 6.0' Insulation depth: 7.5' Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 1 of10 Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Basement Wall 2: Solid Concrete or Masonry 395 0.0 15.0 0.051 19 Wall height: 7.9' Depth below grade: 6.0' Insulation depth: 7.5' Window 4: Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Basement Wall 3: Solid Concrete or Masonry 236 0.0 15.0 0.051 12 Wall height: 7.9' Depth below grade: 6.0' Insulation depth: 7.5' Basement Wall 4: Solid Concrete or Masonry 395 0.0 15.0 0.051 20 Wall height: 7.9' Depth below grade: 6.0' Insulation depth: 7.5' Window 5:Vinyl/Fiberglass Frame:Double Pane with Low-E 8 0.290 2 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requirements ' d in th ES k Ins ection Checklist. Ethan Peter Hall-Architect • 50 Oar (e1gl Name-Title Signat Date r Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 2 of10 rREScheck Software Version 4.6.3 ‘ h Inspection Checklist Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section -- # Pre-Inspection/Plan Review Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 103.1, Construction drawings and EComplies Requirement will be met. 103.2 documentation demonstrate ElDoes Not [PR1]1 energy code compliance for the Location on plans/spec:A- V building envelope.Thermal ['Not Observable 1 envelope represented on ElNot Applicable construction documents. 103.1, Construction drawings and ['Complies Requirement will be met. 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for Location on plans/spec:A- [PR3]i lighting and mechanical systems. ❑Not Observable 1 t, Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Location on plans/spec:A- d, Manual J or other methods Btu/hr Btu/hr ❑Not Observable 1 approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 I Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 3 of10 Section # Foundation Inspection Plans Verified Field Verified p Value Value Complies? Comments/Assumptions & Req.ID 1 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [F04]1 insulation R-value.Where interior R- R- ❑Does Not table for values. insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies Requirement will be met. [F05]1 insulation installed per ❑Does Not manufacturer's instructions. Location on plans/spec:A- ['Not Observable 1 ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ElComplies See the Envelope Assemblies [F06]1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. DNot Observable ElNot Applicable 303.2.1 A protective covering is installed ❑Complies Exception: Requirement is [F011]2 to protect exposed exterior ❑Does Not not applicable. insulation and extends a ['Not Observable minimum of 6 in. below grade. ENot Applicable 403.9 Snow-and ice-melting system ❑Complies Exception: Requirement is [F012]z controls installed. ❑Does Not not applicable. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) , 3 [Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 4 of10 Section # Framing/Rough-In Inspection Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 402.1.1, Door U-factor. U U- DComplies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 DNot Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U DComplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, DNot Observable 402.5 DNot Applicable [FR2]1 303.1.3 U-factors of fenestration products DComplies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not v with the NFRC test procedure or Location on plans/spec:A- taken from the default table. Not Observable 1 ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier DComplies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not instructions. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 402.4.3 Fenestration that is not site built DComplies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not t, AAMA/WDMA/CSA 101/I.S.2/A440 ['Not Observable or has infiltration rates per NFRC 400 that do not exceed code DNot Applicable limits. 402.4.5 IC-rated recessed lighting fixtures DComplies Exception: Requirement is [FR16]2 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate <_2.0 cfm [Not Observable leakage at 75 Pa. DNot Applicable 403.2.1 Supply and return ducts in attics DComplies Exception: Ducts located [FR12]1 insulated >= R-8 where duct is ElDoes Not completely inside the >= 3 inches in diameter and >_ ❑Not Observable building envelope. R-6 where < 3 inches.Supply and return ducts in other portions of DNot Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies Requirement will be met. [FR15]3 ducts or plenums. ❑Does Not d Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 403.4 HVAC piping conveying fluids R- _ R- _ DComplies Exception: Requirement is [FR17]2 above 105°F or chilled fluids ❑Does Not not applicable. v, below 55°F are insulated to>_R- g, ['Not Observable DNot Applicable 403.4.1 Protection of insulation on HVAC DComplies Exception: Requirement is [FR24]1 piping. ❑Does Not not applicable. .s DNot Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- DComplies Requirement will be met. [FR18]2 ?_.R-3. ❑Does Not `' ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 403.6 Automatic or gravity dampers are DComplies Requirement will be met. [FR19]2 installed on all outdoor air DDoes Not intakes and exhausts. ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) [ 3 1 Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 5 of10 Section # Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 303.1 All installed insulation is labeled ❑Complies Requirement will be met. [IN13)2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least lh of the ❑ Wood 0 Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall [IN3]1 exterior,the exterior insulation ❑ Mass ❑ Mass ❑Not Observable ,, requirement applies(FR10). 0 Steel El Steel ENot Applicable 303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. DDoes Not ❑Not Observable Location on plans/spec:A- ❑Not Applicable 1 Additional Comments/Assumptions: I 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) i 3 Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 7 of10 Section # Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, 402.2.E ❑ Steel ❑ Steel [Not Observable [FI1]1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [FI2]1 Blown insulation marked every Location on plans/spec:A- 300 ft2. ❑Not Observable 1 ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. [F122]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that ❑Not Observable Location on plans/spec:A- extends over insulation. 1 ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [F13]1 insulation .R-value of the ❑Does Not adjacent assembly. ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 403.2.3 Duct tightness test result of< 4 cfm/100 cfm/100 EComplies Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ElDoes Not handlers are located within <=3 cfm/100 ft2 without air conditioned space. handler @ 25 Pa. For rough-in ❑Not Observable tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI27]1 determine air leakage with ft2 ft2 ❑Does Not handlers are located within either: Rough-in test:Total conditioned space. leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g.across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies Requirement will be met. [FI24]1 by manufacturer at<=2%of ❑Does Not design air flow. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies Requirement will be met. [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and ❑Not Observable Location on plans/spec:A- initially set by manufacturer to 1 code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies Exception: Requirement is [FI10]2 on heat pumps. ❑Does Not not applicable. ['Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies Exception: Requirement is [FI11]2 systems have automatic or ❑Does Not not applicable. accessible manual controls. ❑Not Observable ❑Not Applicable 1 ;High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 13 I Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 8 of10 Section • Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions & Req.ID Value Value 403.6.1 All mechanical ventilation system ❑Complies Requirement will be met. [F125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy Location on plans/spec:A- and air flow limits. ❑Not Observable 1 ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies Exception: Requirement is [FI26]2 through one-or two-pipe heating ❑Does Not not applicable. systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies Exception: Requirement is [FI2812 have a circulation pump.The ❑Does Not not applicable. system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [Fl29]2 comply with IEEE 515.1 or UL ❑Does Not not applicable. 515.Controls automatically ❑Not Observable adjust the energy input to the heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies Exception: Requirement is [FI30]2 have recirculation pumps that ❑Does Not not applicable. pump water from a heated water [Not Observable supply pipe back to the heated water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1044F. 403.5.4 Drain water heat recovery units EComplies Requirement will be met. [FI31]z tested in accordance with CSA ❑Does Not B55.1. Potable water-side ❑Not Observable Location on plans/spec:A- pressure loss of drain water heat 1 recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units< 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies Requirement will be met. j[FI6]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Location on plans/spec:A- iDoes not apply to low-voltage ['Not Observable 1 lighting. ❑Not Applicable '404.1.1 Fuel gas lighting systems have ElComplies Requirement will be met. [FI23]3 no continuous pilot light. Does Not [Not Observable Location on plans/spec:A- 1 ❑Not Applicable 11 High Impact(Tier 1) 2 1Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 9 of10 Section Plans Verified Field Verified # Final inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [FI7]2 ❑Does Not [Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies Requirement will be met. [F118]3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 1 2 1Medium Impact(Tier 2) 13 I Low Impact(Tier 3) Project Title: New Model Home Report date: 10/30/18 Data filename: Y:\Gammon\Park View\New Lot- March 2017\Park View 2018 - rev 1.rck Page 10 of10 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 0.00 Ceiling / Roof 51.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.30 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments