Loading...
Signed Inspection Report (Tue Feb 9, 2021 at 248 PM)INSPECTION WORKSHEET (BINS-008186-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0571-2020 Case Module:Permit Inspection Date:Tue Feb 9, 2021 Inspection Status:Partial Pass Inspector:O'Brien, John Inspection Type:Building Insulation Job Address:Parcel Number:728 QUAKER RD Queensbury, NY, 12804 303.15-1-10 Contact Type Company Name Name Granted Permission R & P Quaker II Realty, LLC Applicant Hilltop Construction Primary Owner R & P Quaker II Realty, LLC Engineer Daniel W. Ryan, PE Ryan, Daniel Contractor Hilltop Construction Checklist Item Status Building Inspector Notes Failed 2/3/21 Building Insulation - Roof Only! - Ceiling Partial Approval (R25 + R13 on south half of building). 2/4/21 Building Insulation Partial Approval - Ceiling Partial Approval (R25+R13 on east half of north side. Note: Inspecting balance between 1:00 - 2:00. 2/4/21 Building Insulation Partial Approval - Balance of ceiling insulation approved R25+R13 2/5/21 Building Insulation Partial Approval - End Walls at overhead doors R27 partial approval. Ok to install white vinyl vapor barrier. 2/9/21 Building Insulation Partial Approval - Gable End Wall Insulation Approved R27. Ok to install white vinyl vapor barrier. - vinyl vapor barrier installed on overhead door walls Feb 09, 2021 Page (1) INSPECTION WORKSHEET (BINS-008186-2021) Checklist Item Status Note: Correct R value is R27 not R25 as stated on previous inspection. Window Sealing Failed U Factors = .3 cfm for windows, .5 cfm for doors Failed Insulation Residential Check Commercial Check Passed 2/3/21 Building Insulation - Roof Only! - Ceiling Partial Approval (R25 + R13 on south half of building). 2/4/21 Building Insulation Partial Approval - Ceiling Partial Approval (R25+R13 on east half of north side. Note: Inspecting balance between 1:00 - 2:00. 2/4/21 Building Insulation Partial Approval - Balance of ceiling insulation approved R25+R13 2/5/21 Building Insulation Partial Approval - End Walls at overhead doors R27 partial approval. Ok to install white vinyl vapor barrier. 2/9/21 Building Insulation Partial Approval - Gable End Wall Insulation Approved R27. Ok to install white vinyl vapor barrier. - vinyl vapor barrier installed on overhead door walls Note: Correct R value is R27 not R25 as stated on previous inspection. Duct work sealed properly / No duct tape Failed Blower Door Test Failed Combustion Air Supply for Furnace Failed Feb 09, 2021 Page (2) INSPECTION WORKSHEET (BINS-008186-2021) Checklist Item Status Fresh air supply 3' from grade Failed Duct Insulation - if required in unheated spaces Failed Door / Window Sealed (No Insulation)Failed Air Seal Outside Penetrations Failed All Ductwork Sealed Return and Supply Failed All Return Air Hard Duct Work Failed Feb 09, 2021 Page (3) O'Brien, John