Loading...
as built ENVIRONMENTAL DESIGN PARTNERSHIP, LLP. 900 Route 146 Clifton Park,NY 12065 (P)518.371.7621 (F)518.371.9540 edpllp.com Shaping the physical environment December 20, 2019 Town of Queensbury Building&Codes 742 Bay Road Queensbury; NY 12804 Attn: Dave Hatin Re:.Cardinale Residence Wastewater—10 Crossover Lane Dear Dave: J In compliance with application approvals granted by the Town of Queensbury 1 offer the following regarding the referenced project. The design plans, prepared by this office and reviewed and approved by the Town as associated with the wastewater system application, are as follows: Replacement Wastewater System For The Cardinale Residence E C E a E 10 Crossover Lane V� • Sheet WW-1 Replacement Wastewater Plan :FE:B2:6 2021Sheet WW-2 Wastewater DetailsSheet WW-3 Wastewater Details and Notes TOOF QUEENSBURY Dated: December4, 2017 BUILDING&.CODES During the course of construction I was on the job site to observe key components of the system installation. With additional land available for an.absorption field,the Owner has converted existing holding tanks into a septic tank and pump tank system pumping'effluent to a new absorption field of Eljen GSF modules. This installation was completed as per the plan with the exception of the use of a demand dose control paneUfloat system instead of the time dose panel originally specified. This substitution is an equivalent system. The tanks (with risers and covers to grade)and the field are as per plan so no further as-built plan is provided. Based on my inspection of the system it is my opinion that the wastewater system is in compliance with the intent of the approved design plan and is ready for operation. Sincerely, Dennis MacElroy AS BUILT