Loading...
Signed Inspection Report (Thu Mar 4, 2021 at 348 PM)INSPECTION WORKSHEET (BINS-008704-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:AST-0593-2019 Case Module:Permit Inspection Date:Thu Mar 4, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Building Insulation Job Address:Parcel Number:133 Jenkinsville RD Queensbury, NY, 12804 279.-1-21 Contact Type Company Name Name Concrete Contractor A.J. Catalfamo Construction Co., Inc. Architect Rucinski-Hall Architecture Granted Permission TOWN OF QUEENSBURY REC DEPT Primary Owner TOWN OF QUEENSBURY REC DEPT Checklist Item Status Building Inspector Notes Passed 2/3/20 Insulation Not Approved Remaining Items: - Remove a sheet of fire retardant plywood from each wall to verify the insulation in wall has been installed correctly. - Provide documentation that states that R38 insulation has been installed in ceiling and R21 has been installed in the exterior walls as per the approved COMcheck Energy Code Compliance Report. - Provide documentation that the windows and insulated door have the correct U value as per the approved COMcheck Energy Code Compliance Report. 2/18/20 Insulation Partial Approval - Insulation documentation received from manufacturer. The installation verified and approved in accordance with the approved COMcheck. Remaining Items: - Provide documentation showing what the U value is for the windows and exterior doors. - Verify perimeter of windows and doors have been sealed with sprayfoam. - Schedule blower door test for addition. 3/4/21 Building Insulation Approved Mar 04, 2021 Page (1) INSPECTION WORKSHEET (BINS-008704-2021) Checklist Item Status - Received final approval letter from ClearVu Inspections stating the building addition is in compliance with the IECC code section C402.5 for air leakage in lieu of a blower door test. It complies with sections C402.5.1 thru C402.5.8. Insulation Residential Check Commercial Check Passed 2/3/20 Insulation Not Approved Remaining Items: - Remove a sheet of fire retardant plywood from each wall to verify the insulation in wall has been installed correctly. - Provide documentation that states that R38 insulation has been installed in ceiling and R21 has been installed in the exterior walls as per the approved COMcheck Energy Code Compliance Report. - Provide documentation that the windows and insulated door have the correct U value as per the approved COMcheck Energy Code Compliance Report. 2/18/20 Insulation Partial Approval - Insulation documentation received from manufacturer. The installation verified and approved in accordance with the approved COMcheck. Remaining Items: - Provide documentation showing what the U value is for the windows and exterior doors. - Verify perimeter of windows and doors have been sealed with sprayfoam. - Schedule blower door test for addition. 3/4/21 Building Insulation Approved - Received final approval letter from ClearVu Inspections stating the building addition is in compliance with the IECC code section C402.5 for air leakage in lieu of a blower door test. It complies with sections C402.5.1 thru C402.5.8. Mar 04, 2021 Page (2) O'Brien, John