Loading...
Engineering comments -RISTNhWT I RIST-FROST ASSOCIATES,P.C. i L_ CONSULTING ENGINEERS r i-s- ARCHITECTS ) U SURVEYORS �MAI q `,L,POST OFFICE BOX 838 FEB 1 �.J�� 21 BAY STREET February 14, 1991 GLENS FALLS RFA #89-5000.010 NY 12801 1 ANNING & ZONIIv FAX 618-793-4146 nEPARTMFN� 518•793-4141 Town of Queensbury Office Building Bay and Haviland Roads Queensbury, NY 12804 Attn: Mrs. Lee York, Sr. Planner Re: Raymond E. Erb, Site Plan 10-1991 Dear Mrs. York: We have reviewed the project and have the following engineering comments: 1 . Because the site is located in a critical environmental area, stormwater management was reviewed. The applicant has proposed to collect stormwater by rain gutters in order to discharge the runoff away from Glen Lake. Stormwater flow will be further concentrated by gutters, therefore the discharge should be into a drywell or stone trench to promote infiltration and to prevent a concentration of overland stormwater flow. 2. The proposed expansion does not involve the addition of a bedroom, therefore the existing sewage flow is not expected to increase and sewage disposal system modifications should not be necessary. 3. The Board should stipulate that erosion control measures shall be implemented in accordance with the New York State Guidelines for Urban Erosion and Sediment Control during site disturbance and until disturbed areas are stabilized. Very truly yours, RIST-FROST ASSOCIATES, P.C. fi M L Thomas . a mowich, P.E. Managing Project Engineer TMY/cmw cc: Planning Board Members GLENS FALLS,NY-LACONIA,NH