Loading...
Nemer Chrysler Jeep Dodge Ram concrete test report 14 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:5 INSPECTOR & TEST SET: DAVE CASAW #5 ATT'N: AMBIENT WEATHER: OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : 0 0 0 1 2 0 0 4905 / 843690 4911 / 843 0 0 0 11.50 / 11.50 3 11.50 / 23.00 4 0.00 0 0.00 0 2.12 / 2.31 0 ##1.56 / 2.40 0 0.00 0 0.00 0 2.42 / 3.00 # 2 3.17 / 3.32 ## 0.00 0 0.00 0.00 MAX: 1.50 )2 0.80 0 1 1.60 1 0 0.00 0 0.12 5.50 3 0.56 6.00 3 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 5.50 6.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )5.50 1 6.00 1 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 5.70 0 0.00 0 0.00 0379800 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 143.85 0 0.00 0 0.00 0 - 90 ) 81 0 80 0 0 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 204676 - 204681 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.204676 11/27/20 7 4010 X COARSE AGGREGATE #2: LBS.204677 11/27/20 7 3900 X COARSE AGGREGATE #3: LBS.204678 12/18/20 28 5270 0 FINE AGGREGATE: LBS.204679 12/18/20 28 5170 0 ADMIXTURE #1: OZS.204680 12/18/20 28 5400 0 ADMIXTURE #2: OZS.204681 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: FOOTING: SOUTH WALL AND WEST WALL, SOUTH HALF FOOTING: NORTH WALL AND WEST WALL, NORTH HALF PLACEMENT LOCATION OF LOAD # 0 0.00 45 C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 0.00 TEST AGE 4500 0 JOINTA-GALUSHA CONCRETE, INC. CONTRACTOR NOTIFIED: LOAD 2: OVERTIME ULTIMATE 11/23/20 0.00 0 0.0 0 0 0 0 64,900 0 0 0 0 0 0 8: 1: FILE 2: SUPPLIER 48,950 0 0 66,250 67,850 0 0 DISCREPANCIES & REMARKS: 0.0 4: 0.0 5: 6: 7: 0 0 DESIGN STRENGTH & FORMULA: 3: TIME CONC. BATCHED / ARRIVED: 50,400 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: LAB CYLINDER CONTROL NUMBERS: WATER: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): IF APPLICABLE: PROJECT: CONSTRUCTION TECHNOLOGY MR. CHARLES ALBRECHT R & P QUAKER II REALTY, LLC 728 QUAKER ROAD QUEENSBURY, NEW YORK 12804 NEMER CHRYSLER JEEP DODGE RAM: QUEENSBURY, NEW YORK Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 1 11/20/20 100.202 204676 50's: CLOUDY