Loading...
Staff Notes 3/16/2021 Town of Queensbury Planning Board Community Development Department Staff Notes March 16, 2021 Site Plan 13-2021 ROBERT MCCORMICK 18 Dark Bay Lane / WR – Waterfront Residential / Ward 1 SEQR Type II Material Review: application, site plans, architectural drawings, stormwater Parcel History:SP 59-88, SP 15-91, 2000-485 Res.Alt., AV 14-2021 __________________________________________________________________________________________ Requested Action Recommendation to the Zoning Board of Appeals for a 110 sq. ft. porch addition and a 116 sq. ft. porch addition to the main home. In addition a 500 sq. ft. carport addition to the existing 524 sq. ft. garage and construction of a 3,113 sq. ft. 8-car garage. Relief is sought for garage size, second garage and number of bays Resolutions 1. Recommendation Project Description Applicant proposes a 110 sq. ft. porch addition and a 116 sq. ft. porch addition to the main home. The main home is 3,287 sq. ft. with 535 sq. ft. deck-porch area. Existing floor area is 4,446 sq. ft. with new floor area 8,285 sq. ft. The project includes a 500 sq. ft. carport addition to the existing 524 sq. ft. garage and construction of a 3,113 sq. ft. 8-car garage. Site work includes a new well. Pursuant to Chapter 179-3-040, 179-6-065, 179- 5-020 & 179-13-010 of the Zoning Ordinance, new floor area in a CEA, expansion of a non-conforming structure and project work within 50 ft. of 15% slopes shall be subject to Planning Board review and approval. Variance: Relief is sought for garage size, second garage and number of bays. Planning Board shall provide a recommendation to the Zoning Board of Appeals. Staff Comments  Location-The project is located at 18 Dark Bay Lane on a 4.69 ac parcel.  Arrangement- The site has 2 story residence, and a detached garage. The parcel is located on Lake George and there is an existing dock. The site is mostly wooded  Site Design- The site changes including clearing the area for the new garage and well area. The existing septic field will remain.  Building – The project includes two porch additions to the existing home. The porch additions are on the south side of 110 sq ft and the west side 116 sq ft. The carport of 500 sq ft is to be added to the existing 524 sq ft. The car port is to be constructed to match the existing garage with a height of 13 ft 8 inches. The proposed garage is to be 3,113 sq ft and to be 16 ft in height. The garage is to have 8 bays for vehicle storage – antique vehicles, boats, classic cars  Site conditions-A majority of the site is wooded.  Grading and drainage plan, Sediment and erosion control-  Landscape plan-The plans indicate three black spruce and two white pines to be planted near the new garage. There are no additional shoreline plantings all to remain undisturbed.Below are the guidelines from the shoreline buffer code section Shoreline Buffer - Section 179-8-040 o -Minimum width 35 ft (Lake George) -For every 700 sqft of shoreline buffer area –one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 – 24 in native shrubs; 14 herbaceous plants Project site -220 ft of shoreline per survey -Shoreline buffer 220 ft X 35 ft width is 7,700 sq ft -Shoreline buffer area -7,700 /700 = 11 round up to 11 –elevenlarge trees at 3 inch diameter -Ground cover -3,600/350 = 22 round up to 22 (X7) =154 native shrubs and 22 (X14) herbaceous plants=308 Shoreline Cutting restrictions- Section 179-6-050 o Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ­ ft whichever is less 220 ft Shoreline X 30%= 66 feet of the shoreline buffer cut to allow a view, access and to reduce ­ runoff (such as angled across the lot). Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable ­ within the 30%/75 ft cut area.   Utility details-The plans show an existing leach field to remain on the site. There is an existing forced main from the main house to the leach field. The new garage is to have a bathroom where the sewer line will be connected to the force main to the leach field.  Elevations-The plans show the elevations of the two porch additions to the existing home, the carport and the proposed garage. - 2 -   Floor plans- There are floor plans for the proposed garage area,  Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, , q. soil logs, r. construction/demolition disposal.  The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provided information on these items -j. stormwater, k. topography, l. landscaping p floor plans s. snow removal  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance The applicant proposes a second garage that is to be 1,300 sq ft and is to have 8 bays. The relief requested for a second garage, size of the garage where 1,100 sq ft maximum size allowed for lots less than 5 ac, and 8 bays where the maximum allowed is 3 bays. Summary The Planning Board is to provide a recommendation to the ZBA in regards to the relief requested number of garages, size of garage, and number of bays for the garage. st Meeting History: 1 Meeting - 3 -