Signed Inspection Report (Fri Mar 26, 2021 at 1056 AM)INSPECTION WORKSHEET (BINS-009164-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0571-2020 Case Module:Permit
Inspection Date:Fri Mar 26, 2021 Inspection Status:Passed
Inspector:O'Brien, John Inspection Type:Building Insulation
Job Address:Parcel Number:728 QUAKER RD
Queensbury, NY, 12804
303.15-1-10
Contact Type Company Name Name
Applicant Hilltop Construction
Contractor Hilltop Construction
Engineer Daniel W. Ryan, PE Ryan, Daniel
Primary Owner R & P Quaker II Realty, LLC
Granted Permission R & P Quaker II Realty, LLC
Checklist Item Status
Mar 26, 2021 Page (1)
INSPECTION WORKSHEET (BINS-009164-2021)
Checklist Item Status
Building Inspector Notes Passed
2/3/21 Building Insulation - Roof Only!
- Ceiling Partial Approval (R25 + R13 on south half of building).
2/4/21 Building Insulation Partial Approval
- Ceiling Partial Approval (R25+R13 on east half of north side.
Note: Inspecting balance between 1:00 - 2:00.
2/4/21 Building Insulation Partial Approval
- Balance of ceiling insulation approved R25+R13
2/5/21 Building Insulation Partial Approval
- End Walls at overhead doors R27 partial approval. Ok to install white vinyl vapor barrier.
2/9/21 Building Insulation Partial Approval
- Gable End Wall Insulation Approved R27. Ok to install white vinyl vapor barrier.
- vinyl vapor barrier installed on overhead door walls
Note: Correct R value is R27 not R25 as stated on previous inspection.
2/17/21 Building Insulation Partial Approval
- Above pre-existing gable end wall R27 approved
3/2/21 Building Insulation Partial Approva
- Air sealing not approved around side wall vents. I will recheck same time tomorrow.
3/3/21 Building Insulation Partial Approval
- Air Sealing Partial Approval for exhaust system.
Remaining Item:
- Spray foam applied at gap between wall sleeve and Durovent B-vent pipe at each Modine heater. 1" clearance
to combustibles required and foam must be removed around perimeter of B-vent and sleeve gap at each location.
3/26/21 Building Insulation Approved
-Received exemption letter from Thermal Associates regarding being unable to isolate the addition from the
pre-existing repair bays.
Mar 26, 2021 Page (2)
INSPECTION WORKSHEET (BINS-009164-2021)
Checklist Item Status
Insulation Residential Check Commercial Check Passed
2/3/21 Building Insulation - Roof Only!
- Ceiling Partial Approval (R25 + R13 on south half of building).
2/4/21 Building Insulation Partial Approval
- Ceiling Partial Approval (R25+R13 on east half of north side.
Note: Inspecting balance between 1:00 - 2:00.
2/4/21 Building Insulation Partial Approval
- Balance of ceiling insulation approved R25+R13
2/5/21 Building Insulation Partial Approval
- End Walls at overhead doors R27 partial approval. Ok to install white vinyl vapor barrier.
2/9/21 Building Insulation Partial Approval
- Gable End Wall Insulation Approved R27. Ok to install white vinyl vapor barrier.
- vinyl vapor barrier installed on overhead door walls
Note: Correct R value is R27 not R25 as stated on previous inspection.
2/17/21 Building Insulation Partial Approval
- Above pre-existing gable end wall R27 approved
3/26/21 Building Insulation Approved
-Received exemption letter from Thermal Associates regarding being unable to isolate the addition from the
pre-existing repair bays.
Blower Door Test Passed
3/26/21 Building Insulation Approved
-Received exemption letter from Thermal Associates regarding being unable to isolate the addition from the
pre-existing repair bays.
Air Seal Outside Penetrations Passed
3/2/21 Building Insulation Partial Approval
- Air sealing not approved around side wall vents. I will recheck same time tomorrow.
3/3/21 Building Insulation Partial Approval
- Air Sealing Partial Approval for exhaust system.
Remaining Item:
- Spray foam applied at gap between wall sleeve and Durovent B-vent pipe at each Modine heater. 1" clearance
to combustibles required and foam must be removed around perimeter of B-vent and sleeve gap at each location.
Mar 26, 2021 Page (3)
O'Brien, John