2000-026 TOWN OF QUEENSBURY %my742 Bay Road, Queensbury, NY 12804-5902 (518) 761-8201 Community Development- Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: 2000026 Date Issued: Wednesday, September 13, 2000 This is to certify that work requested to be done as shown by Permit Number 2000026 has been completed. RESIDENTIAL ALTERATION DUE TO FIRE DAMAGE Tax Map Number: 523400-016-000-0001-024-001-0000 Location: 15 HOLIDAY POINT Rd Owner: STEVEN & CATHERINE SCHONWETTER By Order of Town Board TOWN OF QUEENSBURY Director of Building&.Code Enforcement BUILDING PERMIT Town of Queensbury, 742 Bay Road, Queensbury,NY 12804 County of Warren (518)761-8256 VALUE $ 250000 Building Permit No. Z000026 TAX MAP NO. 16 . -1-24 . 1 Permission is hereby granted to SCHONWETTFR , STFVEN & Owner of property located at 15 HOT,TnAY POINT RD. in the Town of Queensbury,to construct or place a at the above location in accordance to application toge er wit p o pans oggetagedFaRFE DAMA approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Owner's Address: CATHERINE 10 LINCOLN MALL NISKAYUNA, NY 12309 Contractor or Builder's Name: HOWLAND, DEAN JR Contractor or Builder's Address: 28 HUNTER LANE QUEENSBURY, NY 12804 Electrical Inspection Agency: ATLANTIC INLAND RD#2 BOX 60 GREENWICH, NY 12834 Type of Construction: RESIDENTIAL ALTERATIONS • Plans and Specifications: 2000 SQ FT RESIDENTIAL ALTERATION DUE TO FIRE DAMAGE AS PER APPLICATION Proposed Use: RESIDENTIAL ALTERATION DUE TO FIRE DAMAGE $ 80 PERMIT FEE PAID—THIS PERMIT EXPIRES Fehru ay,y 3 2002 (If a longer period is required,an application for an extension must be made to the Code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Queensbury this 3 Day of February 2000 SIGNED BY \.1 '`-. ��_for the Town of Queensbury • Code Enforcement Officer . Application for SEPTIC DISPOSAL- PERMIT Town of Queensbury Permit No. Dept. of Community Development Building &Codes Office 742 Bay Road Fee Paid $ Queensbury, NY 12804 Location of property for installation: / 4 pi Property Owner's Name: s> v - Property Owner's Mailing Address: /4/Zi& sr. 6G,014 w /Zo/ Installer's Name: dfrJ/i„0l�61,J,va oc�tQJ :0,c. Phone # 793— �1�7 . Number of bedrooms (if residential): ' 3 Total daily flow: h/5U (residential - compute @ 150 gal./bdrm.) Topography: X. flat, rolling, steep slope % of slope Soil Nature: sand, loam, clay, other /depth: Ground water: at what depth? 6— feet / Bedrock or Impervious Material: at what depth? _ feet Percolation test: not required, required [rate min. per inch] Domestic water supply: municipal, well, other If domestic water supply is a WELL, water supply from any septic absorption is feet. PROPOSED SYSTEM Septic tank: /gallon (minimum size: 1,000 gal.) 106)s /6 /22,W 5 /off Tile field: each trench feet / Total system length: feet 6w5714x� Seepage pit(s): number of / size each: ft. by ft. Size of stone to be used: # / depth or thickness feet HOLDING TANK SYSTEM: (if required) Number of tanks: Size of each: - gallons CAlarm system and associated electrical work to be inspected by a certified agency. For your protection, please note that pursuant to Section 136-29 of the Code of the Town of Queensbury, any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations with respect to this application and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinan Signature of responsible person: � /i'//girl/ .211. Date: / 7/ ui�T iin R! .e ait Application. Town of Queensbury - Dept. of Conununity Development, 742 Bay Road, Queensbury, NY 12804 [761-8256] BUILDING & . CODE ENFORCEMENT :NOTICE_ • Requirements prior to issuance r A permit must be obtained before ' of this permit: PERMIT FILE NOLT X DO'Pi• beginning construction. No inspections O� ZoningBoard Action PERMIT FEE PAID$ b will be made until applicant has received ❑ i a VALID BUILDING PERMIT. All Area /Use RECREATION FEE PAID$ ! applicants` spaces on this application MUST be completed and•the signature ❑ Planning Board Action • REVIEWED BY: / of the applicant must appear on the SPR / Subdivision /Other Bu's ing Inspector J application form. x,ar, Recreation Fee Payment / Applicant: C eaos L77 ' -1:v�• Owner: .��Ramt.-6 M, Selox &d , �6� d { _. Address: e 7Ue��us u >kJ Address: 'St1 L�eK ST. (�'`ioJ115 /t> /Zd '] Phone # ( ) 793 Phone # Property Location: /4tt)Lidt Pi. ie -ottakt e '&J. Tax Map Number• /4 / ' l . Subdivision Name: --- Section 1)1ock lnt NATURE OF PROPOSED WORK: ESTIMATED MARKET VALUE OF THE New Building: CONSTRUCTION: $ Z51:2,63,06 ' residence / commercial Addition to Building: residence / commercial OCCUPANCY INFORMATION: A1te`rati a Building: Primary Building - - 9j - residence / commercial Single Family D;we{llinrl1°�- /-r Residence / Commercial Two Family Dwelling � _�' no change to exterior size Family Dwel Office jimg2 $ Zoo® Other Work (describe below) Mercantile fi `,'"` ;.- _.- ._- Manufacturing P sl,' O her GROSS AREA OF PROPOSED STRUCTURE: �((�-j Ne_ r'lf _rilA WI,_ '1st Floor /330 sq. ft.0)47 If ADDITION, what will use 2nd .Floor of new addition be? : �70" sq. ft. Other Floors sq. ft.. - (not unfinished cellar or basement) ACCESSORY BUILDINGS: - Detached Garage 1, 2 car TOTAL FLOOR AREA: 20 SQ. FT. Attached Garage 1, 2 car Private Storage Building SIZE OF NEW STRUCTURE: Commercial Storage Building / / Other 700 FEET X 3- FEET Foundation Type: 81,00c. Will any second-hand or ungraded ' Number of Stories : • 2. lumber be used? If so, for what? (habitable space only) Height (grade to • e) : 2 -1 feet TYPE OF- HEATING SYSTEM: Number of fireplac d/or woodstove (circle all which plies) . to be installed: Electric / Oil / Gas / Wood Forced Hot Air / aseboard Wood ,,— responble or supervision of work as regards to building codes is : Q;n,'` a1Z,,,J Je,_ Name Addresss Phone Builder: /a� r,/Lr c oa f G Z8 l oo n- '743-e,fo7 Plumber: q..9e,466a Mason: Electrician: DECLARATION: Please sign below after you have carefully read the statement. r —w " TOWN OF QUEENSBURY 742 Bay Rd., Queensbury, NY 12804 APPLICATION FOR SOLID FUEL BURNING APPLIANCES AND CHIMNEYS Date 1 'I' ;10, 0694Z, Permit Noe( 0404(462 APPLICATION IS HEREBY MADE to the Building Dept. for the issuance of a Building and Use Permit pursuant to the New York State Fire Prevention and Building Code. The applicant or owner agrees to comply with all applicable laws, ordinances, regulations, and all conditions that are part of these requirements and also will allow all inspectors to enter premises to perform required inspections. Please fill out additional form if more than one appliance and/or chimney. -- Applicant `7r, 3�a ';; A;r; ,, , o .1`Y: , APPLIANCE (check appropriate boxes) ' / 0 STOVE: ❑Wood o Coal ❑ Pellet 'Gas Address w� �r����� : �i� �:�c , 0 FIREPLACE INSERT ,4 r',; , .? ,p =' /0'1 Zip / ''° �)-..',4 0 FIREPLACE, FACTORY-BUILT: ❑ Wood ❑ Gas Phone " = -- , 96') 0 FIREPLACE, MASONRY: f�, ❑ Wood ❑ Gas Owner _-; p:, or4I.1 IA,c ;._ - J1=}A.at. c fi . 0 FURNACE: ❑ Wood ❑ Gas ❑ Oil Address IN /1-4,7- 1ST. ",;:>, f f ;/t) ;;O .X<7 IF NON-MASONRY APPLIANCE: Manufacturer: Zip Model: Phone , ' -- ';1 / . . . .. _.. CHIMNEY (check appropriate boxes) *EXACT ADDRESS of proposed construction �``� 0 MASONRY: ❑ Block 0 Frick 0 Stone rtr, t }t -.. ii" l n � ' FLUE: 0 Tile No Steel Size: ,,. inches CONSTRUCTION/INSTALLATION MUST ❑ FACTORY-BUILT: ' CONFORM TO NYS FIRE PREVENTION & Manufacturer: Model: BUILDING CODE. CONSULT AVAILABLE Listed By: Number: TOWN OF QUEENSBURY HANDOUTS ❑ Double Wall ❑Triple Wall REGARDING REQUIRED INSPECTIONS. 0 Insulated 0 Direct Venting 0 Chimney Liner 'B-114'di "t'" Cashier's Department Town of Queensbury, New York Dept: Fire Marshal Amount Collected Amount Refunded Code Number Title )(7) A 173 3389 (190) Public Safety A 233 2655 k.:..„..(230) Minor Sales CFee.-Colleeted From or�Refunded to: `� A )\ r A-c A` �` .>t".#`4, r'1 . " Addss -.,,� re :- — ,.�— / TM `_-\A(/ -t 1\ Dated: I ? n"t -:,'"- Town Clerk or Deputy/_ 'fiz-o.,, White: Applicant Green: Fire Marshal Yellow: Bldg. Dept. Pink & Goldenrod: Cashier's Dept. Ilik --:- --bVF,Li \---\'" ' 66 9L-e'er'13.... .C.:3-10:Flakh"E.:,-------TiiHEei._. RESIDENTIAL FINAL INSPECTION REPORT Office No.(518)761-8256 Date inspection request received: Building&Code Enforcement . AOF Dept.of Community Development Arrive Vo0anziriltepTrq,.1 a•i Town of Queensbury Inspector's Initia . jJ 742 Bay Road Queensbury,New York 12804 . NAME ,4 ND Cu)F TE PE'' t i 2oCO—OZ• LOCATION V - l-®ui DR ti)L` RQfl0 DATE a1 7-1T —bc TYPE OF STRUCTURE PI[l�1F 1 1Dn,1 N/A YES NO COMMENTS Chimney Heightl"B"Vent/Direct Vent Location ______r____ Fresh Air Intake Plumb Vent through roof Roof Complete Exterior Finish Complete Interior/Exterior Railings 30"to 36" Exterior Handrails,balconies,landing 8 .or more Interior Handrails stairs both sides 3 r mo e risers Grade 2%away from foundation 8"clearance to sill plate Gas Valve shut-off exposed/regula r 18" bove grade Gas Furnace shut-off within 30 fee or wi 'n line of site Oil Furnace shut-off at entrance to a area Furnace/Hot Water Heater operat' g Relief Valve(s)installed / Headroom,6 ft.6 in.on stairs Basement stair 6 ft.4 in. Handrail exterio tams both sid more than 3 risers Interior privacy/tri d o /main -ntrance 36" Floor Finish Bathroom/Kitchen watertight Interior Handrails Balconies . ding 18 in.or more Railing across window in s •' ells _ Smoke Detectors: every level every bedroom outside every bedroom inter connected Bathroom fans flumbing fixtures oundation insulation 3/4 hour fire door/door closer Garage fireproofing Garage penetrations sealed Furnace in separate room protected(in garage) Light ventilation per room Safety glazing 18"or less from floor Final Electrical Site Plan/Variance required Final Survey Plot Plan As Built Septic System layout required Okay to issue C/C(Certif.of Compliance) Okay to issue temp.C/O(Certif.of Occupancy) Okay to issue permanent C/O(Certif.of Occupancy) TOWN OF QUEENSBURY BUILDING &_CODE ENFORCEMENT 742 Bay Road �` ueen ury NY 12804 (518)�761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION if Name '1-�OiJ�1::�3E TER Loction l�ot��{P �A� Vot cS1 •�'D Datd', (A —l3--mPerr,ini t # p--u D SOIL`,TYPE: Sand-Loam ICl ay- : Results of Percolation Test- (if applicable) Rate ,Minute/Inch TYPE OR SYSTEM: ABSORPTION FIELD: Total Length Length of each trench Depth of\trenches Size of shone SEEPAGE PITS: Number- Size - \, ft. x ft. Stone size \, PIPING: Size Type Bldg, to Tank\ Tank to Dist. 'Box Dist. Box to Fi''e1d/Pit Openings Sealed?• Yes No Partial LOCATION/SEPARATIANS: Foundation to Tanks, feet Foundation to Absorption feet Separation of Pits \., _ feet Conforms as per: Pl of Pl an (( Yes No LOCATION OF SYSTEM ON',PROPERI' (circle one) Front - Rear 7' Left Side., - Right Side Middle Front ' Middle Reta,r il COMMENTS: k 4 e'E_G tvEV M 3t310-' Al--kC SYSTEM USE APPROVED: ES NO \\ Arrived: Depart A, .. Air i/' :u' ding In .. "or TOWN OF QUEENSBURY BUILDING & CODE ENFORCEMENT 742 Bay Road Queensbury. MY 12804 (518) 761-8256 SEPTIC DISPOSAL SYSTEM ii IANSPECTION Cry Name . G{ ,o,JG�C��6 ,`; y Location 62i91:D4-`t PT-. ':'•I • Date 7 14 4)1, P e it #1,.'') —0'2-4 SOIL TYPE: Sa,n' -Loa -Cl ay' Results of Percplation Test- (if applicable) ,Rate-Min1(a /Inch TYPE OF SYSTEM:';` ' i ABSORPTION FIELD.: Total/-'Lengthy [Z3 Length of each 't_rench , �e_5 -• Depth of trenches';�,��1, r,= Size of stone ' i7 bi: 1cTte4r(J 5 SEEPAGE PITS: Number_f Size - f t --x,';'. f t. Stone size is::f: PIPING: F , Size Type Bldg. to Tank ,<,, , Tank to Dist. Bo?c ,_';'G's, ''DY- Q iU;�lu--1, Dist. Box to Field/P •'. 5 �io/2-35— Openings Sealed?=';`' Yeis No Partial LOCATION/SEPARATION Foundation to Tank `,,, feet Foundation to: Absorption, / feet Separation o=`-Pi is ``_ feet Conforms as.per Plot P1a1,, Yes 15 LOCATION OF;;SYSTEM ON PROPERTY: (circle • ,: , Front - Re , - Left Side \ ight Side Middle F h• t - Middle Rear s ,. COMMENTS, - " CJ�,, 'tv,l T ✓ 5\ O()1 a- , AY) 6 yCS,i j < a ...s ,,,._\ co06 C ouic Al- t‹ % SYSTEM USE APPROVED: YES 'N ''s, Arrived: Departed: 0 - eL Building-Inspector RESIDENTIAL FINAL INSPECTION REPORT \--e:)- - Office No.(518)761-8256 Date inspection request received: Building&Code Enforcement Dept.of Community Development Arrive epart ' n m . Town of Queensbury Inspector's Ini' 742 Bay Road Queensbury,New York 12804 NAME C,`(\ PA PERMIT# 60"C TYPE ce, I TRU\AzE\�0\\c� 4._, b� �- DATE —d g)O O N/A YES NO N. COMMENTS Chimney HeightP'B"Vent/Direct Vent Location /J. .. Fresh Air Intake J,r Plumb Vent through roof V • Roof Complete • \ . . Exterior Finish Complete Interior/Exterior Railings 30"to 36" / C-' t-k'S ,V-2i V‘Rt1 \L j UN Exterior Handrails,balconies,landing 18 in.or mo e ,/- /�(AV 7�j Interior Handrails stairs both sides 3 or more ri ers ✓ Grade 2%away from foundation l 8"clearance to sill plate G t \ el (J .� 4. - Gas Valve shut-off exposed/regulator 18"above grad ✓/ c Gas Furnace shut-off within 30 feet or within line of si\ ✓ Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating ‘ ✓, Relief Valve(s)installed \\ ✓ Headroom,6 ft.6 in.on stairs Basement stairs,6 ft.4 in. Handrail exterior stairs both sides more than 3 risers I V/ t � ' �Q �o` <As "'` ; Interior privacy/trim/doors/main entrance 36" \ Floor Finish Bathroom/Kitchen watertight Interior Handrails Balconies/Landing 18 in.or more \, Railing across window in stairwells Smoke Detectors: . every level every bedroom / outside every bedroom '/„ inter connected 1` Bathroom fans Plumbing fixtures �`' Foundation insulation \. /. i 3/4 hour fire door/door closer .,� Garage fireproofmg ✓� Garage penetrations sealed ,/ Furnace in separate room protected(in garage) Light ventilation per room Safety glazing 18"or less from floorV / Final Electrical - Site Plan/Variance required 1 G � �7'i, Final Survey Plot Plan ✓ j As Built Septic System layout required V Okay to issue C/C(Certif.of Compliance) Okay to issue temp.C/O(Certif.of Occupancy)_ V Okay to issue permanent C/O(Certif.of Occupancy) TOWN OF QUEENSBURY BUILDING& CODE ENFORCEMENT 742 Bay Road Queensbury NY 12804 (518) 761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION Name c.A. r Location /5 G yo 01/- Date 7 1 < Rerrmit # (R) - 624 SOIL TYPE: San-Loam-Lay- d Results of Percolation %est- (i f applicable;) Rate-Mi kite/Inch TYPE OF SYSTEM: ABSORPTION FIELD: Total 'Leng h Length of each trench2R'_9' -it)- 04,44 5 Depth of trenches ;7 Size of stone /viiiLT/1,-7`diQ5 SEEPAGE PITS: Number- ( Size - i t. x 1 ft. Stone size _ r, PIPING: ti ft Size Type Bldg. to Tank Tank to Dist. Boxy f/ Dist. Box to Field/Peitt Openings Sealed? '.'T 1Yes No . Partial LOCATION/SEPARATIONS: Foundation to Tank feet Foundation to Abso.rpkti on feet Separation of Pits' fe- Conforms as per Pilot Van Yes e LOCATION OF SYSTI ON PROPERTY: (circle one) f. Front - Rear - heft Side, - Right Side Middle Front - 1i ddl e Rehr ��? COMMENTS. 0 /*JJ �4�,,��q,t i . :4 Vi -�U([;i PRoo CV ,' AtePRd t)A'L ��O,; 4r ;IN L ; --0 u i —66x. L °frc:C� S L k144- c:- ( ffc-tc l :o K SYSTEM USE APPROVED: YES NO Arrived: Departed: V44216 -- Building Inspector GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive feoim Depart ' Inspector's Initi NAME: g't-e A/'PERMIT# — :)-(p LOCATION: )Cj DATE : L./ —/9J'pcof . TYPE OF STRUCTURE: \A RECHECK N/A YES NO COMMENTS Footings/Piers F I Monolithic Pour Form Reinforcement in Place The contractor is responsi le for providing protection from freezi' g for 48 hours following th placement of the concrete. • Materials for this purpose o t site Foundation/7allpour Reinforcement\in Place Foundation/Dam'pproof in J Backlit! Approval Plumbing Under Slab Plumbing Vent/Vents in P ace Rough Plumbing Heating Rough-In Ins on Foundation Wa Is 'Me for R- Foundation Walls Ext-rior R- Floors R- Walls R- Ceiling R- Duct work or piping n unheated spaces R- - Proper Vent, Attic Vent Framing _— Jack Studs/Headers Bracing/Bridging__-_ Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2, 3, hour Penetration Sealed Fire Wall 2, 3, 4 hour Firestopping Vrf GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Qucensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury, IVY 12804 Arrive `" Depart • at nspector's Initials NAME:Sc O���� ,Y ERMIT# LOCATION: LS l+l c '�J(+- DATE : '?,f� ' )0 6 TYPE OF STRUC URE: RECHECK N/A YES NO COMMENTS Footings/Piers 1 I Monolithic Pour Form Reinforcement in Place The contractor is respon '.lc for providing protection f•sm freezing for 48 hours followi g the placem.�t of the concrete. Mate&-ials for this p ..se on si • Foundation/Wallpo it Reinforce e_ in "I • Foundation/Dam proofing Backfill ll Approv r l Plumbing Undo Slab Plumbing Ve Vents in Place Rough Plumb ng Heating Rou;;h-In Insulation Foundat'.n Walls Interior R- Founda,on Walls Exterior R- Floors R- Walls � Ceiling `� R- Duct work or piping in unheated spaces R- _ Proper Vent, Attic Vent_____ Framing — --— — — --- Jack Studs/Headers Bracing/Bridging _ Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation I, 2, 3, hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping GENERAL INSPECTION REPORT Town of Queensbury 36 p De t. of Community Development Date inspection request received: ;--2)) 3).46-66 Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive //i r am/pm Depart am/pm Inspector's Initials ) NAME: �G` n PERMIT# _\\ LOCATION: 6 I' ��, . I/DATE : C `U TYPE OF STRUCTURE: RECHECK -710 1> N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place \ The contractor is responsible for providing protection from ing for 48 hours following the pla men of the concrete. Materials for this purpose on site Foundation!Wallpour Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R�- Foundation Walls Exterior gg(( Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R-'- Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2, 3, hour Penetration Sealed Fire Wall 2, 3, 4 hour / � ` ., stopping ✓ ,?df ecivi l�� G GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: )07,,di, Building& Code Enforcement 742 Bay Road ,� Queensbury, NY 12804 / Arrive a: ' Depart : Inspector's Initia i NAME: S\Q-f\I-Q/Ir•ERMIT# O L-O a`LP LOCATION: S ; �, a DATE : TYPE OF STRUCTURE: ''l AN- RECHECK , N/A YES NO COMMENTS Footings/Piers I ii Monolithic Pour Form ', / Reinforcement in Place \ / The contractor is responsible for r providing protection from freezing r".a_ for 48 hours following the placement 'ti of the concrete. Materials for this purpose on site \,. Foundation/Wallpour / Reinforcement in Place / Foundation/Dampproofing / ,„ Backfill Approval 0 Plumbing Under Slab / Plumbing Vent/Vents in Place \.,,,, Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- \ Foundation Walls Exterior R- / Floors R- / Walls R- / Ceiling R- / .N. Duct work or piping in unheated spaces R- // r,: Proper Vent, Attic Vent_ ',\ Framing_ ---_ / �t" Jack Studs/Headers i` ' Bracing/Bridging • ;;4•. Joist Hangers `'", • Jack Posts/Main Beam _ Air Infiltration Barrier Fire Separation 1, 2, 3, hour Penetration Scaled Fire all 2. 3,4 hour / ��/� Fi estopping k.- V t -_) oil) ,, _"`' _-ter -> \; -e3:4-- . GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Qucensbury, NY 12804 Arrive ',V2t, itclin. Depart Inspector's Initi 4 NAME. N V PM PERMIT — 0a� LOCATION: i�j ru..�� 01 y�� DATE : _2, /.5 C 2) TYPE OF STRUCTURE: PA-\-. Q_ `,47:3c\ 2— ee� RECHECK N/A YES NO COMMENTS Footings/Piers 1 Monolithic Pour Form Reinforcement in Place The contractor is respo isiblc'fpr providing protection f�om freezing for 48 hours following\the placement of the concrete. I Materials for this purposc''on sit Foundation/Wallpour ` Reinforcement in Place Foundation/Dampproofi ng/.f Backfill Approval' __ -- Plumbing Under Slab Plumbing VenUVents in Place Rough Plumbing Heating Rough-In Insulation `i Foundation Walls Interior R- Foundation Walls Exterior R- Floors ,' R- Walls / R- Ceiling / R- _ Duct work or piping in unheated spaces/ R- Proper Vent, Attic V'nt D 1R,�C Framing_ / _ Jack Studs/Headers Bracing/Bridgiing _ Joist Hangers I . Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2, 3, hour Penetration Sealed Fire Il 2, 3,4 hour F. _ stopping -2_,N Sri.1. --p /2/i . -2-- \1p,,,.. --t__.__C__T\t-.Z . GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: S -3 00O Building& Code Enforcement 742 Bay Road Queensbury,NY 128, rive e ijii0m Depart/O6,' D-1^ nspector's Initials NAME: G / PERMIT# +c-7 LOCATION: / ' e , DATE : * �' 2 TYPE OF STRUCTURE: p 4q,,a,, RECHECK ckte_ Gd / N/A YES NO COMMENTS Footings/Piers I I Monolithic Pour Form Reinforcement in Place The contractor is responsible fo providing protection from freezing for 48 hours following the p cement of the concrete. Materials for this purpose of.site Foundation/Wallpour Reinforcement in Place - Foundation/Dampproolin , _ Backfill Approvliil, Plumbing Under Slab Plumbing Vent/Vents i Place Rough Plumbing Heating Rough-In Insulation Foundation Wall• Interior R- Foundation Wal . Exterior R- Floors R- Walls R- Cei l ing R- Duct work or piping in unheated .paces R- P oper Vent, ttic Vent_ /43raming_��I yi 1A--- Jack Studs/Headers /" Bra grog _ �� .� dn Joist Hangers t/ t/ tJ «� t-t%;5,5S z6 t cJ 1, a. GoP�ti=Q (A - -' Jack Posts/Main Beam ck-t5-{ Air Infiltration Barrier -ALL�`��� QP1D6lIG 7 LI Fire Separation 1, 2, 3, hour �+ 2-iTt �- �' � Penetration Sealed _} Fire Wall 2, 3,4 hour Firestopping / And V-712E t3l-.GK. 1 tk: it-eo ---- mias sa;.s sm u: s :. a: n r wn s� reamartraas*a 3fr °C)-Cs) —C)-;j1C7'. . B9 • ( Encroa chm eN 1/� '.j. 8 2000 over Deed Line, i. 1 0 d.s=4 ';.}'� Z+9N1! N. 28° U7' W. i' 30„ W 69.:4 I cr K 1. Lazar �—-- 8.73' 1 72°_2 _ �°° _,r 1\\ 5' 39.IB' • all {;; coot. '. .i `dl d°ck . 1 r "'a.• N. 67`-13' F. 1,. - r .r . , • / `� �r q'wlde 11.50' "z _ conc. wall 1. S. 03°-39' W. _.: i t4,.. :''a �_ N. i °-��r W. , ./ • ?/ �i ,i+,ryryryppp _-__Pm9es9ion Line Nang 1 c • .JU1� • •,9 (ace of concrale seawall S. 02°-15' W. )^'; q� � deck 11.35' ----1 •� Y1aon •_e'•ti' __ / / N. 37" 1P W. Water a / 25 B / 4 .21.69' cc!c 't JqI •ms s d ., J Q. I Saa Nu1a e S: 14°-04' W. �. — --- ia 16 r0' On Lina F conc •nG r.�w J .., / �h IP / ' j\e- / 4-. Sly 7//,/ / II s' N. 04°-09' W. 19.30' . ° 0/u. h // / v • ,ti, 13.34' '� �� h, N / Frame Dwelling / . , V A • Dead Linas a9 shown �+ +t, \ Map Ref.No..5 S. 60°-41' W. � '..:' \ _' // / _ l7' //, '°r i > /S. 85° 12' W'. 18.88' J7 /Is •:( j �5r 1158' l / / / / ' /Wpll° N. r�J°-t8' E. 1 110�� tT• 26.3' / l a.l. / i 0.-.2-0,,.t. . , ,' ,... ,. ----;-----757-_,._.....„..... ,T. - ii.,.(.. / / . • , . 1 0' W. -r4-00 , k f da t'• `( - � ' 'r n Posses •f '-s ejter ,•h�� I� Gr4s i tdGa2Gd( l'Wide �_N OS°-39' E�•`� ®m• Right.oi. �� ,•:i!f!` ee Deed Re No. 3 conc. rJ.33' ,,�„7,,;,wti --7- rtp.- Sed Ma Ref. No. 1, 2 8 5� jr. _ I :wall r 1.74 /2` "`��� N Fn'r°a•NneM uvar"Flagn Lines ti,w ° ,: / IOLb � e1 y ':�4.-— �% y, O �; w %/ -- w- ��"`a, ,� '.'�;.,..t od' ar9 ` ( _"`i, .,' weuoad _ - oi�_ I R s �. °�k ' �-}x. (�, ` 146.,fin / �.. Y ,mat \ ��.rd f �:� 1 r�i.ij k F`? 36s3 '9ESz o he\ aaa`o ` S. 86 5iE° � 7 `) s6s3, 3` .. I � /! d n �. of Lao George 1. • o ( � 9 ; . 28,63' itv0 p �� +i{ Mri on Map Ref.No.I '-?;AIIM. — c -..". 4b0_ / \ ___ ;I:------'''' '-.. ' :.. J:' fi \ III--- d r _ =1(1;,4'lr'tl VO,;, \ \. Detail N /z D. _ t,:, / ((, :v1�� .. .. I % �� tfp r I °��y, :°s -� ) �) ► - ONIl 66616 Z Nnr yb,y i �O 3.LVC1 0 o .o pzm 'O CoC,�Co I aur?c QZ RAJI Q���j -PUr7p t7Z "IDI Igo i Rr� I kj l �c LAJ©�P' -� jo aT-TS wo o ' u �s U!W .�i �--IJ �o� -41 � � 5 I „PPPOD nllguoglo JO UAN?L Lj �}- L. U 1W C � u( apr g # ( s �fl� UIw q uo ................ ps s� 1'�2 �.ca1 u01}0) cry i,.a� S \ VON .0 f W es� GG 1 rx)w Q1 au fly 's "J 1 1CP1 � � �" ►�� � b� �i�}off 9 �P PLjD UKP' Li 1 M �� _ man laa ti dw a / d (4M) I�dgoq 1-ia1 S 1 0 �g �O 5N1 '� /i •.,� , }����, �T wads - - tw .� c�Curd �Ma S L g8q Pln� 5 �(-7 — � W u cv }��' .� ..O�'b sfs Gul I x s h1 c)(49 mqj ............ ZZ x Vut7f 19LL = auur7)GAa617Jo _ u,�p ---�_. ---- �\an3 _ Pcpc;� 60L (3 ;p ra e, ��3 u o jo 4:zmcu ��n -c-Kn qL-91 c)Gq : po-1 il-7 J�Oq"JEXO JO�r-u+1 T-T?Qt7 AG .4�1 a/ a oo .1 wjo pa a lrlba 8 C 01:1 u6«aa pmpuV49 -ua(J ..afw uo1 �aol )ddd e5` ,X wrap bu lnas -Q ] p / too 1� auuoy LLJ ooapo9 -JaaL4, . ' �] .11 9D t