Loading...
4.18 4 l 4.18 FINANCIAL\202\Purcliase-Highway Building on Big Boom-Bluescope Construction-Best Value and Piggybacking Sourcewell-Establish Capital Project Transfer From Capital Reserve 64-5-3 RESOLUTION AUTHORIZING PURCHASE AND CONSTRUCTION OF HIGHWAY BUILDING ON BIG BOOM ROAD BY BLUESCOPE CONSTRUCTION, INC. AND ESTABLISHMENT OF HIGHWAY BUILDING ON BIG BOOM ROAD CAPITAL PROJECT FUND #238 RESOLUTION NO.: ,2021 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury's Highway Superintendent has recommended that the Town Board authorize the establishment of a Highway Building on Big Boom Road Capital Project to provide for the purchase and construction of a Highway Department building on Big Boom Road, and WHEREAS, Sourcewell is a cooperative, municipal purchasing program that specifically benefits municipalities countrywide, including the Town of Queensbury, which program combines competitive bidding and best value criteria, and WHEREAS, the New York State Legislature adopted legislation allowing any political subdivision in New York State to "piggyback" off an existing County/State Bid and therefore, due to the agreeable and advantageous terms represented by B1ueScope Construction, Inc., in this instance, the Town of Queensbury wishes to piggyback with Sourcewell for the purchase and installation of a Rough Order Magnitude (ROM) Storage Building as set forth in BlueScope Construction's letter and proposal dated April 23, 2021 for the amount of$534,060 as presented at this meeting, and 4 WHEREAS, the Town of Queensbury will adhere to all New York State bidding requirements, and WHEREAS, the Town Board wishes to accordingly establish the Highway Building on Big Boom Road Capital Project No.: 238 and authorize withdrawals and expenditures in the amount of $534,060 from Capital Reserve No. 64 to fund this Capital Project, and WHEREAS, in accordance with New York State General Municipal Law §6(c), the Town Board is authorized to withdraw and expend funds from Capital Reserve No. 64 subject to permissive referendum, NOW, THEREFORE,BE IT RESOLVED, that the Queensbury Town Board hereby authorizes establishment of the Highway Building on Big Boom Road Capital Project No. 238 in the amount of $534,060 to establish funding for expenses related to the Capital Project described in the preambles of this Resolution, and BE IT FURTHER, RESOLVED, that the Queensbury Town Board hereby approves and authorizes the finalization of design consistent with the Sourcewell bid and purchase and construction of a Rough Order Magnitude (ROM) Storage Building by Blue as set forth in B1ueScope Construction Inc.'s letter and proposal dated April 29, 2021 substantially in the form presented at this meeting and in accordance with the cooperative, municipal purchasing program Sourcewell for the amount of $534,060, and BE IT FURTHER, RESOLVED, that the Town Board acknowledges that the exact details of such building and the price will be determined consistent with the Sourcewell bid during the finalization of design process and that the Town Board will have to approve such bidding and final price at that time if different than that approved in this Resolution and it is a condition of approval that BltteScope Construction,Inc. shall have to comply with the New York State Wicks Law for this project, and BE IT FURTHER, RESOLVED, that this Resolution is contingent upon B1ueScope Construction, Inc., paying prevailing wages as required for municipal projects under New York State Laws, and BE IT FURTHER, RESOLVED, that the Town Board hereby finds that the withdrawals and expenditures for such Capital Project are expenditures for a specific capital project for which the Capital Reserve Fund No. 64 was established, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs establishment of appropriations and estimated revenues as follows: • 001-9950-9030-0064 Transfer to Capital Project - $534,060 • 238-0000-55031 Interfund Revenues - $534,060 • 238-1620-2899 Capital Construction- $534,060 and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Budget Officer to amend the Town Budget, make any adjustments, budget amendments, transfers or prepare any documentation necessary to establish such appropriations and estimated revenues, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to execute any necessary documentation, including any needed Agreement between the Town and BlueScope Construction, Inc., in form acceptable to the Town Supervisor, Highway Superintendent, Town Budget Officer and/or Town Counsel, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor, Highway Superintendent, Town Budget Officer, Purchasing Agent and/or Town Counsel to take any and all action necessary to effectuate the terms of this Resolution, and BE IT FURTHER, RESOLVED, that this Resolution is subject to a permissive referendum in accordance with the provisions of Town Law Article 7 and the Town Board hereby authorizes and directs the Town Clerk to publish and post such notices and take such other actions as may be required by law. Duly adopted this 3rd day of May,2021, by the following vote: AYES NOES ABSENT: , " m� nx/�m,wno I,It; �u�S�m ��—LUESCO^ � woF11A 102 CONSTRUCTPON 'paa�Mo �o�uxwo�u/ A w�w� mnm�mm oh|23.2O21 � /pz/."./'..o/sm�ou� wvv! ^c.` Honorable John SUnUgh Town Supervisor 742 Bay Rd. QUo8Onbury. NY12804 Regarding: Highway Storage Building Ouoonobu/y. NY Dear Mr.Stmugh: BlueScope Construction is pleased to present our revised proposal for the above referenced facility.Our history of service includes the successful competition nf over 1.OUO projects w|thnut0mr0|OaKioO. |iUg8diOOO[|iqUid8tedd8magen.VVghUpethiS type of service history will be part of the evaluation of each competitive offer as you review"best value"for this project.VVo look forward 0o offering our service bn your agency for this new facility. By purchasing this facility through the Sourcewell contract,you can buy the building and construction services without going through the traditional bid process,saving you time and money.Additionally,the design-build process is collaborative and ensures you get the facility you desire 8t the price you have funded. Under this offering,we provide a firm fixed price so you can avoid the high cost of multiple change orders.You'll still get the local execution on the project ynudeninao|Ongwith factory-direct pricing on the building shell.You'll find this method is much easier than typical procurement methods and helps you avoid the pitfalls of the low bid process. As General Contractor, BlueScope Construction is teaming with Whelan and Curry Construction local builder in the role of Prime Subcontractor.An the prime subcontractor Whelan and Curry Construction will bo responsible for coordinating all local on-site vendors,trades and subcontractors This in our typical project appmouh. uhUzing |ooa|opeo|a|iohSknmwnondtmak»dk) perform at a high level of quality and service. We believe this approach will be the best value: national experience and oversight from BlueScope Construction and local presence and small business participation from Whelan and Curry Construction. VVn believe our proposal iS the best value based nO the following: * B|ueGoopu Construction io the preeminent supplier of pre-engineered buildings(PEB)with multiple North American manufacturing plants. BlueScope Buildings a member of the Metal Building Manufacturers Association, Design-Build Institute, and UG Green Building Council. ° BlueScope Building PEB brands,including Butler Buildings,are the world's most popularbmonds with more total in- place oquana600tagethanonyo8hermonuhaourer. ° As part of BlueScope Buildings, BlueScope Construction offers factory4irect pricingonthoPE8otmoutfavomd customer pricing. ° The Butler-Cote TM standard finishing system on metal panels has a 25-year warranty guaranteeing resistance to chalking and fading of the paint.This includes blistering, peeling,cracks or chipping. * The MR-24@ metal roof system is the most specified standing seam metal roof in the industry. �yright B1ueSoqpeCbnsftddn,Inc 2021 This Rqoosalcor#ainsinformagonconfidenffalandpWetaiy to BILeSoppeConstruclion,Inc Anyinformalion,data anddramngs included in this Proposal are supplied to you Mh the understanding Mat they W#beheld oonfidenft,used m�for the purpose of evaluaging this Proposal,and wil not be disclosed to bid partiaswiho 0epdorwfflenconsent of8lue3copmConstruciion,Inc. 4-23-2021 Page 2 of 2 • BlueScope Construction is a national contractor with a direct connection to a local general contractor network giving you a local presence and small business participation on your project. • Our experienced team has built over 1,000 government projects. • We offer unparalleled customer service with more than 85%of our business each year from repeat customers. • BlueScope Construction and BlueScope Buildings have outstanding quality control and the capability to build to the highest levels of construction performance. For these and many other reasons noted throughout this proposal,we believe you will receive the best value building by utilizing BlueScope Construction.Attached are the Scope of Work and Schedule of Values. Please note that this offer is based on a design-build solution and the Scope of Work defines the intent of our proposed offer to furnish and install this Project for the price listed on the Schedule of Values document as per our Sourcewell purchasing cooperative contract vehicle. Thank you for your interest in our BlueScope Construction team and our Sourcewell contract for your facility needs. We welcome any questions or comments you may have regarding this proposal. Please contact Rasa at the number stated below. Regards, r G'�gs'cr/ Rasa Kozak Brian Aldrich Project Manager Director, Government Services Phone: 816.245.6421 Phone: 816.245.6886 Cell: 816.681.4328 Fax: 816.245.6899 rasa.kozak()bluescopeconstruction.com bn aid richQbluescopeconstruction.com Copyright BIoeScope Conshdon,Inc.2021.This Proposal cnnfains informah'on confidential and proprietary to BlueScope Cons6uction,Inc.Any informaton,data and drawings included in this Proposal are supplied to you with the understanding that they wi#be held conffdenUalt,,used only for Me purpose of evaluafing this Proposal,and will not be disclosed to third parties wdhout the prior written consent of BlueScope Construction,Inc. man Town of Queensburry Queensbury, AlY 2-1658—Highway Building 4111/23/2021 ATTACHMENT A SCOPE OF WORK --� BUTLER BUILDING MATERIALS Division 13 m SP ,.. (7,0I iSTRUCTION Building Structural System General The Building Structural System furnished by Butler Manufacturing/BlueScope Construction shall be as follows: Heighte Unit 1 40'-0" 60'-0" 14'=10 LRST 1/4 :12 3 at 20' 8°stem wall and 8"Piers Low Structural Type Description—General Pre-engineered Building Systems(PEB) The design of the LRST—single slope with tapered columns The endwall of the structural systems consist of rigid frames with endwall post.The endwalls have not been designed for future building expansion. In the longitudinal direction of these structural systems, rod bracing, portal frame will be used to resist longitudinal loads. This primary framework supports roof structurals and wall structurals,which, in turn,support the roof panels and wall panels, respectively. Roof structurals will consist of cold form Z's or Cis appropriately designed to meet design criteria. The wall structurals consist of cold form Z's or Cis designed to resist horizontal loads from the walls. Unless specified otherwise, BlueScope Construction will determine the structural system and the type and configuration of components that make up the structural system that satisfy the requirements necessary to meet codes,loads, building layout and clearances. Copyright, BlueScope Construction.Inc,2021. Any information,data and drawings included in this Proposal are supplied to you with the understanding that they will be held confidentially. used only for the.purpose of evatuahng this Proposal and will not be disclosed to thud parties without the priorwritlen consent of BlueScope Construction.Inc. r A NNE* r 4ti _ _ -•�— Town of Queensburry Queensbury, NY 21658—Highway Building 412312021 Design Criteria -- • • •• International Building Code IBC18 • 2018 •e Standard Occupancy Structure ' oo •.0 8 a o a.• • 20 psf non-reducible D •• ••• 5 psf or actual-whichevergreater) • ••• 50 psf • ••• • 5 psf • 108 mph Exposure B • Enclosed T. • Ss=23.8%S1= 6.8% e B • none D- o o• o •• • L1180 Live load • L1100 10 year wind or lateral crane © •• L1150 Live load o L190 10 ear wind Structural Steel Design All structural mill sections or welded-up plate sections shall be designed in accordance with the 15th Edition of the AISC Specifications for the Structural Steel Buildings. Cold-formed steel structural members shall be designed in accordance with AISI Specification for the Design of Cold-Formed Steel Structural Members. Steel bar joists shall comply with specifications of the Steel Joist Institute. Welding Welding procedures shall be in accordance with the American Welding Society Structural Welding Code. Structural Painting All Butler structural steel components shall be factory cleaned to remove all loose mill scale and other foreign material generally conforming to SSPC-SP 2(Hand Tool Cleaning).The parts are shop coated with a single coat of gray corrosion inhibiting primer keeping with Steel Structures Painting Council(SSPC)Paint Specification 15.This primer is considered a temporary and provisional coating. This single coat primer is not an intermediate or finish coat. Cold formed Z's and C's will be G-30 galvanized and clear acrylic coated. Anchor Bolts and Miscellaneous Steel Unless requested by client,anchor bolts,embedded plates, handrail, pipe bollards,and other miscellaneous steel components are excluded from the building shell unless specifically included in our proposal. Exceptions/Clarifications Use of ESFR sprinkler systems will require coordination of the sprinkler heads and the roof secondary members. If this coordination does not occur during the design of the steel building,field modifications may be required.The engineering and any field modifications required will be billed as a change order. Copyright BlUeScope Construction Inc 2021 Any information,cata and drawings included in this Proposal are supplied to you:vilh the understanding that they will he held confidentially. used only for the purpose of evaluatino this Proposal,and vnll not he disclosed to third parties without the prior writlen consent of BlueScope Construction.inc mg ` '` - BLUESCOPE CONSTRUCTION AF '*1_R - — Town of Queensburl y _- - — Queensbury, NY I f 21658—Highway Building 412312021 —i - AAR-241 Roof System General The roof shall be MR-240 roof system as furnished by Butler Manufacturing as follows: ; \l Panels shall be factory roll-formed, 24"wide,with 2 major corrugations, 2"high (2'%" \� including seam), 24"on center.The flat of the panel shall contain cross flutes 6"on center perpendicular to the major corrugations the entire length of the panel. Ridge assembly shall be designed to allow roof panels to move with expansion and contraction. Roof panels shall be factory pre-punched at panel end to match pre-punched holes in \ `" the eave structural member. Panel end splices shall be pre-punched and pre- notched. v ' r _ Panel Material and Finish (Alzn) 4 ' Panel material and finish shall be 24-gauge steel coated both sides with a layer of i Y acrylic coated GalvalumeO aluminum-zinc alloy(approximately 55%aluminum,45% zinc)applied by the continuous hot dip method. Minimum 0.55 ounce coated weight per square foot as determined by the triple spot test per ASTM Specification A-792.A clear acrylic film is applied for additional protection. System Design MR-24 roof system panel shall be designed in accordance with AISI Specifications for the Design of Light-Gauge, Cold-Formed Steel Structural Members or CAN/CSAS136 Cold-Formed Steel Structural Members—latest edition. Panel system shall be designed to support design live load. All endwall trim and roof transition flashings shall allow the roof panel to move relative to the wall panels as the roof expands and contracts with temperature change. Fasteners Connection of MR-24 roof system panel-to-structural members,except at eave,shall be made with clips with movable stainless steel tabs that are seamed into standing seam sidelaps. MR-24 roof system panel-to-panel connections shall be made with a positive,field-formed standing double-lock seam,formed b Y P 9 a s ecial lock seamin machine.The � _ machine field forms the final 180 degrees of a 360- The 360'double-lock standing seam on the MP,-24 roof system is the same seam degree Pittsburgh double-lock standing seam;all used on gas tanks and soda cans. sidelap sealant shall be factory applied. U. L. Uplift ratings The MR-24 Roof System carries an Underwriters Laboratories(U,L.)wind uplift resistance classification of 90 to ensure structural integrity and possible reduction of insurance rates(construction numbers 62,62A,&178). Copyright. BlueScope Construction.Inc 2021 Any information,data and dratmngs included in this Proposal are supplied to you with,he understanding that they will be held confidentially, used only for the purpose of evaluatina this Proposal and will not be disclosed to third parties without the prior written consent of BlueScope Construction.Inc MA BLUESCOPE CONSTRUCTION (1� a t. � 5 ,� j•f r to z+ ek� � � �� 4x-'-•- `1����`�1 �s� ` Town of Queensburry Queensbury, NY 21658—Highway Building :112312021 Provision for Expansion/Contraction Provision for thermal expansion movement of the MR-24 roof system panel shall be accomplished by the use of clips with a factory centered,stainless steel moveable tab.A force of no more than 8 pounds will be required to initiate tab movement. Each clip shall accommodate a minimum movement of 1.25"in either direction. i �U7"LER Roof Accessories Gable Trim Gable trim shall be Butler contour type and shall be provided at gables.Gable trim shall be fabricated from 26-gauge galvanized steel,ASTM A525, G90 coating,and shall be painted in a Butler-Cote®paint finish in a standard color. Eave Trim Eave trim shall be Butler contour type and shall be provided at eaves. Eave trim shall be fabricated from 26-gauge galvanized steel,ASTM A525, G90 coating,and shall be painted in a Butler-Cotee paint finish in a standard color. Copyright' BlueScope Construction Inc 2021 Any information,data and dra^rings included in this Proposal are supplied to you with the understanding that they will be held confidentially, used only for the purpose of evaluating this Proposal.and will not be disclosed to third parties without the Prior written consent of BlueScope Construction.Inc. 46 CONSTRUCTION Mo �=--"�:."",..b ___:.: 'a---__ • Town o;`Queensburly Queer,sbury, AIY — 21658—Highway Building 412312021 hadowaj1TM Wall System General ShadowallTM wall system panels shall be as furnished by Butler Manufacturing as follows: l Panels shall be 36"wide with four major corrugations, 1-7/16" high and 12"on center with two minor corrugations between each of the major corrugations the entire length of the panel. 36" Wall panels shall be factory pre-punched and shall match pre-punched holes in structural. 4 } Panel Design Panel design shall be in accordance with AISI Specification for the Design of Light- Gauge, Cold-Formed Steel Structural Members,or CAN/CSA-S136 Cold-Formed Steel Structural Members,and in accordance with sound engineering methods and practices. Panel Material and Finish (Cool Birch White) The ShadowalfT"system is designed to Panel material and finish shall be 26-gauge painted GalvalumeO aluminum-zinc alloy require tip to 33%fewer fasteners than most as per ASTM Specification A-792 with exterior colors of Butler-Cote finish system, a ribbed panels.In addition to lowering installation costs,this also results in reduced full strength, 70% Kynar 5000 or Hylar 5000°fluoropolymer(PVDF)coating. heat lost through the wall for enhanced Manufacturer shall warrant that coating shall not peel, crack or chip for 25 years. For thermal performance, a period of 25 years chalking shall not exceed ASTM D4214#8 rating and will not fade more than 5 color difference units per ASTM D2244. Interior color shall be Light Gray polyester color coat not formulated for exterior weathering. Fasteners Panel-to-structural connections shall be made using ScruboltTm fasteners with Torx°heads or self-drilling screws with Torx heads. Panel-to-panel connections shall be made with self-drilling screws with Torx heads.All exposed fasteners shall be pre-painted to match wall color. Copyright. SlueScope Construction.Inc 202' Any information,data and drawings included in this Proposal are supplied to you enlh the understanding that they will be held confidentially. used only for the purpose of evaluating this Proposal anal vAli not be disclosed to third parties without the pnor:written consent of 81ueSwpa Construction,Inc CONSTRUCTION 11129"N' $ -W'v Town or Queensburry - - QueensburY, W 21658—Highway Building 4123120.21 MOD-36 U11all Partition Panels (Interior White) (Both sides of partition wall) MOD-36 wall liner panels shall be provided as follows: 36" MOD-36 wall liner panels shall be formed from 28-gauge 2-9'16•lrpical coated steel with a minimum yield strength of 80,000 psi 9y16• and shall be nominal 36"wide with corrugations Yz'high, 3"on center. Appropriate pre-painted outside corner,inside corner,channel cap,and trims at liner penetrations are included;however, base and column trims are excluded.Purlin closures included. Null Accessories Butler Pre-Hung Personnel Doors Personnel doors shall be provided as per Butler's standard product offering as follows: (500 Series) Three(3)each—Tx 7'with panic hardware,closure and kick-plate Personnel doors shall be pre-hung hollow metal type and meet the requirements of Commercial Standards SDI-100. Door leaves shall be 13/4"thick,full flush,constructed of 18-gauge hot dipped galvanized steel(A60), prime painted in beige color. Doors to have an insulated polystyrene core continuously bonded to door skins. Door frames shall be 16-gauge galvanized steel (A60)and prime painted in beige color. Doors shall be complete with aluminum threshold,weather-stripping,and full mortise ball bearing hinges. Doors shall have a Hager 701 exit device with lever locket.Closers shall be falcon SC71 heavy duty. Overhead Door Openings Overhead door openings shall be provided as follows: Two(2)each 14'x 12' One(1)each 12'x 12' Overhead door openings shall be as per Butler standard details complete with structural secondaries for jambs and head,drip gutter trim for head,and trims for jambs as appropriate for the Butler metal wall panels. Copyright Btu=Scope Construction.Inc.2021, Any inforination data and dravnnos included in this Proposal are supplied to you with the understanding that they•mil be held confidentially. used only for the Purpose of evaluating this Proposal,and cnll not be disclosed to third parties without the prior wrnlen consent of BlueScope Construction.Inc c.. yy 1 Town of Queensbuny Queensbury, NY 21658—Highway Building 412312021 �d9��ER Insulation General Roof and wall insulation shall be faced fiberglass blanket insulation furnished as follows: Roof—R30 (31/2"top and 6"Bottom Faced) Wall—R19 (6"faced) Note:The R-values listed above are not continuous where compressed at the purlins and girts Insulation Fiberglass shall be as outlined in the North American Insulation Manufacturing Association(NAIMA 202-96)specification,or equal.The fiberglass shall be faced with WMP-VR-R on one side.The composite of fiberglass and facing shall have surface burning characteristics not to exceed 25 flame spread and 50 smoke developed when tested in accordance with U,L.723 test method or ASTM E84 test method. Facing The facing shall be WMP-VR-R.WMP-VR-R is composed of PSKP,white polypropylene film,fiberglass and polyester scrim, metallized polyester.The resulting facing shall have a water vapor transmission rate of 0.02 US perm(ASTM E96). Sky-Web® Fall Protection and Insulation Support System General Butler's exclusive Sky-Web°fall protection system shall be installed to provide additional job-site safety and insulation support for the Butler roof ' '' 'I'r' `'`` system. = _ Physical Properties The Sky-Web system basic mesh shall be a 1,000 denier polyester yarn r�,r ¢ ` �•r 2 J r'y interwoven on a nominal'/2"square grid coated with a fire retardant and ultraviolet stabilized PVC based binder.The mesh shall have a tensile,, strength(pounds/yaM)of 15 pounds in each direction and a weight between 0.28 and 0.32 ounces per square foot. System Application The roof structural system shall be in place prior to installation of the Sky- s!:y-,,Veb1 Fall Protection,and Insulation support sysiefr nrctects Web system.The Sky-Web system shall remain in place after the metal workers f om falls from the leading edge cf the roof while aiso roofing is installed. protecting workers below from dropped tools.It increases worker productirty saririle improving safety.After construction it senses as a virtually rrrvisibie insidation support system Copyright Bluescope Construction Inc 2021 Any information,data and drawings included in this Proposal are supplied to you with the understanding that they will be held confidentially. used only for the purpose of evaluat a this Proposal and will not be disclosed to third parties without the prior Wnuen consent of Sluescope Construction.Inc. r ff;e _ -- �.__ — Town of Queensburry Queensbury, NY 21653—Highway Building 4,123/2021 ATTACHMENT �A p� -- SCOPE O WORK V ORK ANCILLARY SERVICES Architectural Services Structural Design and Engineering INSTALLATION AND SITE PREPARATION Division I m GENE'b"i - ", EQUIREMENTS General Conditions Project management Project support Site maintenance during construction Site Safety Program Final clean up—all work to be"broom clean"unless noted otherwise Division 2 m Mobilization Slab prep-building New driveway prep and fabric Foundation excavation and backfill Earthwork-mist.grading Spread topsoil and seed two(2)sides of building Division 3 v _:OPICRETE Footing concrete figured to be 2'-0"x 1'-0" Eight-inch (8")frost wall concrete Piers concrete per structural design Pier footing concrete per structural design Six-inch(6")concrete slab Concrete reinforcement and accessories: Strip footing Wall Piers Pier footing Chairs-footing and slab Under slab poly Expansion joint and cap Copyright: 61u95cope CenSt(ucddn.Inc 2021 Any information data and dra:vings included in this Proposal are supplied to you with the understanding(hat they will be held confidentially. used only for the purpose of evaluating this Proposal,and trill no!he disclosed to third parties without the onor written consent of BlueScopa Construction.Inc. 17, LNIS,., BLUESCOPE CONSTRUCTION \N / u : tl ! K A -s. ti Town or Queer?sburry Queensbury, NY 21658—Highway 'Building 412312021 Division .,f \SONNY Not Included Division �RaTALs Not Included Division 6 - a&�,, , `,',\.jD PLASTICS Not Included Division 7 m THE1 MAj'_ ,,_ ;,:.. . `_:ISTURE PROTECTION Two-inch (2") rigid insulation(00)at foundation Sill Sealer/Caulk Division 8 e D00i..:. fli'ND WINDOWS One(1)12'xl2' insulated sectional door Two(2)14'x12' insulated sectional door Three(3) Overhead Door Operator Division 9 ® ' _, OR FINISHES Light gauge metal to frame Restroom Light gauge hat channel for liner panel Mod-36 wall and ceiling liner for Restroom Paint hollow metal doors and frames Cabinets and countertop Division 1 ._. .�r CIALTIES Not Included Division 1=i a __11.]i PMENT Not Included Division 12 — f_RNISHINGS Not Included Division 13 — INSTALLAT° Oi'., -,:!,'' BUILDING AND SPECIAL C®NS14%•`t lqr,'TI®N Installation of Butler Building Materials, Summarized Above Complies with BlueScope Construction Safety practices Division 14 e -­ `ING SYSTEMS Not Included Copyright- BlueScope Construction.Inc.2021. Any information,data and drawings Included in this Proposal are supplied to you'with the understanding that they will oa helot confidentially used only for the purpose of evaluating this Proposal.and will not be disclosed to third parties:without the pnor written consent of BlueScope Construction.Inc. BLUESCO E CONSTRUCTION 7 fir' s Wgw "`; �" tea, ,. Town of Queensburry - --- Queensbury, Ply 21553-Highway Building 412312021 Divisions i Li . `T,; �IINIAN Provide HVAC system including two(2) unit heaters at garage one(1)forced air heat system for Restroom and —- Breakroom Sanitary sewer to include e-1 grinder pump station. The owner is responsible for connection/tie-in, Water service to 5'-0"outside building perimeter Gas service to 5'-0"outside building perimeter Oil water separator One(1) Catch Basins Two(2) Exterior Hose Bibs Two(2) Interior Hose Bibs Divisions 16 6 " ,F7CTR1CAL Feed new building from existing 100 amp meter Convenience outlets at forty-eight inches(48")AFF per drawings Overhead door operator connections Interior led strip lighting in each bay Exterior wall packs and yard light Exit signs/lighting ASSUMPTIONS, CLARRCAT'IDNS AND EXCLUSIONS Assuai,',?'ons A Standard Butler Color will be specified Geotechnical Report was not provided,This proposal assumes an allowable soil bearing of 2,000 PSF Davis-Bacon Prevailing Wages Delivery date180 days,following receipt of all approvals Warranty; Includes one(1)Year Materials and Installation Connection to existing utilities,will be within 5 feet of building slab perimeter Utilities have adequate capacity for building needs Progress Payment Invoicing,according to Schedule of Values,submitted with no more than one invoice per month Clarific. ° 'ions This offer is based on a design/build solution and this proposal supersedes all other plans and specifications related to this project. If there is a discrepancy between plans or specifications provided for this project and this proposal,the descriptions included in this Scope of Work shall take precedence.This proposal is contingent upon mutual agreeable terms. Exciu-.­ =eras Sales tax, City shall provide necessary tax-exempt certificate Builders Risk insurance Municipal Agency and Building Permit application fees Site work other than building-related sitework mentioned above Rock excavation Air infiltration/pressurization requirements Fire Alarm, Fire Protection systems Special painting or galvanizing of structural steel Copyright BluaScopa Construction,.Inc.2021 Any information.data and drawings included in this Proposal are supplied to you with the understanding that they will be held confidentially used only for the purpose of evaluating this Proposal and.-Al not be disclosed to third parties without the prior written consent of BlueScope Construction.Inc - y . MW AN7 T 'R r Town of��ueensburry - _-_ - Queensbury, NY 21658—Highway Building 41231202.1 Interior build-out,finishes,millwork,etc. Tap Fees Building and site signage Furniture, fixtures and equipment Utility consumption charges and service fees. Material testing and inspection services Hazardous material testing and abatement Winter construction costs(i.e.temporary heat,temporary shelter,concrete additives,etc.) National Grid Fees-confirmation on service Bollards Any labor and materials not mentioned above Company Information for Order Entry Includes BlueScope Construction, Inc. Sourcewell Contract Number,013019-BSC Tax ID Number:43-0949971 Copyright: BlueScope Construction Inc.2021, Any information,data and drawings included in this Proposal are supplied to you with the understanding that they will be held confidentially, used only for the purpose of evaluating this Proposal and will not be disclosed to third parties without the prior written consent of BlueScope Construction.Inc01 BLUESCOPE C-ONSTRUCTION SEE., EN - Town of Q u a a isbury Queensbury, NY 21043—Highwpy Building 4 23/2021 ATTACHMENT B __--- SCHEDULE OF VALUES Schedule of Values per Division, as defined above: • e • • Division 1 General Requirements $51,006 1A Design &Ancillary Services $17,062 1B Payment & Performance Bond $2,848 Division 2 Existing Conditions $53,002 Division 3 Concrete $68,641 Division 7 Thermal and Moisture Protection $7,940 Division 8 Doors and Windows $18,448 Division 9 Interior Finishes $3,153 Division 13 Special Construction (PEMB Installation) $111,988 13A Special Construction (BBNA Materials) $80,681 Division 22 Plumbing $52,793 Division 23 HVAC $23,539 Division 26 Electrical $42,959 TOTAL = $534,060 This quote is valid for seven (7)days Copyright: BlueScope Construction,Inc.2021. This Proposal contains information confidential and proprietary to BlueScope Construction,Inc. Any information. data and drawings included in this Proposal are suoplied to you with the understanding that they will be held confidentially,used only for the purpose of evaluating this Proposal,and will not be disclosed to third parties without the prior written consent of BlueScope Construction.Inc ►' '= " = In , - B L UESCOPE CONSTRUCTION