Loading...
Narrative [[669,2537,1541,2594][12][,I,][Times New Roman]]“All stormwater management plans shall [[1503,2537,2300,2594][12][,I,][Times New Roman]]be designed so that post-development [[300,2594,1298,2651][12][,I,][Times New Roman]]run-off rates and volumes are equal to or less [[1265,2594,1843,2651][12][,I,][Times New Roman]]than pre-development run- [[1809,2594,2300,2651][12][, I,][Times New Roman]]off. Post-development [[300,2652,1235,2709][12][,I,][Times New Roman]]direction of flow and type of discharge shall [[1197,2652,2122,2709][12][,I,][Times New Roman]]be the same as pre-development conditions.”