Town Engineer.08.20.2009 VISION Engineering CIVIL • STRUCTURAL • MUNICIPAL • ENVIRONMENTAL August 20, 2009 , RECE1 �t Town of Queensbury 742 Bay Road Queensbury, NY 12804 `"T `U@ _. ., Re: SUP 45-2009 San Souci To: Craig Brown, Zoning Administrator As requested, we have reviewed the documentation you forwarded regarding the above referenced project. Included in the revised documents submitted to VISION were: Zoning Board of Appeals Record of Resolution; Response Letter by Nace Engineering, dated July 31, 2009; Site Plan Drawings 49224-1 through 49224-3 by Nace Engineering, dated November 2008 and revised 7/31/09. Based on our review, we offer you the following comments (previous comments with new comments in bold text): 1. Re-grading and replacement of parking area will be necessary after holding tank installation and for the handicap access ramp. Please provide details for installation, approximate fill height required for ramp, and crushed stone and fill specifications. Completed. 2. Please clarify what area is designated for refuse storage and removal. Also please verify if an enclosure exists for such. Completed. 3. Please clarify on the site plan the areas included in the permeability calculation and what the corresponding finish or surface is (lawn, landscaping, etc). Completed. 4. The parking area requires a handicap parking space, signage, and adjacent access aisle. Completed. 5. Please show all known existing and proposed utilities on the site plan including electric, water supply, etc. Completed. 6. There appear to be discrepancies between site data (setbacks and permeability calculations) provided in the attorney letter and the application and drawings submitted which should be corrected. Completed. 7. Consideration should be given to a high-level alarm and automatic shut-off in Tank 1 (above invert) in case of a line getting plugged to Tank 2 or 3. Also please clarify Alarm 1 levels in Tanks 1 and 2 since below outlet shown. Completed. 8. Please provide pipe inverts for holding tanks. Clarification provided. Completed. 9. Please specify erosion and sediment control measures for project. Completed. 10. The total project limits and area of disturbance should be provided on the site plan. Completed. 16 Pearl Street•Suite 200•Glens Falls, NY• 12801 •P: 518.792.9264•F: 518.792.9282 www.visionengineering.org 11. The applicant has submitted a stormwater design in compliance with provisions for a minor project classification. The Planning Board should verify such classification in accordance with Section 147-11 E. Completed. With inclusion of the above project documents and modifications or clarifications, the above applicant has satisfactorily addressed all of our technical review comments.Please do not hesitate to call if you have any questions, comments, or require additional information. Werely,. Ryan, P.E. Page 2 of 2