November 22, 2002 _
FEE ':a V D
Mr. Chris Round
Director of Community Development N O V 2 2 "C
Town of Queensbury TO'P U C I `BURY
742 Bay Road F, /I Uri I_;C-
Queensbury, New York 12804-5902
Re: Site Plan 53-2002
Baybrook Professional Park -,Lot 1 Office Building
Dear Mr. Round:
We have reviewed the submission package for the above referenced project. The
package consisted of the Site Plan Review Application, a Plan Set(dated October 15,
2002) and a Stormwater Management Report, dated October 2002_ The package was
prepared by Nace Engineering,P.C.
We have reviewed the above mentioned documents and offer the following comments:
1. It is our interpretation that the site plan approval,for this lot, is contingent on
approval of the modified subdivision, project number SB 9-2002.
2. Site Layout and Utility Plan (SP-1) -The sanitary sewer lateral crosses the wetland
along the south property line with minimal cover. It appears that the cover is
approximately 1.5 feet. Consideration should be given to rerouting the sewer lateral
or installing an 8-inch diameter pipe (can be installed a shallower slope) and a
manhole.
3. Grading and Drainage Plan(SP-2) -Provisions should be made to allow the eave
trench to weep to the wetlands to ensure that the eave trench drains between storm
events.
4. Grading and Drainage Plan (SP-2) -The outlet information for the catch basin is
inconsistent with the detail on SP-4.
5. Grading and Drainage Plan(SP-2) -The grading in the area between the parking lot
and Bay Road shows a depression. This is inconsistent with the adjacent swales and
the landscaping plan and was probably intended to be a mound instead of a
depression. Please revise accordingly.
6. Grading and Drainage PIan (SP-2) -It appears that the contour around the entrance
sign at Bay Road should be 318' versus 317'.
7. Landscape and Lighting Plan(Sp-3) -The southernmost parking spaces are poorly
lighted,i.e. less than 0.3 foot-candles.
8. Site and Utility Details(SPA)- Detail M indicates that the bottom elevation of the
infiltration system (crushed stone)is at elevation 309.4'. This elevation places the
trench below existing grade. The on-site soils are not conducive to allowing
drainage from the infiltration system. The system should be elevated and
Architecture&Building Systems Englneeong • civil Engineering • Environmental Services• Survey&Land Information services
11/22/2002 12:44 5187867299 ci MALt fA=Ut,1R1=
C.T. MALE ASSOCIATES, P.C.
Mr. Chris.Round
Page 2
constructed in sandy fill or the existing soils replaced with a highly permeable soil
between the system bottom and the wetland boundary.
If you have any questions related to our comments, feel free to call our office.
Sincerely,
T. MALE ASSOCIATES,P.C.
ames R. Edwards,P.E.
Project Manager