Loading...
Staff Notes for 5/18/2021 Town of Queensbury Planning Board Community Development Department Staff Notes May 18, 2021 Site Plan 28-2021 STEPHEN A. BURNETT, TRUSTEE 11 Andrew Drive / WR – Waterfront Residential / Ward 1 SEQR Type II Material Review: application, narrative, site plans, architectural, survey, photos Parcel History:SUB 14-2015, SUB 8-2015, AV 51-2015, PZ 21-2015, 2004-677 docks, AV 27-2021 __________________________________________________________________________________________ Requested Action Recommendation to the Zoning Board of Appeals to complete work on an existing 1.5 story cabin. Resolutions 1. Recommendation Project Description Applicant proposes to complete work on an existing 1.5 story cabin. The existing cabin footprint is 1,365 sq. ft. and proposed is 1,312 sq. ft.; the cabin floor area is to be 1,793 sq. ft. The site has an existing house on the property with a footprint of 1,496 sq. ft.; total site floor area is 4,641 sq. ft. and proposed is 4,985 sq. ft. The applicant had started work in 2019 and was issued a stop work order. A portion of the existing home was damaged by a tree and is now being reconstructed; the existing deck has been removed and a new smaller deck is to be constructed. The interior main floor and basement area are to be renovated; this includes the foundation and wall supports. Exterior improvements include a new entry roof feature, doors and slider doors on lower level. Pursuant to Chapter 179-6-065 & 179-13-010 of the Zoning Ordinance new floor area in a CEA and Variance: expansion of a non-conforming structure shall be subject to Planning Board review and approval. Relief is sough for setbacks. Planning Board shall provide a recommendation to the Zoning Board of Appeals. Staff Comments  Location-The project site is located at 11 Andrew Drive of a 1.318 acres  Arrangement- The site has and existing 1.5 story wood frame house and a 1.5 story cabin on the site.  Site Design- The applicant proposes a new septic system that is for the cabin  Building – The existing 1.5 wood-frame home is to remain and no changes are proposed. The 1.5 story cabin was damaged during the winter a few years ago and repair work had started. A stop work order was issued in 2019 and the applicant had started the planning and zoning application for compliance. Work on the cabin includes foundation work that still requires inspection with Building and Codes. The basement area was improved and is considered new floor area. The basement area now has two slider doors facing the lake, a side door facing the north and a side door with window facing the south. The basement area crawl space area has also been improved. The basement will have a new full bathroom and laundry areaThe main floor has been gutted and the north side of the building was damaged (132 sq ft). The construction on the north side includes a portion of the bunk room and living room area on the main floor and stairs to the basement area. The exterior of the home is improved with a new deck entryway of 211 sq ft. The entry door area is improved with peaked roof area.  Site conditions-The applicant has included photos of the existing site conditions where the area to be disturbed is directly around the home and new septic area. There is no change proposed for any the other portion of the site.  Grading and drainage plan, Sediment and erosion control-The plans indicate an eave trench is to be installed along the new construction on the north side.  Landscape plan-The plans show the existing shoreline planting and the photos also show the existing plantings. The project site is located on Lake George and is subject to the shoreline buffer review. The applicant proposes no changes to the existing shoreline area. Below are the guidelines from the shoreline buffer code section Shoreline Buffer - Section 179-8-040 o -Minimum width 35 ft (Lake George) -For every 700 sq ft of shoreline buffer area –one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 – 24 in native shrubs; 14 herbaceous plants Project site -180 ft of shoreline per survey -Shoreline buffer 180 ft X 35 ft width is 6,300 sq ft -Shoreline buffer area -6,300 /700 = 9 round up to 9 –nine large trees at 3 inch diameter -Ground cover -6,300 /350 = 18 round up to 18(X7) =126 native shrubs and 18 (X14) herbaceous plants=252 Shoreline Cutting restrictions- Section 179-6-050 o Shoreline lots are allowed water access and beaches where 30% of the shoreline or maximum of 75 ­ ft whichever is less 180 ft Shoreline X 30%= 54 ft ( if greater than 75 ft) would be reduced to maximum of 75 ft feet of ­ the shoreline buffer cut to allow a view, access and to reduce runoff (such as angled across the lot).Noting if in excess of 30%/75 ft site plan review for cutting plan. Cross reference 179-8-040 ground cover of shrubs and herbaceous plantings are still applicable ­ within the 30%/75 ft cut area.  Site lighting plan-no lighting information is provided; the board may request clarification on lighting and to note lighting is to be code compliant.  Utility details-The cabin septic is new and to be installed as part of the project. The wood frame home has an existing septic system and no changes are proposed. Both homes draw water from the lake.  Elevations-The elevations show each view of the home.  Floor plans-The floor plans show the basement area and main floor of the home that has been improved.  Waivers-Planning staff has reviewed the applicants request for waivers that include items g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details, r. construction/demolition disposal s. snow removal.  The waivers requested–Staff finds it reasonable to request a waiver as these items are typically associated with commercial projects. The applicant has provide the following: j. stormwater, k. topography, l. landscaping, p floor plans, q. soil logs  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Variance The new construction on the north side is to be 22.8 ft where 25 ft is required. Summary The Planning Board is to provide a recommendation to the ZBA in regards to the relief requested for setbacks and for expansion of a non-conforming structure. st Meeting History: 1 Meeting - 2 -