2000-257 . -� TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5902 518 761-8201
Community Development- Building &Codes (518) 761-8256
CERTIFICATE OF COMPLIANCE
Permit Number: 2000257 Date Issued: Monday, June 23, 2008
This is to certify that work requested to be done as shown by Permit Number 200.0257
has been completed.
Tax Map Number: 523400-239-015-0001-006-000-0000
Location: , 15 WILD TURKEY Ln
Owner: CHARLES MACKEY
Applicant MACKEY, CHARLES & KAREN
This structure may be occupied as a:
Unknown
By Order of Town Board
TOWN OF QUEENSBURY
Issuance of this Certificate of Compliance DOES NOT relieve the (---- avP/1 property owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
BUILDING PERMIT
Town of Queensbury, 742 Bay Road, Queensbury,NY 12804
County of Warren (518) 761-8256
VALUE $ 0 Building Permit No. 2000257
TAX MAP NO. 3 . -1-7
MACKEY, CHARLES & KAREN
Permission is hereby granted to
Owner of property located at 15 WILD TURKEY LANE
in the Town of Queensbiny,to construct or place a PARTIAL DEMOLITION OF RESIDENCE
at the above location in accordance to application together with plot plans and other information hereto filed and
approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance.
Owner's Address:
40 DOUGLAS RD.
DELMAR, NY 12054
Contractor or Builder's Name:
WILLIAMS,. WAYNE.
Contractor or Builder's Address:
Electrical Inspection Agency:
Type of Construction:
DEMOLITION
Plans and Specifications:
PARTIAL DEMOLITION OF RESIDENCE AS. PER APPLICATION
Proposed Use:
PARTIAL DEMOLITION OF RESIDENCE
20 . May 8 2002 . .
$ PERMIT FEE PAID—THIS PERMIT EXPIRES
(If a longer period is required,an application for an extension must be made to the Code Enforcement
Officer of the Town of Queensbury before the expiration date.)
8 May 2000
Dated at the Town of Queensbury this Day of
SIGNED BY<- for the Town of Queensbury
Code Enforcement Officer
TOWN OF QUEENSBURT
742 Bay Road
Queensbury, N.Y. 12804-9725
Application for DEMOLITION PERMIT Permit No. _� s
Instructions for completing the application Date:
Fee Paid: O
1. All applicable spaces are to be completed.
2. Two plot plans are to be submitted, drawn to scale, showing: �1 i _(� I1 1,�
a. lot boundaries, with dimensions and adjacent roads and streets. �'" ��
b. all existing structures, indicating which are to be removed.
c. location of all utilities. R:'1! ® r 2000
3. Fee submitted per current fee schedule. TO.
p: sr r,
Owner of property: �,t/.S gC2 Y" Property Location: /J`� Y�OLA /t€A E I/
Mailing Address: le2 fax Map No. section 3 , Block I..,Lot 7
57o6i4 12rAtGS r
Person responsible for work: WkJ"X/E. 11 tu41L5 Telephone No. /'$% 3S 7
Mailing Address: p c3• s oX 4-1
67.z2 d
Where will demolition material be disposed of? --7— 1 7 —77 Z»C/
Is there any asbestos within building to be demolished? Yes / No JC
If YES, name of firm removing asbestos from structure, license number;and where asbestos will be disposed of:
NAME OF FIRM LICENSE NUMBER
LOCATION WHERE ASBESTOS WILL BE DISPOSED
4' A COPY OF ASBESTOS REMOVAL REPORT MUST BE FILED WITH THIS DEPARTMENT BEFORE DEMOLITION BEGINS.
The following building(s) located on property described above are to be removed:
AL
Previous use of building (circle one): residence garage storage business other
Have all utilities been disconnected? gas U,CS, electric ye,S" , propane y, , water�/r�'
Size of building(s): T
I. 5'6 ft. by ‘O ft. Location on property
2. ft. by ft. Location on property
3. Number of stories: /
4. Foundation type (circle one): full cella' crawl space slab
Foundation will REMAIN BE REMOVED
5. Another structure WILL x, WILL NOT , replace this building.
NOTES:
Signature of Applicant: Z) Y
r owner's agent,architect, contractor
Queensbury Building & Code Enforcement - Res idential Final Inspection
Office No. (518)761-8256 Arrive: G -dm/pm part: am/pm
Date Inspection request received: Inspector s Initials:
NAME: /4/9aie/(.2 / PERMIT#: C
LOCATION: bU 1-9 7'Qk DATE:
TYPE OF STRUCTURE:
Comments
Yes No N/A
Building Number/Address visible from road
Chimney Height/"B"Vent/Direct Vent Location (A -1 INA136(
Fresh Air Intake
3 inch Plumbing Vent through roof minimum 6 inches
Roof Complete/Exterior Finish Complete
PIatform at all exterior doors
Guards at stairs,decks,patios more than 30 inches above grade
Guard at stairwell at 34 inches or more
Guard at deck,porches 36 inches or more
Handrail Termination at Newell Post or Wall
Interior/Exterior Railings 34 inches to 38 inches
Interior Handrails @ stairs 2 or more risers
Grade away from foundation 6 inches with 10 feet
6 inch clearance to sill plate
Gas Valve shut-off exposed/regulator 18 inches above grade
Interior privacy/trim/doors/main entrance 36 inches _
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety glazing
Interior Smoke Detectors:
Every level: Every Bedroom:
Outside every bedroom area:
Inter Connected: Battery backup:
Carbon Monoxide Detector
Attic access 30 inches x 22 inches x 30 inches(height)in accessible area
Crawl Spaces 18 inch x 24 inch access, 1 sq.ft.-150 sq.ft.vents -.
Bathroom Fans,if no window
Plumbing fixtures
Foundation insulation
Floor truss,draft stopping finished basement 1,000 sq.ft.
Emergency egress below grade
Gas Furnace shut-off within 30 feet or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off boiler
Relief Valve(s)installed/Heat Trap/Water Temp 110
Enclosed Stairs Sheetrock Underside minimum%"Gypsum
Basement stairs closed rise>4 inches
Garage Floor Pitched
Garage fireproofmg 1%hour fire door/door closer
Duct work Sealed properly
Gas Logs in Sealed or Glass Enclosure
Final Electrical
Final Survey Plot Plan
As Built Septic System/Sewer Dept.Inspection Sticker
Site Plan /Variance required
Flood Plain Certification,if required
Okay to issue C/C or C/0[Temporary/Permanent]
L:\Building&Codes.Forms\Building&Codes\Inspection Forms\Residential Final Inspection Form revised 100405.doc
Gl..t��
.. _ __ Jobbb
GENERAL INSPECTION REPORT
(518) 761-8256
Town of Queensbury
Dept.of Community Development Date inspection request received: /D 1('I
Building&Code Enforcement
,
742 Bay Road .�� �( '
Queensbury,NY 128t14. Arrive am/pm Depart 7t ' •
-
Inspector's Initials 1
NAME: ni • WJ PERMIT# — I
LOCATION: /.6 I d TIrUC.. kit . DATE: 0 1 d
TYPE OF STRUCTURE: •,
RECHECK '
j6 -•1
y
2.'
$I N/A YES NO`�, COMMENTS
Footings/Piers �:' I C I
4 ,1
Monolithic Pour Form 1 �:
Reinforcement in Place '\ F
The contractor is responsible for ', '
,,
providing protection from freezing �r`
for 48 hours following the placement y. '
of the concrete. i
Materials for this purpose on site •
6Foundation/Wallpour ?N t
Reinforcement in Place .es
l
Foundation/Dampproofing ,), .,)
Backfill Approval t}.,
Plumbing Under Slab ''x•
Plumbing Vent/Vents in Place "'ski ki
Rough Plumbing _ k:
Heating-Rough-In
Insulation 7 `T.,.
Foundation Walls Interior R ��
Foundation Walls Exterior R- ', .
Floors R 'c
Walls R-
Ceiling R- `'
Duct work or piping in
unheated spaces R-
• Proper Vent, Attic Vent %
_;21.#0.A.41--1/liraming
/ Jack Studs/Headers
Bracing/Bridging .
Joist Hangers
Jack Posts/Main Beam
Air Infiltration Barrier
Fire Separation 1,2,3,hour
Penetration Sealed
Fire Wall 2,3,4 hour
Firestopping
1 , _ ,,,,,L- i ,A,,,, ,)_.(c.--..„.
, ,
AP 6 ---__ _ ,__ v.: _
:_:::„.... ....., _ _.. ,_, . ,,,,........___,
\ ar-„,..,
0., 1---4e,---DA
GENERAL INSPECTION RE ORT
(518 ) 761-8256 1
Town of Queensbury �i
Dept.of Community Development Date inspection request r ceived: P
Building&Code Enforcement .
742 Bay Road t
Queensbury,NY 12804. Arrive P-'fram/pm Depart am/pm
Insp tor's Initials Qi--
NAME: 41�1 (Alt PE411 # °7-0 0G — —
LOCATION: LC} I A i.ufa tly L o re— b .1TE :
TYPE OF STRUCTURE: \if
RECHECK
N/A YES NO; COMMENTS
Footings/Piers
Monolithic Pour Form /
Reinforcement in Place / i
The contractor is responsible for `
providing protection from freezing et
for 48 hours following the placement /I
of the concrete.
Materials for this purpose on site
Foundation/Wallpour
Reinforcement in Place I
Foundation/Dampproofing I
Backfill Approval /
Plumbing Under Slab /
Plumbing Vent/Vents in Place I
Rough Plumbing /
Heating Rough-In
*Insulation
Foundation Walls InteriorR�
Foundation Walls Exterio R •
-
Floors R- /
Walls /IR- r' / 1 2/'/ QY
QrA
Ceiling R- 4
Duct work or piping in
unheated spaces R-
Proper Vent,Atticc4ent
Framing /
Jack Studs/IIeaders
Bracing/Bi dging
Joist Hangers
Jack Pysts/Main Beam
Air Infiltration Barrier
Fire Sgg faration 1,2,3,hour •
Penetfation Sealed
Fire Wall 2,3,4 hour / / /
irestopping i/ � 7 L / - 4,1,-c `-e