Loading...
Site Plans555550 545 0+ 00 1+ 00 2+ 00555PT-1 TP-1 PT-2 PROPOSED RESIDENCE FFE. 556.5'100 . 3 '89.0'7 3 . 0 '37.5'COVERED PATIO FUTURE LOCATION OF POOL PROPOSED INFILTRATION BASIN PROPOSED POTABLE WATER WELL PROPOSED 12'W ASPHALT DRIVEWAY UTILIZING EXISTING CURB, SEE DETAIL #2, DWG C-2.10. PROPOSED LOCATION OF ABSORPTION FIELD, SEE DWG. C-2.10 FOR DETAILS. PROPOSED LOCATION OF SEPTIC TANK PC ℄ DRIVEWAY STA. 0+81.5' PT ℄ DRIVEWAY STATION 2+04.3' DRIVEWAY CENTERLINE (TYP.) PROPOSED ACCESS WALKWAY BY OTHERSR48.00'EXISTING BUILDING TO BE REMOVED AND RESULTING VOID TO BE FILLED WITH FREE DRAINING SOIL MATERIAL MEETING SPECIFICATIONS OF GW, GP, SW, OR SP SOIL TYPES AS CLASSIFIED UNDER THE UNIFIED SOIL CLASSIFICATION SYSTEM EXISTING FENCE TO BE REMOVED EXISTING POTABLE WELL TO BE DECOMMISSIONED. SEE LAYOUT NOTE #6, THIS DRAWING. EXISTING ASPHALT DRIVEWAY TO BE REMOVED BEYOND DRIVEWAY ℄ STA. 0+25 LEGEND: 555 PROPERTY LINE ABUTTING PROPERTY LINE EXISTING 5' CONTOUR EXISTING 1' CONTOUR PROPOSED 5' CONTOUR PROPOSED 1' CONTOUR TP-1 PT-2 APPROX. LOCATION OF PERC. TEST APPROX. LOATION OF TEST PIT SEE DWG. C-2.10 FOR PERC. TEST AND TEST PIT RESULTS PROJECT LOCATION SAVE DATE: 5/7/2021 1:59 PMFILE NAME: Z:\Projects\2021 Projects\21044 - FHB Moon Hill Place\DWG\03 SHEETS\L-1.10_LAYOUT&MATERIALS.dwgPLOTTED BY:QUINN ROESCHDESIGN BY:DRAWN BY:CHECKED BY:############SITE LAYOUT PLANL-1.10 1 10 20 40020 1 inch = 20 feet GRAPHIC SCALE DRAWING NO. PROJECT NO.PROJECTDRAWING TITLEDATE:REVISIONSDATEDESCRIPTIONSTUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, TO ALTER ANY ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION, AND SPECIFIC DESCRIPTION OF THE ALTERATION. 05/05/2020 2104411 MOON HILL PLACETOWN OF QUEENSBURY, NY TAX MAP ID: 289.7-2-2FOOTHILL BUILDERS9 MOUNTAINSIDE DRIVEQUEENSBURY, NY 12804DRAWINGS NOT FOR CONSTRUCTION DWG OFPREPARED FORDIG SAFE NOTE: THIS PLAN SET WAS DRAFTED WITHOUT THE BENEFIT OF "DIG SAFE" MARKINGS. UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT "DIG SAFE" AT 811 BEFORE COMMENCING ANY WORK AND SHALL PRESERVE EXISTING UTILITIES WHICH ARE NOT SPECIFIED TO BE REMOVED IN THIS PLAN SET. MAP INFORMATION: BASE MAP INFORMATION WAS OBTAINED FROM "MAP OF A SURVEY MADE FOR MARIA LEUCI, TOWN OF QUEENSBURY, COUNTY OF WARREN, STATE OF NEW YORK", DATED APRIL 27, 2021, PREPARED BY RUSEL E. HOWARD LICENSED LAND SURVEYING. 1.VERIFY LOCATION OF ALL BUILDINGS, ROADS AND CURBS AFFECTING SCOPE OF WORK. 2.VERIFY LOCATION OF ALL VAULTS, ELECTRICAL DUCT BANKS, MANHOLES, CONDUIT AND PIPING, DRAINAGE STRUCTURES AND OTHER UTILITIES WITH THE APPROPRIATE ENGINEERING DRAWINGS. NOTIFY ENGINEER OF ANY CONFLICTS WITH ENGINEER SCOPE. 3.TAKE ALL DIMENSIONS FROM FACE OF ASPAHLT OR BUILDING TO CENTERLINE OF DRIVE OR TREES UNLESS OTHERWISE NOTED. 4.ALL ANGLES TO BE 90 DEGREES AND ALL LINES OF PAVING AND FENCING TO BE PARALLEL UNLESS NOTED OTHERWISE. MAINTAIN HORIZONTAL ALIGNMENT OF ADJACENT ELEMENTS AS NOTED ON THE DRAWINGS. 5.REFERENCE TO NORTH REFERS TO PLAN NORTH, REFERENCE TO SCALE IS FOR FULL-SIZED DRAWINGS ONLY. DO NOT SCALE FROM REDUCED DRAWINGS. 6.ALL POTABLE WATER WELL DECOMMISSIONING ACTIONS SHALL BE PERFORMED BY A NEW YORK STAT REGISTERED WELL DRILLER, AND SHALL COMPLY WITH THE REQUIREMENTS DESCRIBED IN THE NEW YORK STATE DEPARTMENT OF HEALTH INDIVIDUAL WATER SUPPLY WELLS-FACT SHEET #4 AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION WATER SUPPLY WELL DECOMMISSIONING RECOMMENDATIONS, DIVISION OF WATER. LAYOUT NOTES: 0 SITE LAYOUT PLAN SCALE: 1' = 20" 1 SITE LOCATION MAP SCALE: 1' = 200" SCALE: 1 IN. = 200 FT. SITE SETBACK REQUIREMENTS, ZONE: RR-3A REQUIRED EXISTING PROPOSED PARCEL ACREAGE 3 0.96 ±0.96 ± FRONT YARD 100 ±46 FT ±73 FT REAR YARD 100 ±153 FT ±100 FT SIDE YARD (1)75 ±56 FT ±37 FT SIDE YARD (2)75 ±73 FT ±89 FT 3 554 555550 545 542 543 544 546 547 548 549 551552553554552551552553553 554552553556555552 PT-1 TP-1 PT-2 PROPOSED RESIDENCE FFE. 556.5' COVERED PATIO 20. 0 ' M I N . 10. 0 ' MI N . CONVENTIONAL ABSORPTION TRENCH SYSTEM CONSISTING OF (3) 2'-0"W X 46'-0"L TRENCHES W/ 4"Ø PERFORATED PVC PIPE DISTRIBUTION LATERALS. SEE DETAIL #1, DWG C-3.10. 50% FUTURE EXPANSION AREA 4"Ø SOLVENT WELDED PVC SEWER PIPE, SLOPED AT 1/4"/FT MIN. FROM D-BOX TO TRENCHES. 4"Ø SOLVENT WELDED PVC SEWER PIPE, SLOPED AT 1/4"/FT MIN. FROM HOUSE TO SEPTIC TANK AND SEPTIC TANK TO D-BOX. 1,000 GAL. PRECAST CONC. SEPTIC TANK, SEE DETAIL #2, DWG. C-3.10. PRECAST CONC. (5) OUTLET DISTRIBUTION BOX. SEE DETAIL #3, DWG. C-3.10. 12"Ø NYLOPLAST DRAIN BASIN, SEE DETAIL# 4, DWG. C-3.11. RIM. EL. 552.5' 6"Ø X ±40LF OF CORR. HDPE STORM PIPE. INLET INV. EL. 552.0' OUTLET INV. EL. 551.2' 2'-0"L STONE LINED BROAD CRESTED OUTLET WEIR, SEE DETAIL #3, THIS DWG. CREST EL. 551.75' PROPOSED INFILTRATION BASIN T/BERM EL. 552.5' B/BASIN EL. 551.0' SEE STORMWATER MANAGEMENT NOTE #2, THIS DRAWING. DISTURBED LAWN AREA TO BE SEEDED IN ACCORDANCE WITH STORMWATER MANAGEMENT NOTE #5, THIS DRAWING (TYP.) 10.0 ' M I N . FUTURE LOCATION OF POOL PROPOSED ACCESS WALKWAY BY OTHERS PROPOSED POTABLE WATER WELL, SEE DETAIL#5, DWG. C-3.10. PROPOSED 12'W ASPHALT DRIVE, SEE DETAIL#2, THIS DWG. SILT FENCE (TYP.), ±118 LF SEE DETAIL #1, THIS DRAWING. SILT FENCE (TYP.), ±32 LF SILT FENCE (TYP.), ±40 LF LIMITS OF DISTURBANCE (TYP.), ±19,786 LF BENCHMARK NAIL IN 18" MAPLE EL. 550.9' EXISTING OVERHEAD WIRE (TYP.) DIVERSION SWALE TO BE INSTALLED UPGRADIENT OF ABSORPTION FIELD ROOF LEADER, OUTLET IN INFILTRATION BASIN (TYP.) ROOF LEADERS, OUTLET IN INFILTRATION BASIN (TYP.) >15 % S L O P E S > 1 5% S L O P E S >15% SLOPES>1 5 % S L O P E S >15% SLOPESLEGEND: 555 552 PROPERTY LINE ABUTTING PROPERTY LINE LIMITS OF DISTURBANCE EXISTING 5' CONTOUR EXISTING 1' CONTOUR PROPOSED 5' CONTOUR PROPOSED 1' CONTOUR SILT FENCE STORM PIPE TP-1 PT-2 APPROX. LOCATION OF PERC. TEST APPROX. LOATION OF TEST PIT SAVE DATE: 5/7/2021 1:57 PMFILE NAME: Z:\Projects\2021 Projects\21044 - FHB Moon Hill Place\DWG\03 SHEETS\C-2.10 GRADING DRAINAGE&UTILITIES.dwgPLOTTED BY:QUINN ROESCHDESIGN BY:DRAWN BY:CHECKED BY:############GRADING, DRAINAGE, AND UTILITIES PLANC-2.10 2 10 20 40020 1 inch = 20 feet GRAPHIC SCALE DRAWING NO. PROJECT NO.PROJECTDRAWING TITLEDATE:REVISIONSDATEDESCRIPTIONSTUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, TO ALTER ANY ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION, AND SPECIFIC DESCRIPTION OF THE ALTERATION. 05/05/2020 2104411 MOON HILL PLACETOWN OF QUEENSBURY, NY TAX MAP ID: 289.7-2-2FOOTHILL BUILDERS9 MOUNTAINSIDE DRIVEQUEENSBURY, NY 12804DRAWINGS NOT FOR CONSTRUCTION DWG OFPREPARED FORDIG SAFE NOTE: THIS PLAN SET WAS DRAFTED WITHOUT THE BENEFIT OF "DIG SAFE" MARKINGS. UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT "DIG SAFE" AT 811 BEFORE COMMENCING ANY WORK AND SHALL PRESERVE EXISTING UTILITIES WHICH ARE NOT SPECIFIED TO BE REMOVED IN THIS PLAN SET. MAP INFORMATION: BASE MAP INFORMATION WAS OBTAINED FROM "MAP OF A SURVEY MADE FOR MARIA LEUCI, TOWN OF QUEENSBURY, COUNTY OF WARREN, STATE OF NEW YORK", DATED APRIL 27, 2021, PREPARED BY RUSEL E. HOWARD LICENSED LAND SURVEYING. WASTEWATER TREATMENT SYSTEM NOTES 1.THE ON-SITE SUBSURFACE WASTEWATER TREATMENT SYSTEM SHALL BE A CONVENTIONAL ABSORPTION TRENCH SYSTEM. THE BASIS OF DESIGN FOR THE SYSTEM IS AS FOLLOWS: NUMBER OF BEDROOMS 3 DESIGN WASTEWATER FLOW RATE 330 GPD DESIGN PERCOLATION RATE 1-5 MIN/IN SEPTIC TANK MIN. CAPACITY 1,000 GAL* SEPTIC TANK CAPACITY PROVIDED 1,000 GAL* TOTAL TRENCH LENGTH REQUIRED 138 LF TOTAL TRENCH LENGTH PROVED (3) TRENCHES @ (2'W X 46 L) = 138 LF PLUMBING FIXTURES MAX. 1.6 GAL./FLUSH WATER CLOSETS *NO SPAS OR GARBAGE GRINDERS 2.ALL WASTEWATER TREATMENT SYSTEM COMPONENTS SHALL BE IN STRICT ACCORDANCE WITH THE SYSTEM DESIGN INFORMATION INDICATED ON THESE DRAWINGS, AND WITH ALL N.Y.S. DEP'T. OF HEALTH AND TOWN OF QUEENSBURY REQUIREMENTS. 3.THE DISCHARGE OF WASTE FROM GARBAGE GRINDERS, SPA TUBS, SUMP PUMPS, ROOF DRAINS, WATER TREATMENT SYSTEM BACKWASH AND NON-CONSERVING WATER FIXTURES IS PROHIBITED.ADDITIONALLY, LAWN IRRIGATION SYSTEMS SHALL NOT BE INSTALLED ABOVE THE WASTEWATER ABSORPTION FIELD. 4.THE SEPTIC TANK SHALL BE A PRECAST CONCRETE NON-TRAFFIC TYPE UNIT WITH SANITARY TEES OR BAFFLES AT INLETS AND OUTLETS. MINIMUM TANK CAPACITY SHALL BE AS SHOWN. FOR TWO-PIECE TANKS, PROVIDE SEALANT PER MANUFACTURER'S INSTRUCTIONS BETWEEN THE TANK SECTIONS. THOROUGHLY CLEAN JOINT IMMEDIATELY PRIOR TO INSTALLING SEALANT. IF AIR TEMPERATURE IS BELOW 65°F., WARM SEALANT TO A PLIABLE CONDITION. SET TANK LEVEL ON NO. 2 CRUSHED STONE AS INDICATED. 5.THE EXTERIOR SURFACES OF THE SEPTIC TANK SHALL BE THOROUGHLY COATED WITH THE MANUFACTURER'S STANDARD ASPHALT WATERPROOF COATING. 6.BUILDING AND GRAVITY SEWER PIPING SHALL BE SOLVENT WELDED SCH. 40 PVC PIPE. INSTALL SEWER PIPING AT A UNIFORM SLOPE BETWEEN DESIGNATED LOCATIONS WITH NO SAGS OR HUMPS. THE MINIMUM SLOPE FOR ALL SEWER PIPING SHALL BE 1/4"/FT. (2%) UNLESS OTHERWISE INDICATED. 7.NO HEAVY EQUIPMENT OR VEHICULAR TRAFFIC SHALL BE ALLOWED WITHIN THE LIMITS OF THE TREATMENT SYSTEM AFTER FILL BOTH DURING OR AFTER CONSTRUCTION. 8.PLACEMENT OF STONE AND PIPE SHALL BE AS SHOWN AND CARE SHALL BE TAKEN TO AVOID INCLUSION OF FINE GRAINED SOIL AND WASTE MATERIAL IN THE SAND AND PIPING. 9.AFTER EXCAVATING EACH TRENCH TO THE DEPTHS REQUIRED, THE WALLS AND FLOORS OF EACH TRENCH SHALL BE CLEANED AND RAKED TO ACHIEVE AN EVEN SECTION AND TO LOOSEN SMEARED AREAS. 10.TOPSOIL AND SEED THE TREATMENT SYSTEM AREA AND ALL OTHER DISTURBED AREAS IMMEDIATELY AFTER CONSTRUCTION. 11. NOTIFY THE ENGINEER AT THE FOLLOWING PHASES OF CONSTRUCTION: - UPON COMPLETION OF DISTRIBUTION LATERAL INSTALLATION, PRIOR TO BACKFILLING THE BED AREA. 12.UPON COMPLETION OF CONSTRUCTION THE CONTRACTOR SHALL PREPARE A MAP OF AS-BUILT CONDITIONS INDICATING A MINIMUM OF TWO TIE DIMENSIONS FROM ADJACENT CORNERS OF THE RESIDENCE TO THE SEPTIC TANK INLET AND OUTLET COVERS, AND EACH CORNER OF THE LEACH FIELD. TEST PIT AND PERCOLATION TEST LOG TEST PIT (TP-1)0" TO 6" TOPSOIL & ORGANICS 6" TO 72" LIGHT BROWN POORLY GRADED SAND NO BEDROCK OR GROUNDWATER ENCOUNTERED PERC. TEST (PT-1) STABILIZED PERC. RATE = 1 MIN. 38 SEC. TEST AT ±15 IN. BELOW EXIST. GRADE PERC. TEST (PT-2) STABILIZED PERC. RATE = 3 MIN. 46 SEC. TEST AT ±12 IN. BELOW EXIST. GRADE TEST PIT NO. 1 WAS EVALUATED AND WITNESSED BY MATTHEW E. HUNTINGTON, PE ON APRIL 30, 2021. PERC. TESTS NO. 1 AND 2 WERE PERFORMED BY MATTHEW E. HUNTINGTON, PE ON APRIL 30, 2021. STORMWATER MANAGEMENT NOTES 1.STORMWATER CONTROL MEASURES SHALL BE INSTALLED AS INDICATED ON THESE DRAWINGS TO MANAGE STORMWATER RUNOFF FOR THE 25-YEAR STORM EVENT VOLUME THAT IS GENERATED FROM NEWLY CREATED IMPERVIOUS AREAS. 2.THE INFILTRATION BASIN AREA SHALL BE SEEDED WITH SEED MIX THAT INCLUDES 70% CREEPING RED FESCUE AND 30% BLEND OF SHADE-TOLERANT FESCUE. SEED MIX LBS/1,000 SQ. FT. SHALL BE COMPLIANT WITH NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, PAGE 4.46. 3.ANY LITER PRODUCED ON-SITE DURING THE COURSE OF CONSTRUCTION, INCLUDING CONSTRUCTION DEBRIS, SHALL BE PICKED UP EACH DAY AND DISPOSED OF IN SOLID WASTE CONTAINERS. THE CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL AND PETROLEUM TEMPORARILY STORED ON-SITE. 4.PRIOR TO COMMENCING ANY LAND CLEARING, SILT FENCE SHALL BE INSTALLED IN ACCORDANCE WITH THESE DRAWINGS. THE CONTRACTOR IS REQUIRED TO MAINTAIN AND REPLACE AS NEEDED ALL SILT FENCE THROUGHOUT THE COURSE OF CONSTRUCTION. 5.ALL EXPOSED SURFACES NOT COVERED WITH PAVING, STRUCTURES, OR SIMILAR FINISHES SHALL BE COVERED WITH 3" MIN. OF TOPSOIL AND SEED TO ESTABLISH TURF COVERING IMMEDIATELY FOLLOWING THE COMPLETION OF CONSTRUCTION. SEED MIX SHALL INCLUDE 70% CREEPING RED FESCUE AND 30% BLEND OF SHADE-TOLERANT HARD FESCUE. SEED MIX LBS/1,000 SQFT SHALL BE COMPLIANT WITH NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, PAGE 4.46. 6.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED PERIODICALLY BY A QUALIFIED INSPECTOR IN ACCORDANCE WITH PART IV. OF THE NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION GENERAL PERMIT FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITY, GP-0-20-001. EARTHWORK NOTES 1.EXCAVATION SHALL BE TO ELEVATIONS INDICATED WITH A TOLERANCE OF PLUS/MINUS 1". 2.SUBBASE COURSE MATERIAL SHALL CONFORM TO NYS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS SECTION 304, TYPE 2 AND SHALL CONFORM TO MIN 95% MODIFIED PROCTOR DENSITY. 3.MATERIAL STOCKPILES, IF REQUIRED, SHALL BE LOCATED WHOLLY WITHIN THE WORK AREA. ADDITIONAL SILT FENCES SHALL BE PROVIDED AT THE BASE OF ALL STOCKPILES AS DIRECTED IN THE FIELD BY THE ENGINEER. 4.ALL TRENCHES AND OTHER EXCAVATION SIDE SLOPES INDICATED ON THE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT INTENDED TO INDICATE A STABLE EXCAVATION SLOPE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ADEQUACY AND STABILITY OF ALL EXCAVATION SLOPES, SHEETING, SHORING, TRENCH BOXES, AND ANY OTHER MEANS REQUIRED FOR A SAFE WORK ENVIRONMENT AND FOR PROTECTION OF ADJACENT ROADWAYS AND OTHER STRUCTURES. ALL EXCAVATION WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING REGULATORY AGENCIES: - SUBPART 23-4, "EXCAVATION OPERATIONS", OF NEW YORK DEPARTMENT OF LABOR INDUSTRIAL CODE RULE 23. - SUBPART P, "EXCAVATIONS" OF THE UNITED STATES DEPARTMENT OF LABOR OSHA REGULATIONS FOR CONSTRUCTION. - ALL OTHER MUNICIPAL, COUNTY, STATE OR FEDERAL AGENCIES, REGULATIONS OR LAWS PERTAINING TO EXCAVATION SAFETY AS MAY APPLY AT THE WORK SITE. THE MORE STRINGENT PROVISION IN EACH OF THE ABOVE CODES SHALL APPLY. THESE PROVISIONS SHALL BE CONSIDERED MINIMUM REQUIREMENTS AND SHALL BE INCREASED IF NECESSARY TO PROVIDE SAFE WORKING CONDITIONS. 5.CRUSHED STONE, WHERE CALLED FOR ON THESE DRAWINGS, SHALL CONFORM TO NYS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS SECTION 703-02, SIZE DESIGNATION 2. 6.ALL NEW GRADES SHALL BE BLENDED SMOOTHLY WITH EXISTING GRADES TO PROVIDE A SMOOTH TRANSITION BETWEEN NEW GRADING AND EXISTING SURFACES TO REMAIN. 7.ALL SILT FENCES SHALL BE INSTALLED PRIOR TO DISTURBANCE OF EXISTING SITE FINISHES AND SHALL REMAIN IN PLACE UNTIL A STABLE GROWTH OF TURF IS ESTABLISHED. 8.ALL DISTURBED AREAS NOT COVERED WITH SITE IMPROVEMENTS OR LANDSCAPING SHALL BE COVERED WITH 3" OF TOPSOIL AND SEEDED TO ESTABLISH A DENSE GROWTH OF TURF. 9.SEED MIX SHALL INCLUDE 70% CREEPING RED FESCUE AND 30% BLEND OF SHADE-TOLERANT HARD FESCUE. SEED MIX LBS/1,000 SQFT SHALL BE COMPLIANT WITH NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, PAGE 4.46. NOTE: COORDINATE HOUSE SEWER PIPE INVERT ELEVATION AT HOUSE FOUNDATION TO PROVIDE GRAVITY FLOW TO AES PIPE. MIN. GRAVITY SEWER PIPE SLOPE SHALL BE 14"/FT AT ALL LOCATIONS. 2" HARDWOOD FENCE POSTS, MIN. 36" LONG, DRIVEN 16" INTO GROUND 10' MAX. ℄ TO ℄ SECTION VIEW16" MIN. ABOVE GRADE8" MIN.BELOW GRADE2' OVERALL FABRIC HEIGHTFLOW WOVEN WIRE FENCE (MIN. 14 GAUGE W MAX 6" MESH SPACING) 36" MIN. FENCE POST WOVEN WIRE FENCE (MIN. 14 12 GAUGE W/ MAX. 6" MESH SPACING) WITH FILTER CLOTH FLOW 20" MIN.16" MIN.UNDISTURBED GROUNDEMBED FILTER CLOTH A MIN. OF 8" IN GROUND 4" COMPACTED SOIL NOTES: 1.WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE HARDWOOD. 2.FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 34" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 6" MAX MESH OPENING. 3.WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FIXTER X, MARAFI 100X, STABILINKA T140N OR APPROVE EQUIVALENT IF USING THE WOVEN WIRE FENCE. IF THE WOVEN WIRE FENCE IS NOT USED, FILTER FABRIC MUST BE NYSDOT APPROVED MATERIAL LIST FOR SILT FENCE, UNSUPPORTED 1.2M POST SPACING PERSPECTIVE VIEW 1 SILT FENCE DETAIL SCALE: N.T.S.FLOW 0 GRADING, DRAINAGE AND UTILITIES PLAN SCALE: 1' = 20" 1 12" NYS DOT 401 TYPE 7 TOP COURSE 2 12" NYS DOT 401 TYPE 3 BINDER COURSE NYS DOT ITEM 304-2.03 TYPE 2 GRAVEL SUBBASE COMPACTED SUBGRADE12"2 ASPHALT PAVEMENT DETAIL SCALE: N.T.S. 1'-0"2'-0'1'-0" TOP OF BERM EL.SEE PLANS. BOTTOM OF BERM EL. SEE PLANS. VARIES ( 3 : 1 M A X ) VARIES ( 3 : 1 M A X ) 12" TICK MAT OF STONE FILL (LIGHT) GEOTEXTILE SEPARATION FABRIC 12" 12" TICK MAT OF STONE FILL (LIGHT) GEOTEXTILE SEPARATION FABRIC 2'-0" MIN. SEE PLANS 3 STONE WEIR OVERFLOW DETAIL SCALE: N.T.S. 12"12" 12"CREST EL. SEE PLANS 3 SAVE DATE: 5/6/2021 5:32 PMFILE NAME: Z:\Projects\2021 Projects\21044 - FHB Moon Hill Place\DWG\03 SHEETS\C-3.10 Construction Details.dwgPLOTTED BY:QUINN ROESCHDESIGN BY:DRAWN BY:CHECKED BY:############CONSTRUCTION DETAILSC-3.10 3 DRAWING NO. PROJECT NO.PROJECTDRAWING TITLEDATE:REVISIONSDATEDESCRIPTIONSTUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, TO ALTER ANY ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION, AND SPECIFIC DESCRIPTION OF THE ALTERATION. 05/05/2020 2104411 MOON HILL PLACETOWN OF QUEENSBURY, NY TAX MAP ID: 289.7-2-2FOOTHILL BUILDERS9 MOUNTAINSIDE DRIVEQUEENSBURY, NY 12804DRAWINGS NOT FOR CONSTRUCTION DWG OFPREPARED FORDIG SAFE NOTE: THIS PLAN SET WAS DRAFTED WITHOUT THE BENEFIT OF "DIG SAFE" MARKINGS. UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT "DIG SAFE" AT 811 BEFORE COMMENCING ANY WORK AND SHALL PRESERVE EXISTING UTILITIES WHICH ARE NOT SPECIFIED TO BE REMOVED IN THIS PLAN SET. MAP INFORMATION: BASE MAP INFORMATION WAS OBTAINED FROM "MAP OF A SURVEY MADE FOR MARIA LEUCI, TOWN OF QUEENSBURY, COUNTY OF WARREN, STATE OF NEW YORK", DATED APRIL 27, 2021, PREPARED BY RUSEL E. HOWARD LICENSED LAND SURVEYING. 12" MIN. OF CLEAN SAND OR PEA GRAVEL FOUNDATION INLET FORT MILLER PRECAST DISTRIBUTION BOX OR APPROVED EQUAL 4" PVC GRAVITY SEWER @0.5% MIN. SLOPE PROVIDE ADJUSTABLE LEVELING DEVICE ON EACH OUTLET TREATED LUMBER MARKER ABOVE ALL BURIED COVERS; SET LEVEL W/GRADE OUTLETAS REQ'D3 PRECAST DISTRIBUTION BOX DETAIL SCALE: N.T.S. 24" TYP.4' MIN.24"4' MIN 24" 2" MIN 6" MIN 12" TO 18" 6" TO 12" UNTREATED BUILDING PAPER OR PERMEABLE GEOTEXTILE CRUSHED STONE 34" MIN. TO WASHED GRAVEL 1 12" MAX. BEDROCK, GROUND WATER, OR IMPERMEABLE SOIL UNDISTURBED SUBGRADE PERFORATED 4" DIA. PVC DISTRIBUTOR PIPE WITH PERFORATIONS INSTALLED DOWN FINISHED GRADE SLOPE SLOPE TRENCH PROFILE 18" TO 30" UNTREATED BUILDING PAPER OR PERMEABLE GEOTEXTILE TYP. PIPE JOINT BACKFILL WITH EXCAVATED NATIVE MATERIAL LEVEL TRENCH BOTTOM2' MIN. TO RESTRICTIVE LAYER 2" MIN. CRUSHED STONE 34" MIN. TO WASHED GRAVEL 1 12" MAX. NATIVE UNDISTURBED SUBGRADE 8" MAX. 6" MIN 12" MAX. 6" MIN. NOTES: 1.DO NOT INSTALL ABSORPTION TRENCHES IN WET SOIL. 2.RAKE SIDES AND BOTTOM OF TRENCH PRIOR TO PLACING CRUSHED STONE/GRAVEL. ANY COBBLES 2" AND GREATER SHOULD BE REMOVED FROM DIRECTLY BELOW TRENCH BOTTOM. 3.INSTALL SOLID END CAPS AT ENDS OF ALL DISTRIBUTOR PIPES. 4.BACKFILL MATERIAL SHALL NOT CONTAIN STONES OR COBBLES LARGER THAN 2" IN DIAMETER 5.TRENCH BOTTOMS SHALL BE PARALLEL TO GROUND CONTOURS. 6.A DIVERSION TRENCH SHALL BE CONSTRUCTED UPHILL FROM THE FILL TO PREVENT SURFACE RUNOFF FROM ENTERING THE SYSTEM AREA. 7.HEAVY EQUIPMENT SHALL BE KEPT OUT OF THE ABSORPTION AREA. 8.THE SEPTIC FIELD IS DESIGNED BASED ON THESE PROJECTED FLOW RATES. ANY USE OF THE BUILDING THAT HAS A GREATER DISCHARGE OF WASTEWATER FLOW THAN DESIGNED WITH REQUIRE REDESIGN OF THE SUBSURFACE DISPOSAL SYSTEM. TRENCH SECTION 2' MIN. TO RESTRICTIVE LAYER 3" MIN. TOPSOIL & SEED PERFORATIONS TO BE INSTALLED DOWN (TYP.) TYPICAL DISTRIBUTOR PIPE SLOPE: 116" TO 132" PER FOOT 1 CONVENTIONAL ABOSRPTION TRENCH SYSTEM DETAIL SCALE: N.T.S. 2 SEPTIC TANK DETAIL SCALE: N.T.S. C OPENINGL C OPENINGL INLET INVERT EL. MIN. 2" ABOVE OUTLET INVERT.D=30" MIN.FLOWFLOW L 0.3 LD/32" MIN.1'-4"MIN.1'-6"MIN.MANUFACTURER'S STANDARD OPENING AND COVER, (TYP.) WALL FOR DUAL CHAMBER TANK. SEE NOTE BELOW UNDISTURBED SOIL INVERT OF SLOT OR HOLES CONNECTING CHAMBERS OF DUAL CHAMBER TANK LIQUID LEVEL LOCATION MARKER, (TYP.) FINISH GRADE, (TYP.) MIN.18"Ø OPENING, EA. END OF TANK. (TYP.) SANITARY TEE #2 CRUSHED STONE PLACED ON AND WRAPPED WITH GEOTEXTILE FABRIC NOTES: 1.PROVIDE FLEXIBLE PIPE BOOTS AT ALL PENETRATIONS INTO ALL TANKS. 2.FOR DUAL CHAMBER TANK, WALL SHALL HAVE A 4"V. x 18" WIDE SLOT, OR (4) 4"Ø HOLES, INVERT LOCATED AS SHOWN. DUAL CHAMBER TANKS SHALL BE PROVIDED FOR ALL SEPTIC TANKS WITH AN INTERIOR LENGTH GREATER THAN OR EQUAL TO 10 FT. 12" MIN (TYP.)8" MIN(TYP)8" MIN.1'-4"MAX1" MIN.AIR GAP1'-6" MIN. TYP. 4" THICK X 1'-6"W ANTI-FLOATATION COLLAR (TYP.) 4 LIGHT DUTY DRAIN BASIN DETAIL SCALE: N.T.S. PRE-FABRICATED PVC DRAIN BASIN AS MANUFACTURED BY NYLOPLAST OR APPROVED EQUIVALENT. BACKFILL W/COMPACTED GRANULAR FILL MATERIAL. 6"Ø CORR. HDPE STORM PIPE TO OUTLET AT LOCATION INDICATED ON THE CONSTRUCTION DRAWINGS. SEE PLANS FOR INLET INV. AND OUTLET INV. EL. INLET & OUTLET ADAPTER PER MANUFACTURER'S SPECIFICATIONS NYLOPAST LIGHT DUTY GRATE. SEE PLANS FOR RIM EL. AND DIAMETERFINISHED GRADE, SEE PLAN. MIN. 6" THICK CRUSHED STONE 5 TYPICAL WELL DETAIL SCALE: N.T.S. PITLESS ADAPTER WITH SANITARY SEAL FOR DISCHARGE PIPE. BENTONITE GROUT AROUND CASING TO ROCK AND ASSPECIFIED IN APPENDIX 5-B. WATER QUALITY SAMPLING SHALL BE DETERMINED FOR INDIVIDUAL DRILLED WELLS. WATER QUALITY SHOULD COMPLY WITH 10NYCRR PART 5, TITLED DRINKING WATER STANDARDS. THE MINIMUM WATER QUALITY PARAMETERS TO BE TESTED SHALL INCLUDE COLIFORM BACTERIA, LEAD, NITRATE, NITRITE, IRON, MANGANESE, IRON PLUS MANGANESE, SODIUM, pH, HARDNESS, ALKALINITY AND TURBIDITY. ADDITIONAL SAMPLING MAY BE NECESSARY BASED ON PROXIMITY OF THE WELL TO POTENTIAL SOURCES OF CONTAMINATION. WATER QUALITY SAMPLES THAT DO NOT MEET POTABILITY STANDARDS WILL REQUIRE TREATMENT TO MEET THE DRINKING WATER STANDARDS. WHEN WELL WATER TREATMENT IS NECESSARY TO MEET THE DRINKING WATER STANDARDS, ONLY WHOLE HOUSE TREATMENT IS RECOMMENDED, EXCEPT FOR SOFTENING. WHEN WATER SOFTENING TREATMENT IS PROVIDED ONLY THE WATER FLOWING TO THE WATER HEATER, LAUNDRY AND BOILER SHOULD BE SOFTENED TO PRODUCE A BLENDED WATER HARDNESS OF 50 - 80 mg/l. TREATMENT MAY BE INSTALLED FOR IRON REMOVAL, MANGANESE REMOVAL, CORROSION CONTROL, SOFTENING, TASTE/ODOR CONTROL, FLUORIDE REDUCTION, DEGASIFICATION AND ORGANIC CHEMICAL REMOVAL. AQUIFERS EXHIBITING BIOLOGICAL CONTAMINATION OR TURBIDITY, EXCEEDING THE DRINKING WATER STANDARD OF 5 NTU, ARE NOT APPROPRIATE FOR INDIVIDUAL WATER SUPPLY DEVELOPMENT. OXIDIZED IRON OR MANGANESE TURBIDITY SHOULD NOT BE INCLUDED WHEN DETERMINING TURBIDITY VALUES SINCE BOTH MAY BE REMOVED BY TREATMENT. TREATMENT FOR TURBIDITY REMOVAL MAY BE ACCOMPLISHED VIA AN INLINE CARTRIDGE FILTRATION SYSTEM CAPABLE OF FILTERING PARTICLES GREATER THAN 5 MICRONS (i.e., 5 MICRON ULTIMATE FILTRATION CAPACITY). DRINKING WATER TREATMENT UNITS SHALL CONFORM WITH ALL APPLICABLE NSF STANDARDS. NSF CERTIFIED PRODUCTS ARE LISTED IN A SEARCHABLE DATABASE ON THE INTERNET AT http://www.nsf.org THE INDIVIDUAL DRILLED WELL SHALL BE CONSTRUCTED IN ACCORDANCE WITH 10NYCRR APPENDIX 5-B, TITLED "STANDARDS FOR WATER WELLS". AFTER A NEW WELL HAS BEEN CONSTRUCTED OR AN EXISTING WELL HAS BEEN REPAIRED OR SERVICED IN A MANNER THAT REQUIRES THE OPENING OF THE WELL CASING, THE WELL SHALL BE PUMPED TO WASTE UNTIL THE PUMPED WATER IS REASONABLY CLEAR. AFTER PUMPING TO WASTE, THE WELL, PUMPING EQUIPMENT, AND BUILDING PLUMBING SHALL BE DISINFECTED BEFORE BEING PUT INTO USE. DISINFECTION SHALL BE CONDUCTED IN ACCORDANCE WITH NYSDOH POLICY. INDIVIDUAL WELLS SHOULD, IF POSSIBLE, BE CONSTRUCTED TO PRODUCE A MINIMUM LONG-TERM SUSTAINABLE YIELD OF 5 GPM OR MORE. WHERE THIS CAN NOT BE ACHIEVED, THE FOLLOWING TABLE CAN BE USED TO HELP SELECT WATER STORAGE THAT WILL ALLOW LOW YIELD WELLS TO MEET PEAK HOUSEHOLD WATER DEMAND. THIS STORAGE CAN BE PROVIDED BY A TANK, STORAGE IN THE WELL, OR A COMBINATION OF BOTH. PRESSURE STORAGE TANK MINIMUM SIZE: 2 BEDROOM HOUSE - 42 GAL 3 OR 4 BEDROOM HOUSE - 82 GAL 5 BEDROOM HOUSE - 120 GAL TANK PRESSURE OF 60 PSI. 20'-0" MIN. THROUGH OVERBURDEN, OR 5'-0" BELOW PUMPING LEVEL.SEE APPENDIX 5-B, TALBE 2. 5 GPM @ A STORAGE MINIMUM CAPACITYSUBMERSIBLE PUMP DROP PIPE WELL CASING VENTED WELL CAP WITH SANITARYSEAL FOR ELECTRICAL CABLES.18''MIN.PITLESS CASE MOTOR CABLE BUILDING FOUNDATION 1. 2. 3. 4. 5. 6. NOTE: THE MINIMUM WELL SEPARATION DISTANCES FROM CONTAMINANT SOURCES (WASTEWATER DISPOSAL SYSTEMS, ETC.) SHALL BE INCREASED BY 50% WHENEVER AQUIFER WATER ENTERS THE WATER WELL AT LESS THAN 50 FEET BELOW GRADE. IF A 50% INCREASE IN SEPARATION DISTANCES CANNOT BE ACHIEVED, THEN 50 FEET OF CASING BELOW GRADE SHALL BE PROVIDED. 3