Loading...
Staff Notes for 7/27/2021 Town of Queensbury Planning Board Community Development Department Staff Notes July 27, 2021 Site Plan 40-2021 DAVID & PAMELA WAY 33 Canterbury Drive / WR – Waterfront Residential / Ward 1 SEQR Type II Material Review: application, survey, septic information, elevations and floor plans, revised plan Parcel History:AV 32-2020 Dock, AV 42-2021 __________________________________________________________________________________________ Requested Action Planning Board review and approval for a 259 sq. ft. single story addition to an existing 518 sq. ft. single story home. Resolutions 1. PB decision Project Description Applicant proposes a 259 sq. ft. single story addition to and 57 sq ft porch an existing 518 sq. ft. single story home. The project includes site work removing a portion of a patio, upgrading the patio, installation of eave trenches and use existing septic system. Pursuant to Chapter 179-3-040, 179-4-010, 179-6-065 & 179-8-040 of the Zoning Ordinance, new floor area in a CEA and hard surfacing within 50 ft of the shoreline shall be subject Variance: to Planning Board review and approval. Relief is sought for setbacks and permeability. Planning Board shall provide a recommendation to the Zoning Board of Appeals. Staff Comments  Location-The project is located at 33 Canterbury Lane on Glen Lake. The parcel is 0.19 size  Arrangement- The existing site has a home and a recently approved dock.  Site Design- The project includes a 259 sq ft addition and a 57 sq ft porch to the existing home, use of the existing septic system and water is drawn from the lake. The project includes site work to remove an existing stone patio on the south area of the site that is to be removed. The project includes the update of the patio with a paver patio – was a brick patio of 413 sq ft has been reduced to 377 sq ft of paver patio.  Building – The existing home is 518 sq ft single story and the addition is to be 259 sq ft also a single story. The addition includes a new entry area into the home with a 57 sq ft porch. Total floor area of 834 sq ft The project includes a new fire place to be installed and is a wood pellet stove.  Grading and drainage plan, Sediment and erosion control-The plans show there is to be an eave trench on earth side of the new addition. The plans may need to reflect erosion control measures for the addition.  Landscape plan-The project site is located on Glen Lake and is subject to the shoreline buffer review. The plans indicate existing shoreline vegetation to remain and includes some trees and shrubs, there is also to be additional plantings when the addition is completed. Below are the guidelines from the shoreline buffer code section, Section 179-8-040 -Minimum width 20 ft (Glen Lake) -For every 700 sq ft of shoreline buffer area –one large tree minimum 3 inches in diameter -For every 350 sq ft of ground cover -7 – 24 in native shrubs; 14 herbaceous plants Project site -48.3 ft of shoreline per survey -Shoreline buffer 48.3 ft X 20 ft width is 966 sq ft -Shoreline buffer area -966/700 = 1.38 round up to 2 –two large trees at 3inch diameter -Ground cover -966/350 =2.76 round up to 3 (X7) =21 native shrubs and 3 (X14) herbaceous plants=42  Site lighting plan-The information indicates down cast fixtures recessed at the entrance areas of the home.  Utility details-The application indicates there an existing system and water is drawn from the lake. The existing septic system was installed in 2015 and the applicant has indicate the addition was contemplated at that time 2 bedroom. The plans show an overhead utility line that is to remain.  Elevations-The plans show the view of the addition and the existing home  Floor plans-The floor plans show the existing home has one bedroom and the new addition allows for an additional bedroom. The floor plans shows the open area and kitchen are to remain.  Waivers-Planning staff has reviewed the applicants request for waivers that include items, h. signage, j. stormwater, k. topography, l. landscaping, n traffic, , q. soil logs, r. construction/demolition disposal s. snow removal.  The waivers requested–Staff would suggest the board request additional information in regards to landscaping on site and to confirm the eave trenches address stormwater from the new addition. The board may request if there is additional stormwater management on the site. The applicant has provided information for g. site lighting and p. floor plans. o. commercial alterations/ construction details.  Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the written request of an applicant. The Board is to review the waivers and to determine if they are to be granted. Nature of Area Variance Granted 7/21/2021. The applicant proposes an addition entry area that is to be 9 ft 9 ¾ inches and 9 ft 9 inches to the side property line where a 20 foot setback is required. The addition is to be 34 ft 1 inch to the shoreline where a 50 ft setback is required. The site permeable decrease to 72.36% where 75% is required. Summary The applicant has completed a site plan application for the additions to an existing home and associated site work. Meeting History: PB: 7/20/21; ZBA: 7/21/21; - 2 -