Staff Notes for 8/24/2021
Town of Queensbury Planning Board
Community Development Department Staff Notes
August 24, 2021
Site Plan (M) 45-2021 STEWART’S SHOPS CORPORATION
777 Quaker Road / CI – Commercial Intensive / Ward 2
SEQR Type II
Material Review: application, survey, site plan and elevations
Parcel History:AV 5-1989, SP 20-1989, SP 59-2004, SP 8-2007, SP 60-2010, SEP 789-2016,
AV 50-2021
______________________________________________________________________________________
Requested Action
Planning Board review and approval for a 744 sq. ft. addition to an existing 2,954 sq. ft. building and a 100 sq.
ft. new roof overhang, both on the west side of the building.
Resolutions
1. PB decision
Project Description
Applicant proposes Applicant proposes a 744 sq. ft. addition to an existing 2,954 sq. ft. building and a 100 sq.
ft. new roof overhang, both on the west side of the building. Also included is repainting of the façade and
addition of stone veneer on three sides of the building. Pursuant to Chapter 179-9-120 of the Zoning Ordinance,
modifications to an approved site plan shall be subject to Planning Board review and approval.
Staff Comments
Location-The project site is located at 777 Quaker Road on a 1.513 acre parcel.
Arrangement- The site has an existing 2,954 sq ft building and 1,516 sq ft fuel canopy. The site has
associated parking, drive aisles/access and landscaping.
Site Design- The project includes a 744 sq ft addition and 100 sq ft over hang to the rear of the building.
Building – The addition is to provide more space to the interior of the building. The overhang is for exterior
door and some equipment coverage.
Site conditions-The lane width at the rear of the building is now 22 ft where traffic is still allowed for
deliveries. The board may suggest a one way arrangement, possibly signage so to minimize any traffic
conflict
Traffic- The site currently has 25 parking spaces and 26 are proposed where 25 spaces is required.
(compared as-built survey to proposed site-plan)
Grading and drainage plan, Sediment and erosion control-There are no changes to the existing conditions for
site in regards to stormwater management.
Landscape plan- There are no changes to the existing conditions for site in regards to landscaping.
Site lighting plan-The plans indicate there will be wall lights on the rear of the building and canopy lighting
for the new addition areas. The plans do not indicate the exact lighting fixture, however the applicant has
indicate the entire site lighting foot candle average is 1.24 Fc.
Utility details-There is no proposed changes to the existing utilities.
Signage-There are no proposed changes to the existing signage.
Elevations-The elevation plans show the sides of the building with the addition and the roof overhang area.
Floor plans- - The floor plan shows the entire store and includes the new addition area.
Waivers-Planning staff has reviewed the applicants request for waivers that include items, h. signage, j.
stormwater, k. topography, l. landscaping s. snow removal.
The waivers requested–Staff finds it reasonable to request a waiver as these are no changing on the site
and are to remain the same. The applicant has provided information on. g. site lighting, n traffic, o.
commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition
disposal.
Pursuant to Section 179-9-050 the Planning Board may grant waivers on its own initiative or at the
written request of an applicant. The Board is to review the waivers and to determine if they are to be
granted.
Nature of Area Variance
Granted 8/18/2021.The addition is to be located 27 ft from the setback and the roof overhang is to be located 22
ft. The 22 ft setback also coincides with the bollard locations to the rear of the building. A 25 ft setback is
required.
Summary
The applicant has completed a site plan application for the addition of 744 sq ft to the existing 2,954 sq ft
building and a 100 sq ft overhang to the west side of the building.
Meeting History: PB: 8/17/21; ZBA: 8/18/21;
- 2 -