Loading...
PT-0398-2021 HARP ENGINEERING RESIDENTIAL, COMMERCIAL&.MUNICIPAL-S(TE DESIGN&DEVELOPMENT 1969 FERNDALE ROAD CASTLETON,NY 12033 (518)479-4014 FAX(518)477-6371 STEVEN P.HART;P.E. Town of Qumn'sbury October 15,2021 , 742 Bay Road Queensliu- New-York 12804 . Attn:Mr.Mark:Srriith,:Code Enforcement Officer- Re: Childrose Septic System Replacement 9.7 Fitzgerald Road=Town of Queensbury Dear MIr. Smith: With;respect to the;aboye replacement septic field:installation;we offer-you'the-following inforiiiation: 1. As,Built drawing as provided by the Owner, and 2. :Material list spec'sheets as ptouided by the Contractor;Mr. Chris Bell, With respect to the,-provided information as noted above, it appears that the holding tanks and related:appurtenances.were installed in substantial conformance to the approved plans: It.is tnportant:to.note that Hart Engineering did:.not perform:any-construct on inspections during-,or after;.the-construction process, :We.w-ere.not aware.that this was:a requirement and therefore did not perform theseservices. Out conclusion.of"substantial conformance".is based on conversations with the Contractor during.construction and with the owner following constructioni. Should.you have-Any questioris_or:require additional in o_rmation please.feel free to. contact us. Very.truly yours; Hart E►:gingering, / �n teven P..Hart,P.E. cc:File:childrosdqueensbury2l-4