PT-0398-2021 HARP ENGINEERING
RESIDENTIAL, COMMERCIAL&.MUNICIPAL-S(TE DESIGN&DEVELOPMENT
1969 FERNDALE ROAD CASTLETON,NY 12033 (518)479-4014 FAX(518)477-6371
STEVEN P.HART;P.E.
Town of Qumn'sbury October 15,2021 ,
742 Bay Road
Queensliu- New-York 12804 .
Attn:Mr.Mark:Srriith,:Code Enforcement Officer-
Re: Childrose Septic System Replacement
9.7 Fitzgerald Road=Town of Queensbury
Dear MIr. Smith:
With;respect to the;aboye replacement septic field:installation;we offer-you'the-following
inforiiiation:
1. As,Built drawing as provided by the Owner, and
2. :Material list spec'sheets as ptouided by the Contractor;Mr. Chris Bell,
With respect to the,-provided information as noted above, it appears that the holding tanks
and related:appurtenances.were installed in substantial conformance to the approved
plans:
It.is tnportant:to.note that Hart Engineering did:.not perform:any-construct on
inspections during-,or after;.the-construction process, :We.w-ere.not aware.that this was:a
requirement and therefore did not perform theseservices. Out conclusion.of"substantial
conformance".is based on conversations with the Contractor during.construction and with
the owner following constructioni.
Should.you have-Any questioris_or:require additional in o_rmation please.feel free to.
contact us.
Very.truly yours;
Hart E►:gingering,
/ �n
teven P..Hart,P.E.
cc:File:childrosdqueensbury2l-4